Torbay built 40% of the homes it needed in the government's latest count, and the council's own figures show 1.65 years of housing land against the government's yardstick. Its plan dates from December 2015, and the replacement it published in 2026 aims for less than half of the need the government measures, a gap the housing minister has already challenged in writing.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Torbay and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Torbay built only 40% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 1.65 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from December 2015, and a new one was published for consultation in August 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Torbay
- Fields on the western and southern edges of Paignton, including land around Collaton St Mary, Goodrington and Churston.
- Land at the edge of Torquay towards Edginswell and the Newton Road corridor.
- Former hotels, holiday parks, garages and yards inside the three towns, where the draft plan backs reuse of previously developed land.
- Paddocks, large gardens and backland in Preston, St Marychurch, Babbacombe and Brixham.
- Inherited land around Galmpton, Maidencombe or Brixham whose owners want to know whether it has a future beyond farming.
A field here usually needs evidence on access across sloping ground, drainage, bats and, near Brixham, the National Landscape, before the council will take it seriously. All of that, and any application that follows, is paid for by us, under an option whose price is fixed before any work starts, higher than the land's value in its present use. Until completion the land remains yours to farm or let; if permission is not granted, it stays yours and you owe nothing. Our page on selling farmland explains how we approach larger holdings.
Is Your Land in Torbay a Good Fit?
You do not need to know the planning rules to sell land for development in Torbay. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Torbay
There are three common ways to sell land with development potential in Torbay. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Torbay: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Torbay and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Torbay
Three things shape the chances of selling land for development in Torbay: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
40%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
1.65 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 950 homes a year, plus a 20% buffer. Stated by Torbay Council.
Checked sourceHomes built against homes needed
729
of 1,812 needed, April 2022 to March 2025
Most recent strategic plan adopted
December 2015
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The Torbay Local Plan 2025 to 2045 was published for Regulation 19 consultation from 13 August to 24 September 2026; the council's plan page says Full Council will consider the final draft in December 2026 before submission, with adoption expected in 2027/28
Checked source
See how Torbay compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Three Towns Around One Bay, With Farmland and Coast at Their Backs
Torquay, Paignton and Brixham have had a single council since 1998, when Torbay became a unitary authority and left Devon County Council's control. It is small, at about 63 square kilometres, and had 139,324 residents at the 2021 census. Around the three towns sit districts and villages such as Babbacombe, St Marychurch, Preston, Goodrington and Cockington, with Maidencombe on the coast to the north and Collaton St Mary, Churston Ferrers and Galmpton on the rural side. Teignbridge adjoins Torbay to the north and South Hams to the south and west.
- Three stations. Torre, Torquay and Paignton are served by trains along the bay.
- A plan past its fifth birthday. The Torbay Local Plan 2012 to 2030 was adopted at a council meeting on 10 December 2015. The plan describes a long-term rate of 400 to 500 new homes a year as sustainable.
- National Landscape on the rural fringe. The council's new plan says about a quarter of its Countryside Area is also covered by the South Devon National Landscape, the designation formerly known as an Area of Outstanding Natural Beauty.
Ground levels matter here more than in most places. In his July 2026 letter to the housing minister, the council's Leader wrote that most undeveloped land in Torbay is not flat, that slopes steeper than about 1 in 8 to 1 in 6 are not viable for housing, and that the flat farmland lies on the Brixham Peninsula under several environmental designations. A field's gradient is therefore one of the first things a review looks at.
