Skip to content

We pay for the planning.

Call us:020 3953 5635

Areas we cover

Selling Land in Devon

Checked on

Devon runs from Exmoor and the Hartland cliffs to the Tamar and the Dorset border, and ten councils plan the land between its two National Parks. Torbay alone is below the 75% delivery line, yet only Exeter and Teignbridge can show five years of housing land, and five councils share a shortfall with their neighbours under joint plans.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential across Devon and welcome land of every kind in all ten of its council areas: fields and paddocks, inherited land, old yards and larger holdings.

Eight of Devon's ten councils are short of the five years of housing land national policy expects, and one built fewer than 75% of the homes it needed in the government's latest count. In those council areas, national policy counts that as evidence that more homes are needed, so a well placed field next to a town or village can make a case outside the local plan, weighed with everything else. Elsewhere the local plan is the surest route. Land in the Green Belt faces stricter national tests. The table below shows each council.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

Selling Land in Devon, Council by Council

The table shows each council's result in the government's Housing Delivery Test 2025 and where its plan stands; the five councils scored in two joint groups show their shared result.

Housing delivery and local plan position of each council in Devon
CouncilHousing Delivery Test 2025Five-year land supplyMost recent strategic plan adoptedNew plan progress
East Devon84%Buffer3.5 yearsShort of five yearsAt March 2025: East Devon District Council: Housing Monitoring Update to 31 March 2025 (Strategic Planning Committee report)January 2016A second Regulation 19 version of the East Devon Local Plan 2020 to 2042, including the proposed new town of Marlcombe, was published for consultation from 28 November 2025 to 26 January 2026. The council's Local Development Scheme of June 2026 moved submission for examination to October 2026, with adoption expected in 2028Checked November 2026 on the council or government website
Exeter102%5.29 yearsAt April 2026: Exeter City Council: Five Year Housing Land Supply Statement (June 2026)February 2012The Exeter Plan (2021 to 2041) was submitted for examination on 26 September 2025 and hearings were held between 3 March and 22 May 2026. The inspectors' post-hearings letter of 15 September 2026 asked for the Matford Lane allocation to be deleted, and main modifications were being prepared for consultation; the council's data of June 2026 targets adoption in March 2027Checked November 2026 on the council or government website
Mid Devon103%2.4 yearsShort of five yearsAt March 2025: Mid Devon District Council: Five Year Housing Land Supply Position (March 2025)July 2020Plan Mid Devon (2026 to 2046) began in May 2026 under the new plan-making system, with a scoping consultation that closed on 10 July 2026. The council's timetable of May 2026 puts the content and evidence consultation from 22 January to 8 March 2027, submission on 4 September 2028 and consideration of adoption on 1 April 2029Checked November 2026 on the council or government website
North Devon122%Joint result for the North Devon and Torridge Local Plan area (North Devon and Torridge)4.61 yearsShort of five yearsSource: Torridge District Council: Plans Committee public reports pack (5 February 2026)October 2018The North Devon and Torridge Local Plan (adopted October 2018) remains in force. The two councils began a new joint plan, A Plan for Northern Devon, under the new system with a notice on 30 June 2026 and a scoping consultation that closed on 11 August 2026; their June 2026 timetable puts consultation on content and evidence from 10 February to 24 March 2027, the proposed plan from 2 February to 29 March 2028, submission on 30 September 2028 and adoption on 30 April 2029Checked November 2026 on the council or government website
Torridge122%Joint result for the North Devon and Torridge Local Plan area (North Devon and Torridge)4.61 yearsShort of five yearsSource: Torridge District Council: Plans Committee public reports pack (5 February 2026)October 2018The North Devon and Torridge Local Plan (adopted October 2018) remains in force. The two councils began a new joint plan, A Plan for Northern Devon, under the new system with a notice on 30 June 2026 and a scoping consultation that closed on 11 August 2026; their June 2026 timetable puts consultation on content and evidence from 10 February to 24 March 2027, the proposed plan from 2 February to 29 March 2028, submission on 30 September 2028 and adoption on 30 April 2029Checked November 2026 on the council or government website
Plymouth87%Action planJoint result for the Plymouth and South West Devon Joint Local Plan area (Plymouth, South Hams and West Devon)2.06 yearsShort of five yearsAt April 2026: Plymouth City Council: 5 Year Housing Land Supply Position Statement and Housing Delivery Test result, 2026 statement (November 2026)March 2019The Plymouth and South West Devon Joint Local Plan (adopted March 2019) remains the plan for the city. Plymouth is preparing its own Plymouth Local Plan: it gave notice on 25 June 2026, held a scoping consultation from 2 to 31 July 2026 and published its Gateway 1 summary on 26 October 2026. Its timetable puts submission on 27 October 2028 and adoption on 24 April 2029Checked November 2026 on the council or government website
South Hams87%Action planJoint result for the Plymouth and South West Devon Joint Local Plan area (Plymouth, South Hams and West Devon)2.06 yearsShort of five yearsAt April 2026: Plymouth City Council: 5 Year Housing Land Supply Position Statement and Housing Delivery Test result, 2026 statement (November 2026)March 2019The Plymouth and South West Devon Joint Local Plan was adopted by South Hams on 21 March 2019. South Hams and West Devon gave notice of a new joint plan on 30 April 2026 and held a scoping consultation and call for sites from 20 July to 24 September 2026. Their published timetable puts consultation on content and evidence in February and March 2027, the proposed plan from October to December 2027, submission in July 2028 and adoption in February 2029Checked November 2026 on the council or government website
West Devon87%Action planJoint result for the Plymouth and South West Devon Joint Local Plan area (Plymouth, South Hams and West Devon)2.06 yearsShort of five yearsAt April 2026: Plymouth City Council: 5 Year Housing Land Supply Position Statement and Housing Delivery Test result, 2026 statement (November 2026)March 2019The Plymouth and South West Devon Joint Local Plan was adopted by West Devon on 26 March 2019. South Hams and West Devon gave notice of a new joint plan on 30 April 2026 and held a scoping consultation and call for sites from 20 July to 24 September 2026. Their published timetable puts consultation on content and evidence in February and March 2027, the proposed plan from October to December 2027, submission in July 2028 and adoption in February 2029Checked November 2026 on the council or government website
Teignbridge78%Buffer5.73 yearsAt April 2026: Planning Inspectorate: Report on the examination of the Teignbridge Local Plan 2020 to 2040 (March 2026)May 2026The Local Plan 2020 to 2040 was adopted by Full Council on 19 May 2026. Preparation of a new Local Plan 2029 to 2044 began under a Local Development Scheme in effect from 20 March 2026Checked November 2026 on the council or government website
Torbay40%Below 75%: unmet need1.65 yearsShort of five yearsAt April 2025: Torbay Council: Torbay Five Year Supply 2025, with the Five Year Requirement 2025 (standard method as at December 2025)December 2015The Torbay Local Plan 2025 to 2045 was published for Regulation 19 consultation from 13 August to 24 September 2026; the council's plan page says Full Council will consider the final draft in December 2026 before submission, with adoption expected in 2027/28Checked November 2026 on the council or government website

