Skip to content

We pay for the planning.

Call us:020 3953 5635

Lincolnshire council area

Selling Land in South Kesteven

Checked on

South Kesteven is the district of Grantham, Stamford, Bourne and the Deepings, crossed from north to south by the A1. Its plan of January 2020 still decides applications, the council counts 4.07 years of housing land, and in July 2026 it stopped its plan review to start again under the new system, so every site must be put forward afresh.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in South Kesteven and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

South Kesteven can show 4.07 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from January 2020, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in South Kesteven

  • Fields on the edges of Grantham, Great Gonerby and Barrowby, including land near the southern relief road.
  • Land beside Stamford, Bourne, Market Deeping or Deeping St James that relates well to the town.
  • Fields and paddocks adjoining a Larger Village such as Long Bennington, Corby Glen, Colsterworth, Langtoft or Thurlby.
  • Plots, large gardens, yards and redundant farm buildings inside a settlement.
  • Larger farm holdings, including land put forward to the old review, ready for the 2026 call for sites.

For a single paddock or a whole farm, the price is fixed in the option before any work begins, set above what the land is worth in its current use. We then pay for the surveys, the community consultation SP4 asks for, the call for sites submission and the planning application, at our own cost and risk. You carry on farming until completion, and if permission is not granted the land remains yours and you owe us nothing. Our farmland page explains how we look at whole holdings.

Is Your Land in South Kesteven a Good Fit?

You do not need to know the planning rules to sell land for development in South Kesteven. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in South Kesteven

There are three common ways to sell land with development potential in South Kesteven. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in South Kesteven: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in South Kesteven and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in South Kesteven

Three things shape the chances of selling land for development in South Kesteven: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    97%

    Meeting its housing requirement.

  • Five-year housing land supply

    4.07 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2024, measured against the standard method, 895 homes a year, plus a 5% buffer. Stated by South Kesteven District Council.

    Checked source
  • Homes built against homes needed

    1,900

    of 1,959 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    January 2020

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    On 21 July 2026 the Cabinet stopped the Local Plan Review and began a new plan under the new system. The timetable that took effect on 28 October 2026 puts scoping consultation from 6 January to 3 February 2027, Gateway 1 on 17 March 2027, submission on 21 February 2029 and adoption on 22 August 2029; the 2026 call for sites opened on 28 October 2026 with a closing date of 9 December 2026

    Checked source

See how South Kesteven compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Grantham, Three Market Towns and the A1

South Kesteven District Council covers about 943 square kilometres of south west Lincolnshire, with around 147,000 people. Grantham, the council's seat and largest town, sits on the East Coast Main Line; Stamford, on the River Welland, has trains to Peterborough and Birmingham; Bourne and the two Deepings, Market Deeping and Deeping St James, make up the south. The A1 runs through the district from north to south.

  • One town at the top. Policy SP2 of the adopted Local Plan 2011 to 2036 focuses the majority of development on Grantham, as a Sub-Regional Centre.
  • Three market towns next. For Stamford, Bourne and the Deepings, priority goes to sites inside the built-up town and appropriate edge of settlement extensions.
  • Fifteen Larger Villages. Ancaster, Barkston, Barrowby, Baston, Billingborough, Caythorpe and Frieston, Colsterworth, Corby Glen, Great Gonerby, Harlaxton, Langtoft, Long Bennington, Morton, South Witham, and Thurlby and Northorpe, where development beyond the allocations is supported if it keeps the village's character.
  • Some sixty Smaller Villages. Places such as Aisby, Dry Doddington and Woolsthorpe by Belvoir, under policies SP3 and SP4.
  • A plan for 16,125 homes. Policy SP1 sets a minimum of 16,125 homes over 2011 to 2036, about 650 a year.

The Housing Delivery Test 2025 counted 1,900 homes built in the district over three years where 1,959 were needed, a result of 97%. The council's monitoring report records 683 net completions in 2024/25, the highest since 2019/20, of which 291 were affordable.

If you are thinking of selling land in South Kesteven, the tier of the nearest settlement is the first fact that matters: a field beside Grantham, a market town or a Larger Village starts from a very different place than one beside a hamlet.

Short of Five Years by 872 Homes, on the Council's Own Count

South Kesteven's latest statement of its five-year supply, issued in March 2025 with a base date of 1 April 2024, finds 4.07 years. With the plan more than five years old, it measures against the standard method's 895 homes a year rather than the plan's 650:

Source: South Kesteven District Council, Five Year Housing Land Supply Statement 2024 to 2029 (March 2025), tables 1 and 4 to 7.
Part of the calculationCouncil's figure
Yearly need, standard method895 homes
Five years of need4,475 homes
Buffer5%, 224 homes, as the delivery test was passed
Five-year requirement with buffer4,699 homes
Small sites with permission, after a 10% lapse allowance655 homes
Windfall allowance, 30 a year from 2026/2790 homes
Large sites with permission, started and not started854 homes
Urban extensions with permission642 homes
Local plan allocations1,545 homes
Council capital programme41 homes
Deliverable supply3,827 homes
Result4.07 years, a shortfall of 872 homes

Two of the largest allocations add nothing to that total: Stamford North, because its planning application had not progressed as anticipated, and the Prince William of Gloucester Barracks at Grantham, where no application had been made.