Why the Council Can Count So Few Years of Housing Land
Torbay's current five-year supply calculation runs from a base date of 1 April 2025. Because the 2015 plan is more than five years old, its housing figure no longer applies, and the council measures supply against the government's standard method. Its five-year requirement uses a standard method result of 950 homes a year, which the council describes as accurate as of December 2025, and adds a 20% buffer because delivery has fallen short. The supply schedule then counts what it can deliver:
| Part of the calculation | Council's figure |
|---|---|
| Yearly need used | 950 homes, the standard method |
| Buffer | 20%, taking the yearly figure to 1,140 |
| Five-year requirement | 5,700 homes |
| Major sites with detailed permission | 1,062 homes |
| Other major sites, allocated or with outline permission | 231 homes |
| Small sites with permission | 342 homes |
| Small sites without permission | 243 homes |
| Deliverable supply | 1,878 homes |
| Result | 1.65 years |
The same requirement schedule tracks building since the plan period began in 2012/13. By 2024/25, 4,208 homes had been completed against a cumulative target of 6,140, leaving 1,932 homes undelivered. Completions were 211 in 2023/24 and 267 in 2024/25, under the plan's own yearly step for those years and far below the government figure the council now measures against.
A Second Figure, From a Brixham Appeal
In June 2025 an inspector allowed up to 77 homes at Copythorne Road, Brixham, and the decision records an agreed base date of 1 April 2025 and requirement of 1,128 homes a year, against which the council could demonstrate only a 1.72 year supply. On our arithmetic, 1,128 is a standard method result of 940 plus the 20% buffer; the council later reran the sum with the December 2025 figure of 950.
For anyone hoping to sell land for development in Torbay, that is the plainest fact on this page: on the council's own figures it cannot show five years of housing land, and an inspector has already given that shortfall real weight on a greenfield site at Brixham.
Selling Land at the Edge of Torquay, Paignton or Brixham
With a delivery result of 40%, below 75%, policy S5 of the August 2026 framework treats unmet housing need in Torbay as evidenced. Land beyond a settlement's limits can then be supported if it sits well against that settlement and its infrastructure can serve the new homes, and the supply shortfall adds weight. The Copythorne Road site lay outside the Brixham boundary in both the local plan and the Brixham Peninsula Neighbourhood Plan, and inside the South Devon National Landscape. Applying the framework then in force, the inspector found moderately adverse effects on the designation and a conflict with the development plan's spatial strategy, yet concluded that the adverse effects would not significantly and demonstrably outweigh the benefits of 77 homes, 35% of them affordable.
Each field still sits in one of a few positions, and they lead to different routes:
- Inside a settlement boundary. Policy S4 applies, and permission is expected unless the harm would substantially outweigh the benefits. Yards, older hotels, garages and backland in the three towns usually start here.
- On the edge of a town, outside the National Landscape. This is where S5 does most. Land at the edge of Paignton or Torquay that reads as part of the town and has safe access starts from a strong position.
- Inside the South Devon National Landscape. National policy gives the designation great weight, so a case needs a careful design and a strong housing argument. The Brixham appeal shows such a case can succeed.
- On the undeveloped coast. Draft policy L3 supports building there only where strict conditions are met, so these are the hardest fields to put forward.
How the two policies are worded and tested is covered in our 2026 framework guide for landowners.
In practice, the owners best placed to sell land in Torbay now hold fields that sit against Paignton or Torquay, outside the National Landscape and clear of the bats' flight paths, because every argument on this page points their way at once.
A New Plan for 8,000 Homes, and the Minister Who Asked Why
The council reviewed its plan in 2020 and has since prepared a replacement, the Torbay Local Plan 2025 to 2045. The publication version proposes at least 8,000 homes over the twenty years, an average of 400 a year. The plan itself puts Torbay's local housing need, as at July 2026, at 972 homes a year and says it cannot be met in full. Its own table shows where the 8,000 are expected:
| Source of homes in the new plan | Homes to 2045 |
|---|---|
| Town centre regeneration in Torquay, Paignton and Brixham | 1,350 |
| The Newton Road to Torre corridor and the Preston brownfield cluster | 650 |
| Other sites within settlement boundaries | 1,520 |
| Windfall sites, about 120 a year | 2,400 |
| Future Growth Areas | 1,850 |
| Further sites outside the settlement boundary | 675 |
| Total identified | 8,445 |
The Future Growth Areas are about 700 homes at Long Road, White Rock and Inglewood and nearby villages, about 600 at Collaton St Mary along Totnes Road, Paignton, and about 550 at the Torquay Gateway around Edginswell. Further sites outside the current settlement boundary include Sladnor Park at Maidencombe (120 homes, where the plan notes that a High Court decision established the principle of development), the former Hollicombe gas works (185), Preston Down Road north and south (50 each, both allocated before), Barton Pines (50) and the Archery Field at Churston (50). Beyond these, the draft policy says major greenfield schemes on unallocated land outside the settlement boundary or the Future Growth Areas will be resisted, while homes on previously developed land inside the boundary will be approved unless a protected interest gives a strong reason for refusal or the harm would significantly and demonstrably outweigh the benefits.
