Devon council area
Selling Land in Plymouth
Checked on
Plymouth sits between the Tamar and the Plym, and since 2019 it has been planned together with South Hams and West Devon. Their joint statement of November 2026 finds only 2.06 years of housing land across the three councils, and the city council has now started a plan of its own, timetabled for adoption in April 2029. Most land for homes here lies inside the city, in yards, garage courts and older buildings, with a narrower route for fields at the urban edge.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Plymouth and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Plymouth can show 2.06 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from March 2019, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Plymouth
- Yards, depots, workshops and older commercial buildings in Devonport, Stonehouse, Plympton, Plymstock and the northern suburbs.
- Garage courts, backland and larger gardens with room for a small group of homes.
- Vacant or underused buildings and land that the council would recognise as previously developed.
- Paddocks and fields that touch the built-up edge of the city, where policy S5 can be argued.
- Larger holdings suited to employment, renewable energy or data centres.
Plymouth sites tend to be small and close to neighbours, so the early work covers title, access, flood maps near the water, heritage in the older districts and the urban fringe boundary at the edge, all at our cost. The small sites and paddocks page shows the scale of land we are glad to look at here.
Is Your Land in Plymouth a Good Fit?
You do not need to know the planning rules to sell land for development in Plymouth. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Plymouth
There are three common ways to sell land with development potential in Plymouth. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Plymouth: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Plymouth and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Plymouth
Three things shape the chances of selling land for development in Plymouth: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
87%
Measured jointly for the Plymouth and South West Devon Joint Local Plan area (Plymouth, South Hams and West Devon), so this is the whole area's result. Below 95%: the council must publish an action plan to improve delivery.
Five-year housing land supply
2.06 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2026, measured against the standard method for Plymouth, South Hams and West Devon combined, 2,638 homes a year less a 30-home Dartmoor National Park allowance, plus a 5% buffer, measured across the whole Joint Local Plan area. Stated by Plymouth City Council, South Hams District Council and West Devon Borough Council, in their joint statement.
Checked sourceHomes built against homes needed
3,638
of 4,191 needed, April 2022 to March 2025, across the Plymouth and South West Devon Joint Local Plan area (Plymouth, South Hams and West Devon)
Most recent strategic plan adopted
March 2019
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The Plymouth and South West Devon Joint Local Plan (adopted March 2019) remains the plan for the city. Plymouth is preparing its own Plymouth Local Plan: it gave notice on 25 June 2026, held a scoping consultation from 2 to 31 July 2026 and published its Gateway 1 summary on 26 October 2026. Its timetable puts submission on 27 October 2028 and adoption on 24 April 2029
Checked source
See how Plymouth compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A City Held Between Two Rivers and Dartmoor
Plymouth City Council has been a unitary authority since 1 April 1998. The city lies between the River Plym to the east and the River Tamar to the west, and the Tamar is also the county boundary with Cornwall. Dartmoor rises to the north and north east. Plympton and Plymstock joined the city in 1967, and the council area runs from Devonport and Stonehouse by the water to Southway, Estover and Derriford, home to the main hospital about four miles north of the centre.
- A naval and maritime city. The council's Gateway 1 self-assessment for its new plan names "the significant defence related investment associated with Devonport Dockyard", the South Devon Freeport, and the designation of Plymouth Sound as the country's first National Marine Park among the changes since the current plan was adopted.
- No Green Belt. The government's Green Belt statistics for 2025 to 2026, published on 22 October 2026, say that England's Green Belt "is distributed around sixteen urban cores" and list them. Plymouth is not one of them, and the nearest in the South West surround Bath and Bristol.
With water on two sides and no Green Belt, the first question for an owner is whether a site sits inside the built-up city or against its edge.
