Devon council area
Selling Land in East Devon
Checked on
East Devon runs from Exmouth and the Exe Estuary to the Dorset border, and two National Landscapes cover about two thirds of it. Its local plan dates from January 2016, the council could show only 3.5 years of housing land at 31 March 2025, and a new plan built around a second new town, Marlcombe, went out for its final consultation in November 2025. For an owner thinking of selling land here, each of those facts shapes what a field is worth pursuing.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in East Devon and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
East Devon can show 3.5 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from January 2016, and a new one was published for consultation in November 2025.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in East Devon
- Fields next to the built-up area boundaries of Exmouth, Honiton, Ottery St Mary, Axminster, Seaton or Cranbrook that lie outside the two National Landscapes.
- Smaller, well contained sites on the edge of villages, sized to suit the village rather than to double it.
- Plots, yards and backland inside the towns and villages, where policy S4 applies.
- Larger holdings in the west of the district with room for greenspace beside the homes.
- Land in the Axe valley where the phosphate question can be designed for from the start.
- Inherited land and farmland that families are deciding what to do with, anywhere in the district (our inherited land page covers the practical side).
A field deep in the Blackdown Hills or on the open coast, well away from any town, faces the steepest climb in East Devon, and our review says so in writing. For land with a real case, the option fixes our price on the day it is signed, and every report the council will ask for, from landscape and ecology work to habitats assessments, phosphate budgets, drainage and highways, is commissioned and paid for by us. You keep farming or using the field until completion, and if permission is refused at every stage, the field stays with you and there is no bill from us. Our how it works page sets out each step, and our farmland page shows how larger holdings are assessed.
Is Your Land in East Devon a Good Fit?
You do not need to know the planning rules to sell land for development in East Devon. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in East Devon
There are three common ways to sell land with development potential in East Devon. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in East Devon: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in East Devon and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in East Devon
Three things shape the chances of selling land for development in East Devon: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
84%
Below 85%: a 20% buffer is added to its five-year housing land supply.
Five-year housing land supply
3.5 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2025, measured against the standard method, 1,156 homes a year (5,780 over five years), plus what the council labels a 5% buffer of 58 homes, 5,838 in all (1,168 a year). Stated by East Devon District Council.
Checked sourceHomes built against homes needed
2,316
of 2,749 needed, April 2022 to March 2025
Most recent strategic plan adopted
January 2016
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
A second Regulation 19 version of the East Devon Local Plan 2020 to 2042, including the proposed new town of Marlcombe, was published for consultation from 28 November 2025 to 26 January 2026. The council's Local Development Scheme of June 2026 moved submission for examination to October 2026, with adoption expected in 2028
Checked source
See how East Devon compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Two National Landscapes, a Protected Coast and a Growing West End
East Devon District Council covers the country between the edge of Exeter and the Dorset border. Its adopted local plan names seven main towns: Axminster, Budleigh Salterton, Exmouth, Honiton, Ottery St Mary, Seaton and Sidmouth. Cranbrook, the new town east of Exeter, sits with the airport, Skypark and the Science Park in what the plan calls the West End.
- Landscape over most of the district. The plan records that the Blackdown Hills and East Devon National Landscapes, still called Areas of Outstanding Natural Beauty when it was written, together cover two thirds of the district.
- A World Heritage coast. The plan describes Exmouth as the western end of the Dorset and East Devon Coast World Heritage Site, the Jurassic Coast, and it treats the coast at Budleigh Salterton and Seaton as part of the same site.
- Growth pointed west. The 2016 plan put 7,769 of its homes at Cranbrook and 10,563 in the West End as a whole, close to Exeter rather than in the coastal and hill towns.
Land outside a built-up area boundary is countryside under the 2016 plan, where Strategy 7 permits development only if another plan policy explicitly allows it. The main plan draws the boundaries around the towns, and the separate East Devon Villages Plan draws them around the villages.