The Government's Challenge
In June 2026 the Minister of State for Housing and Planning wrote that the draft plan's requirement met just 42% of local housing need, leaving a shortfall of 10,980 homes over the plan period, and, using his section 27 intervention powers, directed the council to send him its evidence, including an updated land availability assessment that considered the sites put forward in the council's 2025 call for sites. On our arithmetic, 8,000 and 10,980 together come to about 949 homes a year, against 950 in the supply calculation and 972 in the plan; the formula is rerun as its inputs change.
The council's Leader replied on 2 July 2026 that 8,000 homes is the maximum Torbay can accommodate, pointing to limited flat land, protected habitats and species, drainage and wastewater capacity and slow progress on sites already allocated or with permission. The ministry's Deputy Director for Development Plans then confirmed that the council had met the direction and that no further intervention was proposed at that time, adding that this did not rule out intervention later if the plan did not make suitable progress, and that a plan can only be adopted if it is sound.
For owners whose land was not chosen, the open question of whether 8,000 homes is enough is the reason to keep a site in view: an inspector who finds the figure too low could look for more land, and sites put forward in 2025 are already part of the evidence the minister asked to see.
Bats, Coast and a National Landscape: The Limits on a Field
Torbay's countryside is small, and several protections overlap within it. The draft plan's chapter on natural places sets out the ones that most often decide a site:
- The Countryside Area. Draft policy L1 resists development that would lose open countryside, spread the towns or merge settlements, and points major development towards the Future Growth Areas.
- The undeveloped coast. Draft policy L3 does not support development on the undeveloped coast unless it keeps the coastline unspoilt, keeps or improves public access, and brings clear benefits that could not be achieved elsewhere.
- Greater horseshoe bats. Proposals must not harm the integrity of the South Hams Special Area of Conservation, alone or with other schemes, and draft policy NCS1 asks for particular attention to the bats' flight paths and to cirl buntings.
- The English Riviera UNESCO Global Geopark. A strategic policy covers the geology of the bay and the sites identified within the geopark.
In the Copythorne Road case the inspector concluded that there would be no adverse effect on the integrity of the South Hams Special Area of Conservation once mitigation was secured. That is the pattern to expect: survey work on how the bats use the land, and mitigation secured as part of the permission. The draft plan also treats every site in the National Landscape under its exception site policy, while elsewhere its affordable housing share starts at 3% on a scheme of ten homes and rises three points for each extra home to 30% at 19 homes or more.
For a farmer or family selling farm land to developers around Brixham or Galmpton, these layers explain why a site needs its ecology and lighting worked out early; we commission that survey work at our own cost and risk before any application goes in.
Timing a Sale While the New Plan Heads to Examination
The council's plan page sets out the stages below, and says that after submission the plan will be independently examined. The ministry's July 2026 letter also advised the council to arrange a further Planning Inspectorate advisory visit, so that it goes into the examination in a strong position.
| Stage | Date |
|---|---|
| Review of the 2015 plan | 2020 |
| Draft plan consultation (Regulation 18) | 28 November 2025 to 2 February 2026 |
| Minister's direction to send the evidence | 11 June 2026 |
| Publication plan consultation (Regulation 19) | 13 August to 24 September 2026 |
| Full Council to consider the final draft | December 2026, in the council's timetable |
| Adoption | 2027/28, as the council expects |
Below Every Delivery Threshold Until a New Plan Is Adopted
Until the new plan is adopted, decisions rest on the 2015 plan read with national policy, with the draft gaining weight as it advances. The delivery result is refreshed once a year; the latest, the Housing Delivery Test 2025, was issued on 17 August 2026 and recorded 729 homes built against 1,812 needed. A result below 95% calls for an action plan, below 85% brings the 20% buffer, and below 75% treats unmet need as evidenced under S5. At 40%, Torbay is below all three lines. We would not predict the next result.
