Lincolnshire council area
Selling Land in North Lincolnshire
Checked on
North Lincolnshire still plans from a Core Strategy adopted in June 2011, because the plan meant to replace it was withdrawn from examination in 2024 and the council has started again under the new national system. With building well ahead of target, low ground on the Isle of Axholme and the Humber bank, and a timetable that runs to 2029, the question for an owner here is which route suits a particular field, and when.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in North Lincolnshire and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
North Lincolnshire can show 5.07 years of housing land, more than the five years national policy expects, and built 137% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from June 2011, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in North Lincolnshire
- Fields on the edges of Brigg, Barton-upon-Humber, Kirton in Lindsey, Winterton and Broughton, with a road frontage or a realistic way in.
- Land around Scunthorpe and Bottesford, where the Core Strategy planned most of its growth.
- Plots on the higher ground at Epworth, Haxey and Crowle that stay clear of the low drained land around them.
- Farmyards, depots and former industrial land in or beside the towns, including brownfield sites near the steelworks.
- Inherited farmland where the family wants to know whether it is worth putting forward to the new plan.
Wherever the land sits, we look first at the flood zone, the drainage board's watercourses, access and how the field relates to the settlement it adjoins. If a site is worth taking on, we take it under an option whose price is settled before any work begins and sits above the land's worth in its present use, and we pay for every survey, submission and application, including the work on flood risk that this borough asks for. Farming or letting carries on as normal until completion, and should permission be refused for good, the land is still yours and you owe us nothing. The farmland we buy is described on its own page, which shows the larger holdings we take on, and families dealing with an estate can read our guide to probate and selling land.
Is Your Land in North Lincolnshire a Good Fit?
You do not need to know the planning rules to sell land for development in North Lincolnshire. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in North Lincolnshire
There are three common ways to sell land with development potential in North Lincolnshire. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in North Lincolnshire: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in North Lincolnshire and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in North Lincolnshire
Three things shape the chances of selling land for development in North Lincolnshire: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
137%
Meeting its housing requirement.
Five-year housing land supply
5.07 years
Five years or more of deliverable housing land. Position at 1 April 2024, measured against the standard method, 637 homes a year, plus a 5% buffer. Stated by North Lincolnshire Council (five years and approximately one month).
Checked sourceHomes built against homes needed
1,533
of 1,117 needed, April 2022 to March 2025
Most recent strategic plan adopted
June 2011
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The North Lincolnshire Local Plan 2020 to 2038, submitted on 11 November 2022, was withdrawn from examination on 15 November 2024 after a cabinet resolution of 30 September 2024. On 13 July 2026 the cabinet moved plan-making to the new national system; the council published its notice of intention and timetable on 28 July 2026 and ran a scoping consultation from 4 August to 1 September 2026. Its timetable of July 2026 puts the Gateway 1 self-assessment on 30 November 2026, consultation on proposed content from 28 June to 9 August 2027, submission on 23 November 2028 and consideration of adoption on 30 May 2029
Checked source
See how North Lincolnshire compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Scunthorpe, the Isle of Axholme and the Humber Bank
North Lincolnshire Council has been a unitary authority since Humberside County Council was abolished in 1996, and its offices are in the centre of Scunthorpe. The borough covers about 846 square kilometres and an estimated 171,336 people in 2024. Scunthorpe is by far the largest place. The market towns of Brigg, Barton-upon-Humber, Kirton in Lindsey and Winterton lie on the same side of the Trent as the town, and across the river to the west lies the Isle of Axholme, with Epworth, Crowle and Haxey on its higher ground.
- An old plan in several parts. The council's Local Development Scheme of 2025 lists the saved policies of the 2003 Local Plan, the 2011 Core Strategy, the Housing and Employment Land Allocations plan and the Lincolnshire Lakes Area Action Plan, both of 2016, with neighbourhood plans for Appleby and Worlaby.
- Building ahead of need. The Housing Delivery Test 2025 counted 1,533 homes built over April 2022 to March 2025 against 1,117 required, a result of 137%.
- Heavy industry on the doorstep. The Appleby-Frodingham steelworks in Scunthorpe holds the last working blast furnaces in the UK, kept open since 2025 by a government intervention whose longer-term future was still under consideration when the National Audit Office reported in March 2026.
- Three rivers and an estuary. The Trent, the Ancholme and the Humber shape where homes can go, and a network of pumps and drains keeps much of the low land in the west of the borough dry.
For an owner thinking of selling land in North Lincolnshire, this mix decides most of the early answers: a field near Brigg or Winterton is judged on different ground from one on the Isle of Axholme or beside the estuary, even under the same old plan.
