Areas we cover
Selling Land in Cambridgeshire
Checked on
Cambridgeshire has grown quickly for decades, and five of its six councils are building more homes than the government's delivery test asks. Yet three councils cannot show five years of housing land, and the Cambridge Green Belt, water and Fens flood risk shape the rest. This page explains what that means for land in each part of the county.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential across Cambridgeshire and welcome land of every kind in all six of its council areas: fields and paddocks, inherited land, old yards and larger holdings.
Three of Cambridgeshire's six councils are short of the five years of housing land national policy expects. In those council areas, national policy counts that as evidence that more homes are needed, so a well placed field next to a town or village can make a case outside the local plan, weighed with everything else. Elsewhere the local plan is the surest route. Land in the Green Belt faces stricter national tests. The table below shows each council.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
Selling Land in Cambridgeshire, Council by Council
The table shows each council's result in the government's Housing Delivery Test 2025 and where its local plan stands, using the Planning Inspectorate's own monitoring data.
Just over the county line: Bedford (Bedfordshire), Braintree (Essex), Central Bedfordshire (Bedfordshire), King's Lynn and West Norfolk (Norfolk), North Hertfordshire (Hertfordshire), North Northamptonshire (Northamptonshire), South Holland (Lincolnshire), South Kesteven (Lincolnshire), Uttlesford (Essex) and West Suffolk (Suffolk).
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026, with later milestones we have checked on council and government websites marked "Checked". Five-year land supply figures come from each council's own latest statement, or the latest figure tested at appeal, linked in each row. A Housing Delivery Test result below 75%, or a supply short of five years, counts as evidence of unmet housing need under policy S5 of the NPPF. Local plans move quickly, so always check the council's own website for the latest position.
Cambridge and South Cambridgeshire
The two councils share a planning service and a joint Greater Cambridge Local Plan. Its final consultation closed on 25 September 2026, with submission due by the end of December. It plans for more than 50,000 homes between 2024 and 2045, around 37,000 of which already have permission or are allocated in current plans. Supply is now counted separately: the September 2026 addendum gives South Cambridgeshire 7.83 years, so its open fields mostly come through the plan, while the city's shortfall matters for grey belt on its edge.
Huntingdonshire
Huntingdonshire covers Huntingdon, St Neots, St Ives and Ramsey, and includes Alconbury Weald on the former airfield north of Huntingdon. Its plan was adopted in 2019 and it delivered 136%, yet its land supply is 3.68 years. Its Local Plan to 2046 is open for final comment until 28 October 2026. The A14 and A1 meet here, and St Neots and Huntingdon are on the East Coast Main Line.
East Cambridgeshire
East Cambridgeshire covers Ely, Soham, Littleport and the villages between Cambridge and Newmarket. Its plan was updated in 2023, delivery is at 116%, supply is 6.17 years, and work on a new plan was put on hold in February 2025. Ely is the main growth town, with rail links to Cambridge, King's Lynn and Peterborough.
Fenland
Fenland covers Wisbech, March, Chatteris and Whittlesey. It delivered 117% of its need on a plan from 2014 and reports 6.6 years of land. Its new plan, Fenland 50, has initial proposals due in early 2027. On its low, drained farmland, where a field sits in the flood zones matters as much as the numbers.
Peterborough
Peterborough delivered 100% of its need on a plan adopted in 2019, but finds 4.38 years of housing land. Its new plan was approved by Cabinet on 1 October 2026 for a final six-week consultation, running from 2 October to 12 November 2026, ahead of submission by 31 December 2026. The city has grown steadily through large urban extensions and has fast trains to London on the East Coast Main Line.
Taken together, the council your land falls in sets the likely route for a sale. In Huntingdonshire and Peterborough the supply shortfall can support an application now, while in East and South Cambridgeshire most open fields wait on a plan, and in Cambridge the questions are mostly about urban plots and the Green Belt edge.
The Land We Buy in Cambridgeshire
- Fields of 2 acres or more next to a town or a larger village.
- Land in Flood Zone 1, particularly in and around the Fens.
- Land that reaches a road or has a clear route to one.
- Former yards, depots and other previously developed land, including in the Green Belt.
- Land within walking distance of a station with a good service.
- Holdings of 20 acres upwards near Huntingdon, St Neots, Ely, Cambourne or Peterborough.
Land in the Cambridge Green Belt or Flood Zone 3 is not ruled out, but the bar is higher, and our review will say so honestly.
Is Your Land in Cambridgeshire a Good Fit?
