Skip to content

We pay for the planning.

Call us:020 3953 5635

Devon council area

Selling Land in Mid Devon

Checked on

Mid Devon covers Tiverton, Cullompton and Crediton and a wide farming country of villages reaching into the Blackdown Hills. Its local plan, adopted in July 2020, passed five years old in July 2025, when the government's housing figure took over from the plan's own, and the council's latest statement finds 2.4 years of housing land. A new plan has only just begun, so for well placed land the years before it are unusually open.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Mid Devon and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Mid Devon can show 2.4 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from July 2020, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Mid Devon

  • Fields on the edges of Tiverton, Cullompton and Crediton, with a safe access to an existing road.
  • Land next to the larger S13 villages such as Willand, Uffculme, Sampford Peverell, Bampton, Silverton or Copplestone.
  • Smaller sites for a few dozen homes that do not depend on the Cullompton relief road or junction 28.
  • Yards, former commercial sites and redundant farm buildings, including inherited land with old buildings on it.
  • Larger holdings that the new plan could consider for growth beyond 2033.

Land in open country well away from a town or village, or deep within the Blackdown Hills, faces the hardest tests, and we say so at the start. When a Mid Devon site earns its place, the highways, drainage, ecology and landscape studies are ours to fund, as is the application, all under an option whose price is settled before any of that work begins. Grazing, cropping or letting carries on as normal until completion, and the scale of site the district is short of is described on our paddocks and small sites page.

Is Your Land in Mid Devon a Good Fit?

You do not need to know the planning rules to sell land for development in Mid Devon. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Mid Devon

There are three common ways to sell land with development potential in Mid Devon. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Mid Devon: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Mid Devon and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Mid Devon

Three things shape the chances of selling land for development in Mid Devon: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    103%

    Meeting its housing requirement.

  • Five-year housing land supply

    2.4 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2025, measured against the standard method, 563 homes a year, plus forecast under-delivery of 1,104 homes and a 5% buffer. Stated by Mid Devon District Council.

    Checked source
  • Homes built against homes needed

    1,111

    of 1,078 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    July 2020

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    Plan Mid Devon (2026 to 2046) began in May 2026 under the new plan-making system, with a scoping consultation that closed on 10 July 2026. The council's timetable of May 2026 puts the content and evidence consultation from 22 January to 8 March 2027, submission on 4 September 2028 and consideration of adoption on 1 April 2029

    Checked source

See how Mid Devon compares with the other 221 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Three Market Towns, the M5 and a Large Rural District

Mid Devon District Council is based in Tiverton, the district's largest town, and its area also takes in the towns of Cullompton, Crediton, Bampton and Bradninch. It covers about 913 square kilometres, part of it within the Blackdown Hills National Landscape. The M5 runs through the east of the district, with junction 27 serving Tiverton and junction 28 at Cullompton.

  • A plan built around Cullompton. The adopted local plan sends half of all new homes to Cullompton, 30% to Tiverton and 10% each to Crediton and the rural areas.
  • Twenty-two villages named for limited growth. Policy S13 lists them, from Bampton, Bow and Bradninch to Uffculme, Willand and Yeoford.
  • Countryside everywhere else. Outside the towns and those villages, policy S14 limits new homes to affordable housing for local needs, conversions of suitable buildings and a few other rural cases.
  • Building above its target in the latest count. The Housing Delivery Test 2025 records 1,111 homes built against 1,078 needed, a result of 103%.

Anyone selling land in Mid Devon is therefore dealing with two things at once: a strategy that leans heavily on one town and its new roads, and a land supply that has fallen well below five years while that strategy waits for them.