If you are thinking of selling land in East Devon, two questions come first: whether a field sits inside one of the National Landscapes, and how close it lies to a built-up area boundary. Between them they decide most of the route that follows.
Selling Land in East Devon While Supply Falls Short
The council has measured its five-year housing land supply against the government's standard method since the December 2024 framework, and it has fallen short each time. Its revised calculation of December 2024 and its housing monitoring report to 31 March 2025 set the two years side by side:
| Step | Supply at 31 March 2024 | Supply at 31 March 2025 |
|---|---|---|
| Yearly need under the standard method | 1,188 homes | 1,156 homes |
| Five-year requirement, including the buffer | 6,237 homes | 5,838 homes |
| Sites with planning permission | 2,720 homes | 2,752 homes |
| Cranbrook expansion zones | 600 homes | 895 homes |
| Future windfall sites | 386 homes | 445 homes |
| Total deliverable supply | 3,706 homes | 4,092 homes |
| Shortfall | 2,531 homes | 1,746 homes |
| Result | 2.97 years | 3.5 years |
Two inspectors have since used the 2025 position. At the Feniton appeal decided on 30 April 2026 the council and the appellant agreed supply of around 3.5 years and a shortfall of around 1,746 homes, down from the range of 2,313 to 2,922 recorded at an earlier appeal at Colestocks Road. At Dunkeswell in June 2026 the inspector described an appreciable shortfall of some 1.5 years.
Delivery is measured separately. The Housing Delivery Test 2025 counted 2,316 homes built against 2,749 needed over three years, a result of 84%: low enough to require an action plan and a 20% buffer, but above the 75% line at which unmet need is treated as evidenced outright.
For an owner selling land for development in East Devon, the shortfall is what gives a well placed field outside the 2016 boundaries a hearing now. Policy S5 of the August 2026 framework lets decision makers count it as evidence that homes are needed, to be weighed in the balance rather than taken as settled, and the two appeals below show how that weighing has gone here.
What the Feniton and Dunkeswell Appeals Tell a Landowner
Both recent appeals were dismissed despite the shortfall.
| Land at Ottery Road, Feniton | Land at Abbey Road, Dunkeswell | |
|---|---|---|
| Scheme | Up to 85 homes, outline | Up to 65 homes, outline |
| Decision | Dismissed, 30 April 2026 | Dismissed, 17 June 2026 |
| Where it sat | Outside Feniton's built-up area boundary | Near the centre of the Blackdown Hills National Landscape, in a village with no built-up area boundary |
| What weighed against it | Reliance on the car, a disproportionate and accelerated expansion of the village, serious harm to the character of the area | Major development in a National Landscape that failed to conserve its scenic beauty, with no exceptional circumstances shown |
At Feniton the inspector gave reduced weight to the plan's boundary policies because of the shortfall, then still found that the harm would significantly and demonstrably outweigh the benefits. At Dunkeswell the National Landscape test decided the case, because national policy says the scale and extent of development within such an area should be limited. The site had already been rejected early as an allocation in the new plan.
Where a Field Stands in East Devon
- Inside a built-up area boundary. Policy S4 applies: homes are approved unless the harm would substantially outweigh the benefits.
- On the edge of a larger town, outside the National Landscapes. S5 and the shortfall do most here, for land well related to the town and served by roads and drainage that can cope.
- On the edge of a village. Feniton shows that a scheme out of proportion with a small settlement can fail even with the shortfall behind it.
- Inside a National Landscape. Smaller, well contained schemes have a route; a scheme counted as major development needs exceptional circumstances, whatever the supply position.
So for most owners selling land in East Devon the real question is whether a site is the right size for its place, and that is the first thing we test.