Just over the county line: Cornwall (Cornwall), Dorset (Dorset) and Somerset (Somerset).

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026, with later milestones we have checked on council and government websites marked "Checked". Five-year land supply figures come from each council's own latest statement, or the latest figure tested at appeal, linked in each row. A Housing Delivery Test result below 75%, or a supply short of five years, counts as evidence of unmet housing need under policy S5 of the NPPF. Local plans move quickly, so always check the council's own website for the latest position.

East Devon

East Devon runs from Exmouth to Axminster and the new town of Cranbrook. Its plan dates from January 2016, and the council's monitoring report to 31 March 2025 finds 3.5 years of land. A new plan to 2042 had a second Regulation 19 consultation from November 2025 to January 2026, and the council's June 2026 timetable aimed to submit it in October 2026, with adoption expected in 2028. Its centrepiece is Marlcombe, a new town proposed between the A30 and the A3052 south of Exeter Airport, starting at 8,000 homes and growing to 10,000 or more, its first phase expected early in the 2030s. Appeals at Feniton and Dunkeswell failed in 2026 despite the shortfall, so how a scheme fits its place still decides.

Exeter

Exeter's boundary is drawn tight around the city and Topsham, so most fields at its edge are planned by East Devon, Mid Devon or Teignbridge. Its Core Strategy dates from February 2012, and the council's June 2026 statement shows 5.29 years, counting purpose-built student rooms. The brownfield-led Exeter Plan was examined in spring 2026, and the inspectors' letter of 15 September 2026 asked for one small allocation to go before main modifications are consulted on.