Why the Land Supply Fell, and What It Means for Your Field

Until the summer of 2025 the council measured its supply against the plan's own figure of 393 homes a year. Its statement for 2023/24 set that figure, plus a past shortfall of 411 homes and a 5% buffer, against 2,392 deliverable homes and found 4.79 years. National policy then replaced the plan's figure with the government's standard method once the plan passed five years, and the council's statement at 31 March 2025 works it through like this:

Source: Mid Devon District Council, Five Year Housing Land Supply Position (March 2025), Tables 1 and 2.
Part of the calculationCouncil's figure
Yearly need used563 homes, the government's standard method
Basic five-year requirement2,815 homes
Forecast under-delivery added1,104 homes
Buffer5%, taking the requirement to 4,115 homes
Allocated sites with full permission928 homes
Windfall sites with permission828 homes
Allocated sites without permissionNone counted
Windfall allowance and communal homes219 homes
Deliverable supply1,975 homes
Result2.4 years

Why the Drop Is So Steep

Three changes arrive together. The yearly figure rises by about 43%, from 393 to 563. Allocated land without permission, which counted for 245 homes in the earlier statement, no longer counts at all. And the council adds a forecast of under-delivery, the amount by which it expects the homes already permitted to fall short of the standard method over the five years. The statement's own note works that forecast from 572 homes a year and arrives at 1,224, while its table uses 563 and 1,104; 572 is also the figure the inspector at Hartnolls Farm gave for the switch. The difference does not change the picture. On our own arithmetic, even without the under-delivery addition, the same 1,975 homes against 563 a year and a 5% buffer would come to roughly 3.3 years.

The completions behind those figures explain the council's caution. Its 2023/24 statement lists every year from 2013/14, and the best of them, 502 homes in 2017/18, still falls short of 563. In 2021/22 and 2022/23 the district completed 238 and 253 homes.

What the Shortfall Does for a Field

Under policy S5 of the August 2026 national framework, homes on land beyond a settlement's limits can be supported where the land is well related to the town or village, can be served by roads, schools and drainage, and unmet need is evidenced. Mid Devon's shortfall counts as evidence of that need, which a decision weighs alongside the site's other merits; it does not settle the question by itself. Within Tiverton, Cullompton, Crediton and the villages, the test is policy S4 instead, under which homes are approved unless the harm would substantially outweigh the benefits; both tests are set out in our 2026 framework guide.

For an owner thinking of selling land for development around Tiverton, Cullompton, Crediton or the larger villages, that gap of more than 2,000 homes on the council's own figures is the strongest reason the district has had in years to look again at land the 2020 plan left out.

Two Tiverton Appeals for Anyone Selling Land on a Town Edge

Two appeals on the edge of Tiverton, decided five months apart in 2025, show how much the supply position decides.

Sources: Planning Inspectorate appeal decisions APP/Y1138/W/22/3313401 and APP/Y1138/W/24/3358001.
Hartnolls FarmTidcombe Hall
ProposalUp to 150 homes and up to 3.9 hectares of employment landUp to 100 homes, including converting Tidcombe Hall and its outbuildings
DecisionDismissed, 27 January 2025Allowed, 24 June 2025
Supply agreed at the inquiry5.22 years for 2022 to 20274.79 years, forecast to fall to around 2.1 years from July 2025
How the case was weighedThe normal planning balanceThe presumption in favour of sustainable development, paragraph 11(d) of the framework then in force

Hartnolls Farm

The January 2025 decision followed a second inquiry into the scheme. With five years of land now common ground, which the inspector treated as a material change since the first inquiry, "the tilted balance is not engaged", and the proposal was held contrary to the plan's strategy for where development goes. The same decision recorded that the standard method would apply from July 2025, an increase "from 393 to 572 dwellings per year" for Mid Devon.

Tidcombe Hall

Five months later the Tidcombe Hall decision went the other way. The inspector still found that the site was not in a suitable location under the development plan, that the scheme would have a moderate adverse effect on the character of the area, and that it would cause some harm to the Grand Western Canal Conservation Area and to Tidcombe Farmhouse. Because the council could not show five years of land, the balance changed: the harm did not significantly and demonstrably outweigh the benefits, among them improvements to Tidcombe Hall itself, and permission was granted with 29 conditions. The inspector gave significant weight both to the homes and to the affordable housing, which the legal agreement set at 30%, above the plan's 28% for Tiverton.

The national framework has been rewritten since, and S4 and S5 have replaced the wording those inspectors applied, so neither decision is a precedent to lean on. What they do show is that in Mid Devon a scheme on the edge of Tiverton was turned down while the council had five years of land, and another was allowed once it did not, and the supply today is lower than the figure recorded at either inquiry.