What a Supply Below Five Years Does for a Field

Under the August 2026 framework, policy S5 supports new homes beyond a settlement's edge where the land relates well to the place, local infrastructure can serve it, and unmet need is evidenced. A supply below five years is evidence of that need for the decision maker to weigh; it is not an automatic finding, and every application is still judged on its own merits.

For an owner whose field adjoins a market town or Larger Village, that is the opening: land able to deliver homes within five years answers a gap the council's own figures put at several hundred homes.

Grantham's Four Urban Extensions, and How Far They Have Got

Most of the plan's growth rests on four large sites around Grantham, named in policy GR3. Policy H1 gives the homes expected by 2036 and records that the two biggest could hold far more in time:

Sources: South Kesteven Local Plan 2011 to 2036, policy H1; Five Year Housing Land Supply Statement (March 2025), appendix 1; Authority Monitoring Report 2024 to 2025, table 9.
SiteHomes in the plan to 2036Position in the council's 2025 evidence
Spitalgate Heath Garden Village (GR3-H1)1,650, of an estimated 3,700112 homes counted in the five years; around 3,400 expected overall; none built by March 2025
Rectory Farm phase 2 (GR3-H2)1,150448 committed, 17 built; 388 counted in the five years
Rectory Farm phase 3 (GR3-H3)404Nothing committed or built
Prince William of Gloucester Barracks (GR3-H4)1,775, of an estimated 4,000No application; not counted

Poplar Farm, an extension beside Rectory Farm, has permission, but its delivery is capped at 750 homes until a link road is built, so the statement counts only 77 of its homes.

The Southern Relief Road

Lincolnshire County Council is building the 3.5 kilometre Grantham Southern Relief Road in three phases. The first, a roundabout off the B1174, opened in August 2016, and the second, joining the B1174 to the A1, was completed in December 2022. Work on the third, linking the A52 at Somerby Hill, began in April 2021; the push of its bridge over the East Coast Main Line and the River Witham began in March 2026 and was recorded as complete in October 2026, and the county gives full completion as 2028, subject to change. The monitoring report lists £1,140,400 from Rectory Farm phase 2 towards the road.

For land on the edge of Grantham outside these four sites, their pace matters. Each year they run behind keeps the supply short, while the relief road changes which fields on the south side of the town can be reached.

Edges of Stamford, Bourne, the Deepings and the Larger Villages

Away from Grantham, each market town carries its own allocations. Stamford North, allocated for 1,300 homes on 53 hectares, was found by the inspector to be "the logical and most sustainable option for Stamford", with capacity for around 2,000 homes when joined with Quarry Farm across the Rutland boundary. The 2025 statement expects the Elsea Park zones at Bourne to be completed within its five years, while the 680-home allocation off Linchfield Road at Market Deeping had no application.

Land that is not allocated is tested against local and national policy together:

  1. Inside the built-up part of a town or village. National policy S4 says a scheme should be approved unless its harm would substantially outweigh its benefits, and policy SP3 supports infill or previously developed land within the existing built form.
  2. Against the edge of a settlement. Policy SP4 asks for land adjoining the existing pattern of development that does not extend obtrusively into open countryside, and, for housing, a proven local need.
  3. The community support test. SP4 also asks for clear evidence of substantial support from the local community, through consultation before the application or the backing of the parish or town council.
  4. Where unmet need is evidenced. With the supply below five years, national policy S5 is weighed alongside SP4 for well related land that infrastructure can serve.
  5. Affordable homes for a village. A rural exception site need not meet the community support criterion, but must show local need from a housing needs survey and a local connection for its residents.

That test puts the community's view at the front of an edge-of-village scheme. Consultation with the parish council takes money and time, and it is work we carry out and pay for. Our page on paddocks and small sites covers the smaller plots where SP3 usually applies.

For most owners selling land for development in South Kesteven outside Grantham, the question is less whether homes are needed than whether the field reads as part of the town or village and the community can be brought with the scheme.

Why the Plan Review Was Stopped, and What Replaces It

The review's draft plan of 2024 worked to 701 homes a year. The December 2024 framework changed how need is calculated, and the consultation on further sites of July 2025 worked to 886 a year, 17,720 over 2023 to 2043, with about 11% added for flexibility. Among the sites it proposed:

Source: South Kesteven District Council, Regulation 18 Local Plan, Proposed Housing and Mixed-Use Site Allocations (July 2025), table 4.
PlaceSite proposed in July 2025Homes
GranthamLand north of Gorse Lane (SKPR-323)874
GranthamLand south of Gorse Lane, mixed use with about 20 Traveller pitches (SKPR-334)530
BourneLand south west of Raymond Mays Way (SKPR-7)270
The DeepingsLand east of Linchfield Road (SKPR-330)840
BarrowbyLand east of The Drift and south of Low Road (SKPR-327)455
Corby GlenLand fronting Bourne Road and Swinstead Road (SKPR-233)293

The Decision of 21 July 2026

To be examined under the old rules, the plan had to be submitted by December 2026. On 21 July 2026 the Cabinet agreed that the council should cease work on what it called the legacy local plan and begin plan-making under the new system. The decision records that the evidence and final draft could no longer realistically be ready for a September 2026 consultation, and that pressing on would mean abortive work and most likely an unsound plan.