Three Councils, One Supply Figure: What Plymouth's Share Means for a Seller
There is no separate five-year supply figure for Plymouth. The three councils measure it together, and their statement of November 2026 covers the five years from 1 April 2026 to 31 March 2031. It explains that they "should now be measured" against the government's new standard method, "given it is significantly above the Joint Local Plan Housing Requirement and the Joint Local Plan is more than five years old." The sum runs in six steps:
| Step | What it measures | Councils' figure |
|---|---|---|
| A | Standard method for Plymouth, South Hams and West Devon combined | 2,638 homes a year |
| B | Less an allowance of 30 homes a year for Dartmoor National Park | 2,608 homes a year |
| C | Five-year requirement | 13,040 homes |
| D | With a 5% buffer | 13,692 homes |
| E | Deliverable supply across the three councils | 5,632 homes |
| F | Supply position for the whole Joint Local Plan area | 2.06 years |
Step E is split by council: 1,681 deliverable homes in Plymouth, 3,070 in South Hams and 881 in West Devon, so on our arithmetic the city supplies about 30% of the pipeline. Delivery is scored jointly too. The Housing Delivery Test 2025 records 3,638 homes built against 4,191 needed across the whole Joint Local Plan area, a result of 87% for the three councils together rather than for Plymouth alone. At that level an action plan is required, but the 20% buffer, which starts below 85%, does not apply, so the statement adds only 5%, and the result is above the 75% line below which unmet need counts as shown.
Under the August 2026 framework, policy S4 leans towards approval inside the city, allowing refusal only where a scheme's harm would substantially outweigh its benefits. Beyond the built-up edge, policy S5 supports homes on land that relates well to the city and can be served by its roads, schools and drainage, where unmet need is evidenced. The joint shortfall is evidence for a decision maker to weigh in that balance, not an automatic finding. With no Green Belt here, S5 can reach the city edge and grey belt rules do not arise. Our guide to the 2026 framework explains both policies.
If you are thinking of selling land in Plymouth, the shortfall is a shared one, but the city's modest share of the pipeline means a sound site inside its boundary meets a need the councils can see in their own figures.
A Joint Plan That Sent the Largest Growth Past the City Boundary
Policy SPT3 of the Joint Local Plan provides for "at least 26,700 dwellings (net) in the Plan Area" between 2014 and 2034, divided between two policy areas:
| Policy area | Homes to 2034 | Of which affordable |
|---|---|---|
| Plymouth Policy Area | At least 19,000 | 4,550 |
| Thriving Towns and Villages Policy Area | At least 7,700 | 2,050 |
| Whole plan area | At least 26,700 | 6,600 |
The policy keeps the two apart: "The Policy Area housing requirements are separate and non-transferable", and any shortfall in one "must be made up within that Policy Area, and cannot be remedied in the other Policy Area." Homes on land inside the city count towards the Plymouth Policy Area's 19,000, and a gap there cannot be filled by homes in the towns and villages of South Hams and West Devon.
Even so, the city could not hold all of it. The council's Gateway 1 self-assessment records that the plan relies on "a number of Strategic Urban Extensions (Woolwell, Sherford and Land at West Park Hill)" for growth needs that "could not be met within Plymouth's administrative boundary".
The plan's 26,700 homes over twenty years work out at 1,335 a year, our arithmetic, against 2,638 a year under the standard method for the same three councils, roughly twice as many. The supply statement measures all three councils against that higher figure, while SPT3 still governs where the adopted plan puts new homes.
Selling land for development in Plymouth therefore means selling into a city whose own plan found it full at the edges, while the measure of need has roughly doubled.
Selling a Yard, Garage Court or Older Building in Plymouth
Most land that changes hands for homes in Plymouth is already built on, and policy S4 is the test for it. The council looks for such land through its call for sites, which it says "helps us understand what land will potentially be available for development in the future". The call also asks about land for employment and retail, Gypsy and Traveller sites, data centres and renewable energy.
- No need to repeat earlier submissions. In the council's words, "If you have submitted to a site to us since 2024, there is no need to be resubmit a land parcel unless something has changed."