Cullompton's New Roads and the Smaller Sites the District Lacks

The 2020 plan runs from 2013 to 2033 and provides for at least 7,860 homes, with 147,000 square metres of commercial floorspace:

Source: Mid Devon Local Plan Review 2013 to 2033, policy S2 and paragraph 2.3.
PlaceHomes in policy S2Share
Cullompton3,93050%
Tiverton2,35830%
Crediton78610%
Rural areas78610%

East Cullompton, allocated in policies CU7 to CU12, accounts for 1,750 homes in the plan's trajectory. Tiverton's Eastern Urban Extension has an adopted masterplan for up to 1,520 homes. At junction 27 the plan allocates 42,550 square metres of commercial floorspace for a tourism and leisure led scheme, but no homes.

Roads First, Homes After

The council's Housing Delivery Test action plan of April 2025, written after the 2023 count put delivery at 86%, says plainly that the strategy at Cullompton "is contingent on the delivery of a Town Centre Relief Road". In March 2025 the council signed a funding agreement with Homes England for the road from the Housing Infrastructure Fund, describing it as essential to the homes planned at North West Cullompton and east of the M5, where the first phase of Culm Garden Village is proposed. It said then that main construction was due to start in 2026, with completion due in 2028.

The second piece is new south-facing slip roads at junction 28. In October 2025 the council reported that the spending review had not provided funding to progress it, although Devon County Council had submitted a Strategic Outline Case to the government in May 2024. The council links the junction to up to 5,000 homes in the Culm Garden Village project and said construction could start as early as 2028, after the relief road.

The same action plan names a second weakness: "a significant lack of smaller development sites within the housing land supply in Mid Devon". If you own land around Tiverton, Crediton or one of the S13 villages, that is the opening. The district's largest sites wait on new roads, and a well placed site of a few dozen homes may not need to.

Which Route Fits Your Land: Towns, Villages or Open Country

In a district of market towns and scattered villages, the right route depends on where a field sits in relation to the settlements the plan names:

  1. Inside Tiverton, Cullompton, Crediton or an S13 village. A garden, yard or plot already surrounded by the town or village falls to policy S4, where the starting point is permission.
  2. On the edge of a town or a larger village. Land that reads as part of the settlement and has a safe access is where policy S5 and the supply shortfall do most, as the Tidcombe Hall decision suggests.
  3. Next to a smaller village with a local need. The plan allows exception sites outside settlement limits where affordable homes are needed, with any market homes limited to the lowest number possible to make the affordable homes work.
  4. Redundant farm buildings. Policy S14 supports residential conversion of suitable existing buildings, and permitted development under Class Q is a separate route set out in our Class Q guide.
  5. Open fields away from any settlement. These usually need the new plan, through its site assessment, rather than an application.

What the Plan Asks of a Scheme

Policy S3 sets an affordable housing target of 28% on open market sites of 11 or more homes in the three towns, and 30% on sites of six or more elsewhere, subject to viability. In the part of the district within the Blackdown Hills National Landscape, the national framework gives great weight to conserving its scenery, so a site there needs a stronger case on design and setting.

For an owner of farm land near one of the twenty-two villages, the honest test is scale: a field that would add a modest group of homes in keeping with the village sits far better with this plan than one that would double it.

Before Plan Mid Devon: Timing a Sale of Land in the District

A New Plan to 2046, With Adoption Timetabled for April 2029

The council launched work on its next plan, Plan Mid Devon, in May 2026 under the new plan-making system, with a provisional period from 2026 to 2046. Its local plan timetable of May 2026 sets out the stages:

Source: Mid Devon District Council, Local Plan Timetable (May 2026). Dates are the council's and may move.
StageCouncil's timetable
Notice of intention and scoping consultationHeld 26 May to 10 July 2026
Gateway 1 self-assessment summary19 October 2026
Consultation on plan content and evidenceFrom 22 January 2027, comments by 8 March 2027
Gateway 2 advice1 November 2027
Consultation on the proposed planFrom 21 January 2028, comments by 20 March 2028
Gateway 3 assessment3 July 2028
Submission for examination4 September 2028
Council to consider adoption1 April 2029

Land put forward in the council's calls for sites of 2021 and 2025 has been assessed in a land availability assessment published in June 2026, which the council will use to choose the sites in the new plan. That assessment decides nothing about permission or allocation; the content and evidence consultation the timetable places in early 2027 is the next public stage at which the council's choices can be commented on. Our guide to calls for sites and local plans explains why evidence ready by then counts for most.