Estuary, Heaths and the River Axe: Costs a Sale Must Carry
The South East Devon mitigation strategy for 2025 to 2030, shared by East Devon, Exeter and Teignbridge, covers three protected wildlife sites, the Exe Estuary, the East Devon Pebblebed Heaths and Dawlish Warren, with zones drawn 10 kilometres around them to manage the recreational pressure that more residents bring. Within the zones, East Devon charges per new home, rising with the Retail Price Index each April:
| Within reach of | Charge per home from 1 April 2026 |
|---|---|
| The Exe Estuary only | £790.41 |
| The Pebblebed Heaths only | £804.64 |
| Both the estuary and the heaths | £825.41 |
Schemes of around 300 homes or more are expected to provide their own Suitable Alternative Natural Greenspace, open walking land that draws visitors away from the protected sites, so on a larger holding some of the land can do that job beside the homes.
Phosphates in the River Axe
In the east of the district a different rule applies. Since Natural England's advice of March 2022, the council says, any application within the River Axe catchment will have a likely effect on the protected river and will require an appropriate assessment, so new homes there must show nutrient neutrality: no net increase in phosphate reaching the river. The council's phosphates page adds that its solutions report and nutrient budget calculator are yet to be formally adopted, so each scheme in the catchment still makes its own case.
For an owner in the Axe valley this does not rule a field out, but it adds a cost and a design task to plan from the start, and that work is ours to pay for.
What the 2020 to 2042 Plan and Marlcombe Mean for Landowners
The new East Devon Local Plan was first published at Regulation 19 in February 2025 and again, revised, on 28 November 2025. Having reached that stage early in 2025, it is prepared under the December 2024 framework's transitional arrangements, which the council reads as requiring 80% of the new standard method figure. Its housing delivery paper of November 2025 sets out the arithmetic:
| Part of the plan | Council's figure |
|---|---|
| Housing requirement | 950.4 homes a year, 80% of the standard method, or 20,909 over the 22 years to 2042 |
| Homes completed 2020/21 to 2024/25 | 4,204 (872, 1,047, 961, 634 and 690) |
| Homes with permission at 1 April 2025 | 7,529 |
| Projected supply | 23,048 homes in all; after completions, 18,844 against the remaining 16,705, a margin of 2,139 |
| Stepped requirement | 850 a year at first, rising to 1,070 a year from 2031/32 |
The 950.4 is 80% of 1,188, the standard method figure in the council's December 2024 calculation. The method's figure for East Devon has since come out lower as its inputs were updated: 1,156 in the monitoring report to March 2025 and 1,146 in the November 2025 paper. The step exists because, the paper explains, just over 1,200 homes on complex sites, those over 300 homes, on difficult brownfield land or in the National Landscape, are moved beyond the first five years.
Marlcombe, the Second New Town
The plan's new town allocation is Marlcombe, on land between the A30 and the A3052, south of Exeter Airport and north of Westpoint. The council's Marlcombe questions and answers describe 8,000 homes at first, rising to at least 10,000 in the long term, with a first phase anticipated in the early 2030s and a development corporation proposed to deliver the infrastructure. The government's New Towns Taskforce has recommended it as one of 12 next-generation new towns, subject to further assessments.
For most owners selling farmland in East Devon, Marlcombe matters indirectly: the stepped requirement accepts that large sites deliver late, so land at the towns and villages carries much of the early delivery.
Before the Inspector: Timing a Sale of Land in East Devon
A Timetable That Now Looks to Adoption in 2028
The second Regulation 19 consultation ran until 26 January 2026. The council's timetable report of June 2026 said submission in late spring 2026 had not been possible, that the intent was now to submit in October 2026, and that it expected adoption in 2028, potentially by a successor authority.
Until then the 2016 plan, past its fifth anniversary, no longer sets the yardstick for land supply; the standard method does. The Feniton inspector expected the shortfall to persist at some level until at least adoption of the new plan, and the housing paper projects, rather than publishes, a supply of 6.64 years once the plan is in force, on a base date of 1 April 2027.