Why the 2022 Plan Was Withdrawn, and What Replaced It
The council submitted a new North Lincolnshire Local Plan, covering 2020 to 2038, for examination on 11 November 2022. It never reached adoption. Its statement of withdrawal records that the cabinet resolved to withdraw it at a meeting held on 30 September 2024, using the power in section 22 of the Planning and Compulsory Purchase Act 2004, and the council's local plan news page records the formal withdrawal from examination on 15 November 2024.
The 2025 Local Development Scheme gives the reason in plain terms: the examination "concluded with a recommendation from the Inspectors" that the council withdraw the plan, in light of a letter from the Minister of State. Local reporting puts the withdrawal down to the changes in national policy of 2024, which raised the housing figures councils plan for.
A Fresh Start, Then a Second Change of Course
The council published a new scheme in March 2025, launched a call for sites in May 2025 and updated its timetable in November 2025. The cabinet report of July 2026 records the work done by then: a call for sites, the "assessment of over 700 sites", "settlement boundary reviews" and a range of technical studies. It explains why the council changed course: "The Government has made clear that North Lincolnshire Council should move into the new plan-making framework at the earliest opportunity and this is not a local decision to delay the Local Plan". At its meeting on 13 July 2026 the cabinet approved the move into the new plan-making system.
The report adds two points that matter to anyone with land here. The evidence already gathered carries across, so the council "will be able to utilise the substantial evidence base already prepared", and the new plan "would carry increased material weight for decision making purposes at Gateway two and beyond". Hits Radio reported that the cabinet also agreed to write to the Secretary of State with its concerns about the higher housing target.
Land that appeared in the 2022 plan carries no status from it now, so an owner whose field was put forward then and who is now thinking of selling should treat the new plan as a fresh hearing, with the council's assessment of those 700 sites as its starting evidence. The settlement boundary reviews deserve as much attention, because where the new line falls around a village decides whether a field beside it is judged as land inside the settlement or outside it.
Five Years of Housing Land, by a Margin of 45 Homes
Because the Core Strategy was adopted more than five years ago, the council measures its housing land against the government's standard method rather than the 2011 figure. Its Five Year Housing Land Supply Statement 2024 to 2029, published in February 2025 under the December 2024 framework, sets the yearly need at 637 homes and concludes that the council "can demonstrate 5 years and approximately 1 month supply" from 1 April 2024. Its own summary table reads:
| Part of the calculation | Council's figure, 2024 to 2029 |
|---|---|
| Yearly need, standard method | 637 homes |
| Basic five-year requirement | 3,185 homes |
| Five-year requirement with a 5% buffer | 3,344 homes |
| Deliverable supply | 3,389 homes |
| Surplus | 45 homes |
| Council's conclusion | 5 years and approximately 1 month |
The 637 comes from the formula that has applied since December 2024, which starts from 0.8% of the borough's 77,196 homes and adjusts for local affordability. The statement adds no separate shortfall for past years, and it applies a 5% buffer because a delivery result of 125% in the 2023 measurement required no more. The council notes that in earlier years it had not needed a buffer at all. The statement gives its result only in years and months; divided out, 3,389 homes against 3,344 comes to 5.07 years, which is our own arithmetic rather than a figure the council publishes.
That is a thin margin against a five-year requirement of 3,344 homes, and the next statement will count a fresh list of sites at a later base date. With a supply above five years and a delivery result of 137%, neither of the usual signs of unmet need under policy S5 of the August 2026 framework is present today. If a later statement showed less than five years, the framework would treat that gap as one piece of evidence of unmet need for the decision-maker to weigh, and it would not settle the question by itself. Inside towns and villages, policy S4 already expects permission unless the harm would substantially outweigh the benefits, whatever the supply.
Where the Homes Have Actually Gone
The monitoring report recorded 510 net new homes in 2022/23 and 494 in 2023/24, well above the 396 a year in the council's needs assessment. It also compares each town's share with what the Core Strategy intended:
| Settlement | Core Strategy share | 2022/23 | 2023/24 |
|---|---|---|---|
| Scunthorpe urban area | 82% | 63% | 52% |
| Brigg | 7% | 6% | 15% |
| Barton-upon-Humber | 6% | 3% | 3% |
| Winterton | 2.3% | 15% | 18% |
| Kirton in Lindsey | 1.5% | 11% | 12% |
| Crowle | 1.2% | 2% | 1% |
Winterton and Kirton in Lindsey have taken many times their planned share, while Scunthorpe has taken far less. If you own land on the edge of one of the market towns and are thinking of selling it for development, that pattern shows where homes have actually been built, and where the next plan will have to decide whether to follow the market or pull growth back to the town.
Selling Land on the Isle of Axholme or Beside the Humber
Flood risk is the constraint that reaches furthest here. The Strategic Flood Risk Assessment of June 2022, prepared for North Lincolnshire and North East Lincolnshire together, describes a borough in which water levels are managed "by using a heavily engineered and complex network of pumps and drains". About half of its study area lies within an internal drainage district, where a drainage board looks after the watercourses and pumps.