Reorganisation in Devon remains unsettled. The council's reorganisation page reported on 29 October 2026 that, after a pause in September, the government was formally withdrawing its decision for Devon and would confirm a new one over the coming months.
Edge of Town Fields Now, Larger Holdings in Step With the Plan
- Land against Paignton, Torquay or Brixham can be reviewed now, while the supply and delivery position gives such sites their strongest footing.
- Larger holdings are best prepared with the examination in mind, since an inspector testing the 8,000 figure may look for more land. What happens to a site at the examination stage is covered in our call for sites and local plans guide.
Questions About Selling Land in Torbay
My field near Brixham is in the National Landscape. Is it worth putting forward?
Sometimes, as the Copythorne Road appeal showed, but such a site needs careful design and strong evidence, and we tell you plainly if yours is not strong enough.
The council says 8,000 homes is all Torbay can take. Does that rule out my land?
No. That is the council's position in a plan not yet examined, and the housing minister has challenged it. Meanwhile, with delivery and supply this low, national policy favours well placed land.
I put my land forward in the 2025 call for sites. What happens to it now?
The minister asked the council to consider those sites in an updated land availability assessment, so they form part of the evidence for the examination. Whether to wait for the plan or apply sooner depends on where the land sits, which our review looks at.
Will the greater horseshoe bats stop a scheme on my farmland near Galmpton?
Not by themselves, but they shape it. A scheme must show no adverse effect on the integrity of the South Hams Special Area of Conservation, so the layout and lighting are designed around what the surveys find.
I have inherited an old hotel in Torquay. Is that the kind of site you take on?
Often, yes. Former hotels and other previously developed land inside the towns fall under policy S4, and the new plan supports their reuse for homes. Our how it works page shows what happens after our first look.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Torbay Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Torbay stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Torbay? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Devon
County overview
Selling Land in Devon
Sell land for development in Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 87% of need (joint area)
Selling Land in South Hams
Sell land for development in South Hams: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 78% of need
Selling Land in Teignbridge
Sell land for development in Teignbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 84% of need
Selling Land in East Devon
Sell land for development in East Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 102% of need
Selling Land in Exeter
Sell land in Exeter, near Topsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 103% of need
Selling Land in Mid Devon
Sell land for development in Mid Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in North Devon
Sell land for development in North Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in Torridge
Sell land in Torridge, near Bideford. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in Plymouth
Sell land in Plymouth, near Plympton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in West Devon
Sell land for development in West Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Sources
- Torbay Council: Torbay Local Plan 2012 to 2030 (adopted December 2015)
- Torbay Council: Torbay Five Year Supply 2025 (base date April 2025)
- Torbay Council: Torbay Five Year Requirement 2025 (standard method as at December 2025)
- Torbay Council: Torbay Local Plan 2025 to 2045, Regulation 19 publication version, chapter 3, housing (August 2026)
- Torbay Council: Torbay Local Plan 2025 to 2045, Regulation 19 publication version, chapter 9, natural places (August 2026)
- Torbay Council: Local Plan Update, consultation stages and next steps (November 2026)
- Ministry of Housing, Communities and Local Government: Torbay Council local plan intervention letter (June 2026)
- Torbay Council: Letter from the Leader of the Council to the Minister of State for Housing and Planning (July 2026)
- Torbay Council: Letter from the Ministry of Housing, Communities and Local Government, Development Plans (July 2026)
- Planning Inspectorate: Appeal decision APP/X1165/W/24/3354507, Copythorne Road, Brixham (June 2025)
- Torbay Council: Local Government Reorganisation (October 2026)
- Wikipedia: Torbay
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.