- Disused land counts. The Gateway 1 self-assessment records "two Call for Sites exercises" so far and lists the brownfield land register and "Vacant, underused, and derelict land and buildings" among its sources of sites, with a new method for assessing land availability in development.
The Levy on New Homes Outside the City Centre
Plymouth has charged a Community Infrastructure Levy since 1 June 2013. Its rate for new homes applies outside the City Centre Zone and is indexed each year:
| Permission granted in | Levy per square metre of new homes, outside the City Centre Zone |
|---|---|
| 2013 (the charging schedule) | £30 |
| 2025 | £52.37 |
| 2026 | £53.57 |
On a new house of 90 square metres granted in 2026, that comes to roughly £4,800, our arithmetic, a cost that sits alongside affordable housing and other obligations. Our guide to Section 106 and CIL explains how the two fit together.
For an owner selling brownfield land in Plymouth, the levy zone, title and access come first, because on a small urban plot they, rather than the supply figure, decide whether homes are workable. Our page on brownfield land and yards shows the kind of site we mean.
Fields at the City Edge: What the Urban Fringe Policy Means for Owners
The open land at Plymouth's edge is covered by policy PLY61 of the Joint Local Plan, under which the councils "will protect the special characteristics and role of the urban fringe countryside" shown on the policies map. It supports "Development for the purposes of agriculture, forestry, public access and enjoyment of the countryside" and community facilities, and it asks that building should not "contribute to the coalescence of separate settlements" and should "Avoid the use of Best and Most Versatile Agricultural Land."
Housing is not among the uses the policy supports, so homes on urban fringe land will usually conflict with it. The decision then turns on the planning balance under policy S5, with the joint shortfall weighed against the harm to the fringe.
What Makes a Fringe Site Worth Examining
- A boundary shared with existing homes on at least one side, so the site reads as part of the city rather than a step into open country.
- A safe road access without crossing land in other hands.
- Distance from the gaps between the city and neighbouring settlements, since the policy resists their coalescence.
- Land outside the best and most versatile agricultural grades, which the policy asks schemes to avoid.
If you are weighing up selling farm land to developers at Plymouth's edge, the policies map and those four points are where a review starts, because the urban fringe policy, more than the supply figure, shapes what an inspector would be asked to balance.
Timing a Sale in Plymouth: A City Plan Timetabled for 2029
The three councils decided not to write a second joint plan. The Plymouth Local Development Scheme of 2025 says the next plan "will not be as a joint local plan covering Plymouth, South Hams and West Devon", while the three councils "will continue to collaborate on strategic spatial planning for the wider area". The city is preparing its plan under the new plan-making system, which the Gateway 1 self-assessment says requires a plan to be adopted "within 30 months of passing through Gateway 1". The council's timetable, first published on 25 June 2026 and last updated on 26 October 2026, sets out these stages:
| Stage | Date in the council's timetable |
|---|---|
| Notice of intention to commence the plan, and timetable published | 25 June 2026 |
| Scoping consultation | 2 to 31 July 2026 |
| Gateway 1 self-assessment summary published | 26 October 2026 |
| Consultation on proposed local plan content and evidence | 22 June to 10 August 2027 |
| Gateway 2, with the assessor's advice published | 17 September 2027; advice 22 October 2027 |
| Consultation on the proposed local plan | 20 June to 22 August 2028 |
| Gateway 3, with the assessor's advice published | 28 September 2028; advice 26 October 2028 |
| Submission for independent examination | 27 October 2028 |
| Examiner's report published | 31 March 2029 |
| Adoption | 24 April 2029 |
The Gateway 1 self-assessment says the council is reviewing its spatial strategy and the role of the city's "3 current Growth Areas".
Reorganisation: Thirteen Parishes Proposed, Then a Review
On 16 July 2026 the government chose the four-council proposal for Devon put forward by Exeter and Plymouth city councils, with a larger Plymouth made up of "Plymouth City Council, plus 13 parishes from South Hams District Council". On 29 October 2026 that decision was withdrawn for a review, with an outcome promised for every area by early 2027. The same letter confirms that the May 2027 elections go ahead to existing councils, and that for areas under review the timetable is elections to new councils in May 2028 and vesting day on 1 April 2029. Until any change takes effect, a site inside today's boundary is decided by the city council under the Joint Local Plan.