The Isle of Axholme
The Isle of Axholme rises to about 35 metres above sea level, and the assessment names Belton, Epworth, Haxey and Upperthorpe as the places it supports, with part of Crowle on "a noticeable high point". Around them lies flat, artificially drained land between the Trent, the Torne and the Idle, its water levels held by pumps. The assessment puts the Trent's tidal defences generally at a 1 in 200 year standard or better. For a field on the Isle, the key line is the edge of the higher ground around each village, because a site that keeps its homes and its access on that ground has a very different case from one on the low drained land below.
The Humber Bank and the Ancholme
The assessment names the Humber estuary itself as a main source of flooding. It notes that the defences between Barton-upon-Humber and New Holland are mostly earth embankments, and that in the flood compartments behind them, around Barton and Goxhill, the defences were "substantially overtopped in many locations" in the tidal surge of December 2013. The same surge brought "major over topping" of the flood banks along the Trent and the Ancholme. The River Ancholme is embanked and drains through a gated outfall at South Ferriby, so land beside it can sit lower than the water it carries.
- Flood Zone 3b, the functional floodplain, is land where water has to flow or be stored in a flood, and the assessment takes land that floods with a 1 in 20 annual chance or more as the starting point for mapping it.
- Flood Zone 3a is land with a 1 in 100 or greater annual chance of river flooding, or a 1 in 200 or greater chance of flooding from the sea, where homes must pass the sequential test and the exception test.
- Climate change matters too: the assessment's own working assumption is that land now in Flood Zone 2 will become Flood Zone 3 over time.
Those tests weigh on the largest allocation too. The Lincolnshire Lakes, the subject of a 2016 Area Action Plan for new village communities and business parks on the land between the western edge of Scunthorpe and the River Trent, had seen no development by March 2024, according to the monitoring report, with the council still working with developers and funders on its exception test strategy and phasing. How a site gets through the sequential test, and what the council asks to see, is set out in our flood risk guide for landowners. For most owners on the Isle or the Humber bank, the flood map answers the first question before anything else is worth paying for, which is why it is the first thing we check, at our cost.
Steel, Jobs and the Homes Planned Around Scunthorpe
Steel still defines Scunthorpe. The National Audit Office, in its investigation of March 2026, records that the government stepped in during 2025 to prevent what it considered "an imminent and disorderly closure" of the Scunthorpe blast furnaces, the last operational ones in the UK. It puts British Steel's permanent workforce at 4,052 on 31 January 2026 and the government's spending on the intervention at £377 million so far, with no clear end date.
The same report found that the intervention "has not stabilised the company's finances", and that a year on the Department for Business and Trade was "considering options for the longer-term future of British Steel". Earlier talks on moving from blast furnaces to electric arc furnaces had produced several rounds of proposals, none of them acceptable to both sides. For owners of land near the works, the future of the site is not yet settled, so a review of such land starts from what the new plan comes to say about the area around it.
For a landowner, the plain point is that jobs and housing are planned together. The next plan starts from the standard method figure of 637 homes a year, which Hits Radio reported as a rise of 77% on the previous target, and the council will have to find room for those homes on land that, as the flood evidence shows, is often low and drained. Hits Radio also reported councillors' continuing concerns about renewable energy policy, which matters to owners of larger farms who are weighing an energy use against a future housing site.
Timing a Sale of Land in North Lincolnshire Around the New Plan's Gateways
The council's plan timetable, first published on 28 July 2026, sets out a single new Local Plan looking ahead to 2045 under the new system. A scoping consultation ran from 4 August to 1 September 2026. The dates after that are the council's and may move:
| Stage in the council's timetable | Date |
|---|---|
| Gateway 1 self-assessment summary published | 30 November 2026 |
| Consultation on proposed content and evidence, six weeks | 28 June to 9 August 2027 |
| Gateway 2, observations and advice | 4 November 2027 |
| Consultation on the Proposed Local Plan, eight weeks | 1 May to 26 June 2028 |
| Gateway 3, readiness for submission | 18 October 2028 |
| Submission for independent examination | 23 November 2028 |
| Consideration of adoption | 30 May 2029 |
An Old Plan, a Thin Margin and an Unsettled Reorganisation
Until a new plan is adopted, the Core Strategy of 2011 stays in force, and a plan of that age has its housing figure replaced by the standard method whenever supply is tested. The statement in force has a base date of 1 April 2024 and a margin of 45 homes, so the council's next statement, counted from a later base date, is the figure to watch. We do not predict what it will show.
The delivery test runs alongside it once a year, and the Housing Delivery Test 2025, published on 17 August 2026, put North Lincolnshire at 137%, clear of every threshold that carries a consequence. Below 95% a council must prepare an action plan, below 85% a 20% buffer is added to its supply, and below 75% policy S5 treats unmet need as evidenced.