Mid Devon

Mid Devon covers Tiverton, Cullompton and Crediton on the M5 and a wide farming district beyond. Its plan, adopted in July 2020, turned five in July 2025, and against the government's standard method the council now finds only 2.4 years, despite building above target. Half of the planned homes go to Cullompton, which waits on a relief road and on new slip roads at junction 28, a scheme the county council is bidding for and the district links to up to 5,000 homes at Culm Garden Village. A site of a few dozen homes beside Tiverton, Crediton or a larger village, needing neither road, is where the shortfall counts most.

North Devon and Torridge

Barnstaple, Ilfracombe and South Molton in North Devon, and Bideford, Northam, Great Torrington and Holsworthy in Torridge, share one plan, adopted in October 2018, and one land supply. Their joint statement of October 2025, recorded in a Torridge Plans Committee report, finds 4.61 years across both districts, 92% of the requirement, while noting that the plan's policies are not automatically out of date. The gap adds weight to a field that sits naturally against a town rather than rescuing a weak one. A Plan for Northern Devon, the replacement, began in June 2026.

Plymouth, South Hams and West Devon

These three share the Plymouth and South West Devon Joint Local Plan, adopted in March 2019. Their joint statement of November 2026 finds 2.06 years from 1 April 2026 against the standard method for all three, less 30 homes a year that the Dartmoor authority plans itself. Of 5,632 deliverable homes, 3,070 are in South Hams, 1,681 in Plymouth and 881 in West Devon. The partnership is dividing: Plymouth is preparing a city plan timetabled for adoption in April 2029, and South Hams and West Devon began a new joint plan with a call for sites from 20 July to 24 September 2026.

Teignbridge

Teignbridge adopted its Local Plan 2020 to 2040 in May 2026, and on the inspectors' count it has 5.73 years of land from 1 April 2026, a 20% buffer included. Of the homes still to come from its allocations, the plan puts about 42% in the Garden Community at Newton Abbot and Kingsteignton and 35% on the Exeter fringe. Its requirement of 720 homes a year is well under the government's current figure, so work on a 2029 to 2044 replacement began in March 2026. Until then, open land mostly waits for the plan, while plots inside settlement limits can come forward at any time.

Torbay

Torbay covers Torquay, Paignton and Brixham. Its 2015 plan has passed five years, and its own figures show 1.65 years from 1 April 2025. Its replacement, published for Regulation 19 consultation from 13 August to 24 September 2026, proposes at least 8,000 homes to 2045; in June 2026 the housing minister wrote that this met just 42% of local housing need, a shortfall of 10,980 homes, and used his section 27 powers to direct the council to send its evidence. For a field against Torquay or Paignton, that challenge and the delivery result point the same way.

The Land We Buy in Devon

  • Fields of 2 acres or more on the edge of market towns, from Tiverton and Crediton to Barnstaple, Holsworthy, Tavistock and Totnes.
  • Land against Paignton, Torquay and Brixham.
  • Larger holdings east and south west of Exeter and around Newton Abbot.
  • Yards, garage courts and former hotels in Exeter, Plymouth and the Torbay towns.
  • Paddocks beside villages that need affordable homes.

Land inside Dartmoor or Exmoor, on the open coast or by a bat roost faces a much higher bar, and we say so plainly. Where a site has a case, the price is fixed in an option agreement before work starts and every cost is ours; our farmland page shows how larger holdings are assessed.

Is Your Land in Devon a Good Fit?

You do not need to know the planning rules to sell land for development in Devon. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Devon

There are three common ways to sell land with development potential in Devon. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Devon: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Devon and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

The planning detail in full

Ten Councils, Two National Parks and a County Council: Who Decides on Land in Devon

Eight district, borough and city councils (East Devon, Exeter, Mid Devon, North Devon, Torridge, South Hams, West Devon and Teignbridge) decide applications and write local plans, with Devon County Council above them running roads and schools. Plymouth and Torbay are unitary councils that do both jobs themselves. The county council is also the minerals and waste planning authority for Devon outside Plymouth, Torbay and the two National Parks, with a Minerals Plan adopted in February 2017 and a Waste Plan from December 2014.