The Next Supply Figure and the Next Delivery Result
The supply figure on this page measures the council's position to 31 March 2025, and each annual monitoring report moves that date on a year. The Housing Delivery Test 2025 was published on 17 August 2026; the next edition will show whether East Devon stays in the 20% buffer band, rises above it or falls below 75%.
Reorganisation
The government's July 2026 decision on reorganising the councils of Devon was withdrawn by a ministerial letter of 29 October 2026, which names Devon, Plymouth and Torbay among nine areas, keeps all proposals under consideration with an outcome by early 2027, and lets the May 2027 elections go ahead to the existing councils. East Devon District Council remains the planning authority in the meantime.
For an owner weighing when to sell, land on the edge of the larger towns, outside the National Landscapes, can make its case by application while the shortfall stands; land that needs an allocation will be settled through the examination and later reviews, as our guide to how land gets into a local plan explains.
Questions About Selling Land in East Devon
My field is just outside Honiton's boundary and not in a National Landscape. Does the shortfall help?
It can. With supply at 3.5 years, a field well related to a town like Honiton can be put forward now under policy S5, with the shortfall weighed as evidence of need. Access, drainage and how the site sits against the town still decide the outcome.
My land is in the Blackdown Hills. Is selling it for housing realistic?
For a small, well contained site next to a village, sometimes. For a larger scheme the Dunkeswell decision shows how high the bar is, because major development in a National Landscape needs exceptional circumstances.
I own land near Exmouth. Who pays the heathland and estuary charge?
It is a charge on each new home, at the council's 2026 rates of roughly £790 to £825, secured with the permission. It is a development cost rather than a bill for you, and we allow for it when we first assess a site.
Will Marlcombe take away the chance for my land near Clyst St Mary or Whimple?
Not necessarily. The council expects the first phase in the early 2030s and still needs land elsewhere before then, though land close to Marlcombe needs care over how it relates to the new town's plans.
Does the delay to the new plan affect a field I want to sell now?
It lengthens the time in which the 2016 plan, now more than five years old, and the supply shortfall are what applications are judged against, so well placed land outside the boundaries has longer to make its case.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in East Devon Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where East Devon stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in East Devon? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Devon
County overview
Selling Land in Devon
Sell land for development in Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 102% of need
Selling Land in Exeter
Sell land in Exeter, near Topsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 103% of need
Selling Land in Mid Devon
Sell land for development in Mid Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 78% of need
Selling Land in Teignbridge
Sell land for development in Teignbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in North Devon
Sell land for development in North Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in Torridge
Sell land in Torridge, near Bideford. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in Plymouth
Sell land in Plymouth, near Plympton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in South Hams
Sell land for development in South Hams: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in West Devon
Sell land for development in West Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 40% of need
Selling Land in Torbay
Sell land in Torbay, near Torquay. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- East Devon District Council: East Devon Local Plan 2013 to 2031 (adopted January 2016)
- East Devon District Council: Five year housing land supply calculations, 2024 monitoring point (December 2024)
- East Devon District Council: Local Plan housing delivery paper HOU-001 (November 2025)
- East Devon District Council: Marlcombe frequently asked questions NWC-003 (2025)
- East Devon District Council: Habitat mitigation, how much does mitigation cost (2026)
- East Devon, Exeter and Teignbridge councils: South East Devon European Sites Mitigation Strategy 2025 to 2030 (2025)
- East Devon District Council: Phosphates on the River Axe (2026)
- Planning Inspectorate: Appeal decision 6002860, land at Ottery Road, Feniton (April 2026)
- Planning Inspectorate: Appeal decision APP/U1105/W/26/3377572, land at Abbey Road, Dunkeswell (June 2026)
- GOV.UK: Local government reorganisation, withdrawn letter to 9 areas (October 2026)
- East Devon District Council: Housing monitoring committee report 2024 to 2025 (2025)
- East Devon District Council: Local Development Scheme, Council report (June 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.