You do not need to know the planning rules to sell land for development in Cambridgeshire. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Cambridgeshire
There are three common ways to sell land with development potential in Cambridgeshire. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Cambridgeshire: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Cambridgeshire and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
The planning detail in full
Six Councils, and What Each Means for Selling Land in Cambridgeshire
Cambridgeshire has five district councils, Cambridge, East Cambridgeshire, Fenland, Huntingdonshire and South Cambridgeshire, with Cambridgeshire County Council running roads and schools. Peterborough is a separate unitary council. The Cambridgeshire and Peterborough Combined Authority, led by an elected mayor, covers all six.
- Strong delivery almost everywhere. South Cambridgeshire delivered 148% of the homes it needed and Huntingdonshire 136%. No council in the county is below 75%.
- Cambridge itself is at 82%. That means a 20% buffer on its land supply, which stands at 2.72 years, but the city has little open land and Green Belt on every edge.
- The Cambridge Green Belt. A ring of Green Belt around the city, covering 26,090 hectares in the latest government figures.
- Water is a real constraint. The Environment Agency has objected to large schemes around Cambridge because of the effect of water abstraction on chalk streams.
- No National Landscape. Cambridgeshire has none, but flood risk in the Fens does a similar job of limiting where homes can go.
- Reorganisation is on hold. On 7 September 2026 the government paused the proposals for new unitary councils in Cambridgeshire and Peterborough pending a national review. May 2027 elections use current boundaries, and existing councils keep deciding applications.
What Shapes a Sale of Development Land in Cambridgeshire
The Cambridge Green Belt
The Cambridge Green Belt keeps the city compact and protects the countryside setting that runs right into its historic centre. It covers land in the city and much of the ring of villages around it in South Cambridgeshire. Land has been released through local plans before, for example for Eddington and the Biomedical Campus, and the new plan proposes more. Policy S5 does not apply in the Green Belt, but land that does not strongly contribute to its purposes, which include the setting of a historic town, can be grey belt. Homes there need evidence of need, usually a supply short of five years or a result under 75%, and supply is counted council by council: the city's shortfall supplies it, South Cambridgeshire's figure does not. Our grey belt guide explains the test.
Water Supply
Cambridge, in one of England's driest areas, draws much of its water from the chalk aquifer that feeds local chalk streams. Since December 2022 the Environment Agency has objected to several large housing schemes in the county over water supply. Cambridge Water and Anglian Water are planning a pipeline from Grafham Water to Cambridge and a new Fens Reservoir, which is expected to supply water from the mid to late 2030s. Until then, water is one of the main things that decides how fast growth around Cambridge can go.
Flood Risk in the Fens
Large parts of Fenland, East Cambridgeshire and Huntingdonshire are former wetland, drained over centuries and kept dry by pumps and internal drainage boards. The Great Ouse, Nene and Cam and the Ouse Washes all shape flood risk. Land in Flood Zones 2 and 3 faces the sequential test. In Fenland, the council's flood risk guidance note usually weighs a site against other land around the same settlement, not the whole district. How that works is explained in our flood risk guide.
Cambridge Colleges and the Cathedrals at Ely and Peterborough
Cambridge's historic centre and colleges are of international importance, and Ely and Peterborough both have medieval cathedrals. Many villages have conservation areas. Heritage usually shapes the layout and height of a scheme rather than stopping it.
Transport
The A14, A1, M11, A428, A10 and A11 carry most traffic, and the East Coast Main Line, the lines from Cambridge to London, Ely and King's Lynn, and the guided busway serve the main towns. East West Rail is planned to reach Cambridge by way of a new station at Cambourne, and its 2026 consultation included a new Cambridge East station.
Few fields for sale in Cambridgeshire face all of these at once. Land around Cambridge is mostly judged on Green Belt and water, land in the Fens on its flood zone, and heritage tends to decide the layout rather than whether homes can be built at all.
Where Growth Is Focused, and the Land We Look for Around It
Demand comes from the Cambridge economy and from the cheaper, well connected towns further out. The places we watch most closely are:
| Area | Why it matters |
|---|---|
| Villages around Cambridge | Very high values, Green Belt and grey belt questions, and water supply limits. |
| Cambourne and the A428 | A growing new town with a planned East West Rail station and further growth in the new plan. |
| Northstowe and Waterbeach | New towns north of Cambridge with thousands of homes still to be built. |
| Huntingdon, St Neots and St Ives | Strong delivery and good road and rail links, outside the Green Belt. |
| Ely and Soham | Rail links to Cambridge and steady growth in East Cambridgeshire. |
| Peterborough | A city with fast trains to London, lower land values and continuing expansion. |
We are interested in land of 2 acres or more on the edge of these towns and the larger villages around them, particularly where the site is well related to existing homes and has a safe route to a road.