  • Two National Parks. All of Dartmoor and about a third of Exmoor lie in the county, as the county council records, and inside them the Park Authority plans for land and decides applications.
  • One council below 75%. Torbay delivered 40% of the homes it needed in the Housing Delivery Test 2025, the lowest in Devon, so its unmet need is treated as evidenced.
  • Five in the middle bands. East Devon (84%) and Teignbridge (78%) sit below 85%, where national policy calls for a 20% buffer, and Plymouth, South Hams and West Devon share one Joint Local Plan result of 87%, which requires an action plan.
  • Four at or above target. Exeter scored 102%, Mid Devon 103%, and North Devon and Torridge share 122% for their joint plan area.
  • Five years of land in only two. Exeter shows 5.29 years and Teignbridge 5.73 years; the other eight are short.
  • No Green Belt. The government's Green Belt statistics of October 2026 place England's Green Belt around sixteen urban cores, none of them in Devon, so the grey belt test never arises here.

The Devon and Torbay Combined County Authority, set up in 2025, reported on 28 October 2026 that the government was minded to create a Mayoral Strategic Authority for the whole area, with Plymouth as a full partner and a first mayoral election expected in May 2028; the announcement says local planning decisions would stay with each council. Reorganisation is a separate matter: in a letter dated 29 October 2026 ministers took back their July 2026 choice of new councils for Devon, Plymouth and Torbay, kept every proposal in the review and promised an outcome early in 2027; elections in May 2027 go ahead to the existing councils.

For anyone selling land in Devon, two questions come first: which authority decides on the field, and whether the supply figure that applies belongs to that council alone or to a group of councils.

Moors, Estuaries and Bats: What Shapes a Sale of Land Across Devon

Two National Parks and Five National Landscapes

A field just outside a Park boundary is decided by the district, which also weighs the effect on the Park. The county council counts five National Landscapes: North Devon Coast, East Devon and South Devon wholly inside Devon, with the Tamar Valley and the Blackdown Hills crossing its border. With the two Parks, it says, these protected landscapes cover 35% of the county. Major development in a National Landscape needs exceptional circumstances, so small schemes set against a village are the ones with a real chance.

The Exe Estuary, the Pebblebed Heaths and Dawlish Warren

East Devon, Exeter and Teignbridge share a mitigation strategy for 2025 to 2030 covering these three protected sites. Homes within 10 kilometres of any of them pay a per-home contribution towards managing visitors, indexed by each council, and the strategy expects a development in the region of 300 homes or more to lay out its own Suitable Alternative Natural Greenspace, a job that part of a large holding near Exmouth or Dawlish can do.

Greater Horseshoe Bats in the South

The South Hams Special Area of Conservation protects greater horseshoe bats, more than 2,500 of them in South Devon, with six designated roosts from Berry Head near Brixham to Buckfastleigh, Chudleigh and the Haytor iron mines. Guidance agreed in October 2019 by Natural England, the Dartmoor authority and the councils concerned draws a sustenance zone 4 kilometres around each roost, where a scheme that could affect the bats' feeding ground or flight routes needs detailed assessment, with surveys matched to the site and lighting kept off their habitat.

Phosphates in the River Axe

Since Natural England's advice of March 2022, East Devon requires an appropriate assessment for new homes in the River Axe catchment, which must show nutrient neutrality. The council has not yet formally adopted its solutions report or its nutrient budget calculator, so each scheme in the Axe valley around Axminster makes its own case, using Natural England's latest calculator.

Second Homes on the South Coast

Teignbridge's plan records more than 1,600 second homes and self-catering units, and policy H1 now makes every new-build home in five parishes on the coast and the Teign estuary, which the supporting text lists as Bishopsteignton, Dawlish, Shaldon, Stokeinteignhead and Teignmouth, a primary residence only. That narrows who can buy the finished homes, and a coastal scheme is priced around it.

Minerals Under the Land

Policy M2 of the county's Minerals Plan safeguards known mineral deposits, so land over one can need the county's view first.

A field in south Devon can sit in a bat sustenance zone, within reach of the heaths and in a National Landscape's setting at once, so our review maps these layers first, and every survey after that is ours to pay for.

Where Growth Is Focused, and Where We Look for Land in Devon

Growth follows the M5, the A30 past the airport, the A380 to Newton Abbot, the A38 to Plymouth and the A361 to Barnstaple. The areas we watch most closely are:

AreaWhy it matters
East of ExeterCranbrook and the proposed Marlcombe, in a district short of five years of land.
Newton Abbot and the edge of ExeterTogether about three quarters of Teignbridge's remaining allocated homes, mostly a plan route.
Cullompton and TivertonLarge sites waiting on new roads, and a supply of 2.4 years that gives smaller sites weight.
Torquay, Paignton and BrixhamThe lowest delivery in Devon and a plan figure the minister has challenged.
Plymouth and its rural neighboursA joint shortfall, with more than half the deliverable homes in South Hams.
Barnstaple, Bideford, Tavistock and OkehamptonMain towns in the two joint plan areas, each under a shared shortfall.