Reorganisation is also unsettled. The government's July 2026 decision for Greater Lincolnshire would have created two new unitary councils for the rest of the county while leaving North Lincolnshire as it is. On 29 October 2026 the government withdrew that decision for Lincolnshire, North Lincolnshire and North East Lincolnshire, so that all the proposals submitted in November 2025 can be considered again. West Lindsey District Council reported that reorganisation has not been cancelled, that every area under review has been promised an outcome by early 2027, and that any new councils are expected to take over on 1 April 2029, two months before the date the timetable gives for considering adoption of the new plan. Until a decision is made, North Lincolnshire Council remains the planning authority for the whole borough and the body preparing that plan.
Ahead of the 2027 Consultation on the Plan's Content
- Land inside a town or village can be looked at now, under policy S4 and the old plan, while a field on the edge needs evidence of unmet need under policy S5 or a place in the new plan.
- Larger fields that need an allocation are best prepared before the consultation on content and evidence, which the council's timetable puts from 28 June to 9 August 2027, when the council sets out what the plan will cover.
- Land on the Isle of Axholme or the Humber bank needs its flood position settled first, and that work takes time whichever route it follows.
Our guide to the call for sites and local plans explains how land is carried through a timetable like this one.
Questions About Selling Land in North Lincolnshire
My field was put forward for the 2022 plan. Does the withdrawal mean that work is wasted?
Not entirely, though the old plan gives it no weight now. The council ran a fresh call for sites after the withdrawal and has assessed more than 700 sites for the new plan, so the first step is to confirm the field is among them. After that, what matters is how it fits the new strategy and the flood evidence behind it.
Can land on the Isle of Axholme get permission when so much of it is pumped and drained?
Some can. Epworth, Haxey and part of Crowle stand on higher ground, and a site that keeps its homes and access out of the higher flood zones faces far fewer hurdles than one on the low drained land. We check the flood zone and the drainage board's watercourses before anything else.
Winterton and Kirton in Lindsey have taken far more homes than planned. Will that count against more land there?
It may shape the next plan's choices, and the council could steer growth back towards Scunthorpe. Equally, it shows that homes were completed in those towns in both years the monitoring report covers. A sound site there still needs a clear relationship to the town and safe access, which is where our review starts.
Does the uncertainty at the steelworks make a sale near Scunthorpe a poor idea?
The government intervened in 2025 to prevent the closure of the blast furnaces, and housing need is set nationally by the standard method rather than by one employer. A planning case near Scunthorpe rests on the site, its access and the new plan, more than on the fortunes of any single business.
I have inherited farmland near Brigg. Is it worth doing anything when the council's timetable puts adoption of the new plan in 2029?
Often, yes. The sites a new plan proposes are chosen well before adoption, and the council's timetable puts its consultations in 2027 and 2028, so a site with its evidence ready is in a better position than one that arrives late. Our inherited land page sets out how we work with families and executors.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in North Lincolnshire Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in North Lincolnshire, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in North Lincolnshire? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Lincolnshire
County overview
Selling Land in Lincolnshire
Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 141% of need (joint area)
Selling Land in West Lindsey
Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 244% of need
Selling Land in North East Lincolnshire
Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 127% of need
Selling Land in Boston
Sell land in Boston, near Kirton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 129% of need
Selling Land in East Lindsey
Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 141% of need (joint area)
Selling Land in Lincoln
Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 141% of need (joint area)
Selling Land in North Kesteven
Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 161% of need
Selling Land in South Holland
Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 97% of need
Selling Land in South Kesteven
Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Lincolnshire
- BassetlawNottinghamshire · 5.31 years of housing land
Sources
- North Lincolnshire Council: Statement of withdrawal of the North Lincolnshire Local Plan (September 2024)
- North Lincolnshire Council: Local Development Scheme 2025 to 2027 (February 2025)
- North Lincolnshire Council: Local Plan news (November 2024 to August 2026)
- North Lincolnshire Council: Local Plan Transition, report of the Director: Communities to Cabinet, 13 July 2026 (June 2026)
- North Lincolnshire Council: Local Plan timetable (July 2026)
- North Lincolnshire Council: Five Year Housing Land Supply Statement 2024 to 2029 (February 2025)
- North Lincolnshire Council: Annual Monitoring Report 2023 and 2024
- North Lincolnshire and North East Lincolnshire Councils: Strategic Flood Risk Assessment (June 2022)
- National Audit Office: Investigation into government's intervention in British Steel's Scunthorpe site (March 2026)
- West Lindsey District Council: Government withdraws Lincolnshire LGR decision, 15 areas await further decisions (November 2026)
- Hits Radio: North Lincolnshire Council challenges increased housing target with Government (July 2026)
- Wikipedia: North Lincolnshire
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.