What This Means If You Are Selling Land in Cambridgeshire
No council is below 75%, but the five-year supply is a separate test. Under policy S5, a supply short of five years is evidence of unmet need to be weighed, not an automatic finding, and outside the Green Belt that applies in Huntingdonshire and Peterborough. Where both tests are passed, open fields mostly come through a local plan. The main routes are:
- A planning application under policy S5. In Huntingdonshire and Peterborough, a field adjoining a town or village where roads, schools and drainage can cope.
- Local plan allocation. The Greater Cambridge, Huntingdonshire and Peterborough plans are near submission, so an omitted site is argued at examination or kept for review. Fenland 50 is at an early stage. The route is set out in our guide to calls for sites.
- Grey belt, inside Cambridge. Previously developed land and contained fields that do little to stop sprawl or merging can qualify while the city is short, subject to the Golden Rules.
- Previously developed land. Old yards, depots and commercial sites, which national policy favours both inside and outside settlements.
- Sites near stations. National policy now supports higher density homes within walking distance of well connected stations, depending on the station and its service.
- Council position
- 117% on delivery and 6.6 years of land, so no shortfall argument
- Constraints
- No Green Belt or National Landscape, but much of the surrounding land is in Flood Zone 3
- Likely route
- Putting the land forward for Fenland 50, with a flood risk case showing why the site is the best option around that town
- Your costs
- None. Every planning cost, including any appeal, is paid by us
- What we would offer
- An option agreement at an agreed price, with the planning costs paid for you
An illustration of how we think about a site, not a real offer. Every site is different, and our free desktop review looks at the specific field.
In the Fens, a Flood Zone 1 field on a town edge can be worth far more than its neighbours; near Cambridge, the questions are Green Belt and water. A free land value review is the quickest way to find out where your land stands.
Questions About Selling Land in Cambridgeshire
Why does water supply matter for my land?
The councils are cautious about approving large amounts of housing until new supplies are in place. It tends to affect the timing and design of a scheme more than whether a good site is suitable.
Can I still put land into the Greater Cambridge Local Plan?
The final consultation, which closed on 25 September 2026, was about whether the plan is sound, not new sites. Omitted sites can be argued at examination or kept for later reviews.
Is Cambridge Green Belt land worth raising with you at all?
Yes. Some Green Belt land is grey belt, previously developed land has its own route, and land has been released through plans before. Which council your land is in matters, because the need test for grey belt follows each council's own supply. We check the evidence and tell you honestly where your land stands.
Does it matter which new council my land ends up in?
Not yet. No decision has been made on reorganisation, and existing councils and plans continue in the meantime.
How long should the process take in Cambridgeshire?
It varies with the route. Waiting for a new local plan usually takes longer than a strong planning application, and we will recommend one or the other before you commit to anything. You keep using the land throughout and pay nothing towards the planning on either route. Our guide on how long planning takes sets out the stages.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
Selling Land in Cambridgeshire? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
Sources
- GOV.UK: Housing Delivery Test, 2025 measurement
- Planning Inspectorate: Local plans, monitoring progress
- Cambridge City Council: Greater Cambridge Local Plan final consultation (July 2026)
- GOV.UK: Local authority green belt, England 2024 to 25
- Cambridge Past, Present and Future: Cambridge Green Belt
- Local Government Lawyer: Environment Agency water supply objections (2023)
- Cambridge Water: Grafham to Cambridge pipeline
- Cambridge Water: Fens Reservoir
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
- East West Rail: Consultation 2026
- Greater Cambridge Shared Planning: Greater Cambridge Local Plan
- Greater Cambridge Shared Planning: Housing Land Supply Addendum (September 2026)
- Huntingdonshire District Council: Local Plan Update
- East Cambridgeshire District Council: new Local Plan put on hold (February 2025)
- Fenland District Council: Fenland 50 Local Plan timetable
- Fenland District Council: Flood Risk Interim Guidance Note (June 2015)
- Peterborough City Council: Local Plan Review
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.
Other Counties We Cover
29 counties, 188 councils
57 of those councils are below 75% in the government's Housing Delivery Test 2025. Point to a county to see its figures.
Cambridgeshire
6 councils, none of them built fewer than 75% of the homes needed in the government's latest count.
You are viewing this county- Oxfordshire
- Buckinghamshire
- Hampshire
- Surrey
- Kent
- Bedfordshire
- Hertfordshire
- Essex
- Warwickshire
- Worcestershire
- Northamptonshire
- Leicestershire
- Nottinghamshire
- Derbyshire
- Gloucestershire
- Wiltshire
- Cheshire
- West Sussex
- Berkshire
- Suffolk
- Norfolk
- East Sussex
- Staffordshire
- Rutland
- Herefordshire
- Shropshire
- West Midlands
- Lincolnshire