The supply figure is a snapshot at 1 April 2026, and we do not predict the next one. For timing, three points follow:
- Urban sites can be taken forward now under policy S4, with the joint supply position already on the record.
- Fringe sites that would need an allocation are best prepared for the consultation on proposed plan content that the timetable puts at 22 June to 10 August 2027.
- Land just outside the boundary should be read against both today's councils and the reorganisation review, which is why we check which parish a site lies in at the outset.
Questions About Selling Land in Plymouth
My land is in Plymouth, but the supply figure covers South Hams and West Devon too. Does that weaken my case?
No. The shortfall is measured across the whole joint plan area, Plymouth included, so it carries the same weight for a site inside the city.
Is there Green Belt around Plymouth that would stop homes on my paddock at the edge of the city?
No. The constraint at the edge is the urban fringe policy, PLY61, shown on the policies map. A paddock beside existing homes, with good access, is worth reviewing.
I put land forward to the call for sites in 2025. Do I need to do it again for the Plymouth Local Plan?
The council says submissions made since 2024 need not be repeated unless something has changed. If it has changed, we can make sure the council holds an accurate boundary.
If the boundary moves to take in parishes from South Hams, will my land near Plymouth come under the city's plan?
That decision was withdrawn for review in October 2026, and no new boundary is in force. Applications are decided by the council that covers the land today, under the Joint Local Plan. We check the parish and the current council at the start of our review.
Would the levy on new homes come out of the price for my yard in Stonehouse or Devonport?
The levy is a building cost any buyer allows for, charged on homes outside the City Centre Zone. We check the zone map as part of our free review and price the option with that already counted.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Plymouth Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Plymouth stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Plymouth? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Devon
County overview
Selling Land in Devon
Sell land for development in Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 87% of need (joint area)
Selling Land in South Hams
Sell land for development in South Hams: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 84% of need
Selling Land in East Devon
Sell land for development in East Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 102% of need
Selling Land in Exeter
Sell land in Exeter, near Topsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 103% of need
Selling Land in Mid Devon
Sell land for development in Mid Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in North Devon
Sell land for development in North Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 122% of need (joint area)
Selling Land in Torridge
Sell land in Torridge, near Bideford. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 87% of need (joint area)
Selling Land in West Devon
Sell land for development in West Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 78% of need
Selling Land in Teignbridge
Sell land for development in Teignbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 40% of need
Selling Land in Torbay
Sell land in Torbay, near Torquay. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Devon
- CornwallCornwall · 3.9 years of housing land
Sources
- Plymouth City Council: 5 Year Housing Land Supply Position Statement and Housing Delivery Test result, 2026 statement (November 2026)
- Plymouth City Council: Plymouth Local Plan timetable (June 2026, updated October 2026)
- Plymouth City Council: Gateway 1 self-assessment summary, Plymouth Local Plan (October 2026)
- Plymouth City Council: Plymouth Local Development Scheme (2025)
- Plymouth City Council: Call for sites (2026)
- Plymouth City Council: Community Infrastructure Levy (2026)
- Plymouth and South West Devon Joint Local Plan: Policy SPT3, provision for new homes (March 2019)
- Plymouth and South West Devon Joint Local Plan: Policy PLY61, development in Plymouth's urban fringe (March 2019)
- GOV.UK: Local authority green belt, England 2025 to 2026, statistical release (October 2026)
- Ministry of Housing, Communities and Local Government: Letter to leaders in Devon, Plymouth and Torbay on local government reorganisation (July 2026)
- Ministry of Housing, Communities and Local Government: Local government reorganisation, letter to 9 areas on withdrawn decisions (October 2026)
- Wikipedia: Plymouth
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.