The council's questions and answers page sets out the consequence: sites identified for potential allocation at Regulation 18 carry no weight at present, the review's work will be built on, and all sites must be resubmitted. Until a new plan is adopted, the 2011 to 2036 plan remains the development plan.

An owner of a July 2025 site, at Gorse Lane, Linchfield Road or Barrowby, therefore starts again level with everyone else, and the evidence behind the land will count for more than its earlier place on a list.

What the Timetable to 2029 Means for Landowners in South Kesteven

A Call for Sites That Every Owner Has to Answer

The council's 2026 call for sites opened on 28 October 2026 with a closing date of 9 December 2026. It seeks land for homes, employment, mixed use, a new settlement and Traveller sites, gives no minimum size, and states that sites from earlier calls or the review will not be considered unless resubmitted.

The timetable that took effect on 28 October 2026 sets out the stages of a new plan for 1 April 2026 to 31 March 2046:

Source: South Kesteven District Council, Local Plan timetable (effective 28 October 2026). The page gives two closing dates for the proposed plan consultation, 22 November and 6 December 2028.
StageCouncil's timetable
Scoping consultation6 January to 3 February 2027
Gateway 1, which starts the 30-month process17 March 2027
Consultation on proposed content and evidence12 January to 23 February 2028
Gateway 221 June 2028
Consultation on the proposed planFrom 11 October 2028
Gateway 37 February 2029
Submission for examination21 February 2029
Adoption22 August 2029

The call for sites therefore comes before the scoping consultation, and well before the content consultation of January 2028. Our plan-making guide for landowners explains the evidence a site needs at each stage.

Supply, Delivery and Reorganisation

In November 2026 the council's supply page still carried the statement at 1 April 2024, and the standard method, not the plan, stays the yardstick for the next one. The Housing Delivery Test 2025, published on 17 August 2026, put South Kesteven at 97%, against 95% in the result its March 2025 statement used. For South Kesteven to face an action plan its result would have to fall under 95%; a 20% buffer follows under 85%, and under 75% unmet need is treated as evidenced for policy S5.

The council's July 2026 decision weighed the unknown shape of local government reorganisation. On 29 October 2026 the government withdrew its July decision on new unitary councils for Lincolnshire, kept every proposal for the area under consideration with an outcome promised by early 2027, and said that elections due in May 2027 would be held for the councils that exist now, which leaves South Kesteven District Council as the planning authority for the new plan's early stages.

So a field against a market town or Larger Village can be tested now under the 2011 to 2036 plan and the shortfall, while a larger holding belongs in the 2026 call for sites, with its evidence built up for the content consultation of January 2028.

Questions About Selling Land in South Kesteven

My land was put forward to the old Local Plan Review. Is it still in the running?

Only if it is submitted again. The council says sites from earlier calls or the review must be resubmitted to the 2026 call for sites, and that sites proposed at Regulation 18 carry no weight at present. For land we take on, we prepare and send the submission, and our how it works page sets out what follows.

Do I need the parish council's support to sell a field next to my village?

Not to sell it, but an application under policy SP4 must show clear evidence of substantial support from the local community, or the backing of the parish council or neighbourhood plan group. We run that consultation ourselves, at our own cost, alongside the surveys and the application.

Does the barracks site at Grantham take away the need for other land?

Not yet. The Prince William of Gloucester Barracks is allocated for 1,775 homes by 2036, but the council's 2025 statement records no application and counts none of its homes, which is part of why the supply is short.

I farm near Stamford. Has Stamford North used up the town's growth?

It is the town's main allocation in the current plan, but the 2025 statement counted none of its homes. Land around Stamford can be put forward to the new plan for 2026 to 2046, and the council's July 2025 work put need at 886 homes a year, against the current plan's 650.

Would I be better waiting for the new plan in 2029?

It depends on the land. A field beside a market town or Larger Village can be tested against the shortfall without waiting. A large holding usually needs the new plan, and that route starts with the 2026 call for sites, which has a closing date of 9 December 2026.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in South Kesteven Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where South Kesteven stands on housing shapes which matter most here.

Selling Land in South Kesteven? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Lincolnshire

  • County overview

    Selling Land in Lincolnshire

    Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in North Kesteven

    Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 161% of need

    Selling Land in South Holland

    Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 127% of need

    Selling Land in Boston

    Sell land in Boston, near Kirton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 129% of need

    Selling Land in East Lindsey

    Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 141% of need (joint area)

    Selling Land in Lincoln

    Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 141% of need (joint area)

    Selling Land in West Lindsey

    Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in North Lincolnshire

    Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 244% of need

    Selling Land in North East Lincolnshire

    Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Lincolnshire