The Next Supply Statement and the Next Delivery Count

The next statement, for land at 31 March 2026, will still be measured against the government's standard method, since the new plan is not timetabled for adoption until 2029. Whether the deliverable land grows enough to close the gap is not something we would predict.

The Housing Delivery Test is published once a year, and its latest edition, the Housing Delivery Test 2025, came out on 17 August 2026. At 103%, none of its consequences applies to Mid Devon. The district knows the lower bands from experience: a result under 95% is what obliged it to write the 2025 action plan, a fall under 85% would raise the supply buffer to 20%, and under 75% policy S5 would take the district's unmet need as shown without further argument.

Reorganisation in Devon

The government paused its decision on reorganisation for Devon, Plymouth and Torbay in September 2026 and, on 29 October 2026, withdrew it, keeping all the proposals under consideration with an outcome promised by early 2027. Until anything changes, Mid Devon District Council decides planning applications and is preparing the new plan.

  • Land on the edge of a town or larger village deserves a review in the years before Plan Mid Devon fixes a housing figure of its own, with the shortfall on the record.
  • Open fields that need an allocation should have their evidence ready for that early 2027 consultation.
  • Yards and plots inside a town or S13 village can be considered at any point, because policy S4 does not depend on the housing numbers, and redundant farm buildings have the conversion routes described above.

Questions About Selling Land in Mid Devon

The council built more than its target in the latest count. Why does it have so little land?

The delivery count and the land supply answer different questions. The count looks back at homes built against need over three years, while the supply looks forward at land ready to build. Once the 2020 plan passed five years, supply was measured against the government's higher figure, and the council could count only 2.4 years.

Does the Tidcombe Hall appeal mean a field next to Tiverton will get permission?

No. It shows that a shortfall changed the balance on one site, and the policies have since been rewritten. Each site is judged on its own access, landscape and setting, and the Hartnolls Farm refusal shows how strictly the council defends its strategy where it can.

My land is near Cullompton but outside the garden village. Will I have to wait for the relief road?

Not necessarily. The road is tied to the large allocations, but a smaller site with its own safe access may not depend on it. Junction 28 and town traffic are things we check early in the review.

I own a field next to Uffculme. Is it treated as countryside?

Land outside the village's settlement limit is countryside under policy S14, but Uffculme is one of the plan's twenty-two villages for limited development, and land well related to it is where S5 and the shortfall can help.

I put land forward in the 2025 call for sites. Is it now in the new plan?

Not as such. The council has assessed the land put forward in 2021 and 2025, and says that assessment decides neither permission nor allocation. It will use it to choose sites for Plan Mid Devon, and the evidence behind a site is what carries it through that choice.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Mid Devon Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Mid Devon stands on housing shapes which matter most here.

Selling Land in Mid Devon? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Devon

  • County overview

    Selling Land in Devon

    Sell land for development in Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 84% of need

    Selling Land in East Devon

    Sell land for development in East Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 122% of need (joint area)

    Selling Land in North Devon

    Sell land for development in North Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 122% of need (joint area)

    Selling Land in Torridge

    Sell land in Torridge, near Bideford. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 87% of need (joint area)

    Selling Land in West Devon

    Sell land for development in West Devon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 78% of need

    Selling Land in Teignbridge

    Sell land for development in Teignbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 102% of need

    Selling Land in Exeter

    Sell land in Exeter, near Topsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 87% of need (joint area)

    Selling Land in Plymouth

    Sell land in Plymouth, near Plympton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 87% of need (joint area)

    Selling Land in South Hams

    Sell land for development in South Hams: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 40% of need

    Selling Land in Torbay

    Sell land in Torbay, near Torquay. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Devon

  • SomersetSomerset · 3.32 years of housing land