What This Means If You Are Selling Land in Devon

Torbay apart, where delivery alone settles the need question, the shortfall in East Devon, Mid Devon, northern Devon and the three Joint Local Plan councils is evidence weighed under policy S5, never an automatic finding. The routes we look at are:

  1. Inside towns and villages, policy S4. For a plot, yard or backland within a settlement boundary, the August 2026 framework starts from approval, and refusal needs harm that would substantially outweigh what the homes bring.
  2. Beside a town or larger village, policy S5. Land well related to the place and served by its roads, schools and drainage, where need is evidenced. With no Green Belt, that route reaches the edge of every Devon town outside the Parks.
  3. Through the new plans. Five councils or partnerships in Devon have begun new plans since March 2026, and our guide to calls for sites and local plans explains when land is best put forward.
  4. Rural exception sites and previously developed land. Affordable homes for local people beside smaller villages, and old yards, works and hotels, which national policy supports reusing.
Illustrative example: a 5-acre field beside a Mid Devon village
Council position
Delivery at 103%, but housing land of only 2.4 years
Constraints
Outside the settlement limit and the Blackdown Hills, beside a village named for limited growth, mostly Flood Zone 1
Likely route
An application under policy S5 for a scheme in proportion to the village
Your costs
None. Every planning cost, including any appeal, is paid by us
What we would offer
An option agreement at a price agreed at the start, paid on completion once permission is secured

An illustration of how we think about a site, not a real offer. Every site is different, and our free desktop review looks at the specific field.

Over the boundary in Teignbridge, which shows five years, the same field would more often wait for the next plan. Both tests are explained in our 2026 framework guide.

Timing a Sale While Devon's Plans Are Rewritten

Each council's published timetable gives its next stage:

Each council's timetable as checked in November 2026. Future dates are the councils' and may move.
CouncilNext stage in its timetable
East DevonIts June 2026 timetable set October 2026 for submission and 2028 for adoption
ExeterMain modifications consultation, with adoption targeted for March 2027
Mid DevonContent and evidence consultation, 22 January to 8 March 2027
North Devon and TorridgeContent and evidence consultation, 10 February to 24 March 2027
PlymouthContent and evidence consultation, 22 June to 10 August 2027
South Hams and West DevonContent and evidence consultation in February and March 2027
TorbayFull Council to consider the final draft in December 2026, before submission

Supply figures change only with a new statement, and the delivery test is refreshed yearly; the Housing Delivery Test 2025 came out on 17 August 2026. Land already well placed against a town can be put forward now; land that needs an allocation should have its evidence ready for the 2027 consultations.

Questions About Selling Land in Devon

Torbay is below 75%. Does that help my land just over the boundary in South Hams or Teignbridge?

No. The delivery test works council by council, so Torbay's result applies only inside Torbay. South Hams relies on the shortfall it shares with Plymouth and West Devon, and Teignbridge shows five years of land.

My land is close to Exeter but outside the city. Which council decides?

The council it lies in, usually East Devon, Mid Devon or Teignbridge, each with its own plan and supply figure, because Exeter's boundary hugs the built-up city.

Will a mayor for Devon, Plymouth and Torbay take over planning decisions?

Not on what has been announced. The councils' October 2026 statement says local planning decisions would stay with each council, and the new authority depends on every council agreeing and on Parliament.

Is there any Green Belt in Devon that would rule out my field?

No. None of England's Green Belt lies in Devon. Fields here are judged against settlement boundaries, countryside and coast policies and the protected landscapes, so the question is how well the land relates to a town or village.

I own land near Exmouth. Do the estuary and heathland rules stop homes there?

No. They add a contribution per home and, on schemes of around 300 homes or more, new green space, both costs we allow for in our appraisal before a price is agreed.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

Selling Land in Devon? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council, or leave it blank if you are not sure which part of Devon the land is in. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.

Other Counties We Cover

Counties we have researched council by councilWe review land anywhere in England

Devon

10 councils, 1 of them built fewer than 75% of the homes needed in the government's latest count.

You are viewing this county