Lincolnshire council area
Selling Land in Boston
Checked on
Boston shares a local plan with South Holland, adopted in March 2019, and the two councils have begun a joint replacement under the new plan-making system. The council's own count puts its five-year supply at 4.8 years, and much of the borough is at significant risk of flooding, so the village a site adjoins and how deep water would stand in a breach decide most of what follows.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Boston and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Boston can show 4.8 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from March 2019, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Boston
- Fields on the edges of Boston, Wyberton and Fishtoft, the borough's Sub-Regional Centre.
- Land beside Kirton, Sutterton or Swineshead, the main service centres.
- Plots, yards and former farm buildings inside village boundaries.
- Reserve sites named in Policy 12 of the 2019 plan.
- Larger holdings to put forward to the new joint plan.
Our farmland page shows how we approach fields like those around Boston. We agree the price when the option is signed, above the land's value as farmland today, and fund every survey, flood model and application at our own risk. You go on farming until completion; if permission is refused, you keep the land and owe us nothing.
Is Your Land in Boston a Good Fit?
You do not need to know the planning rules to sell land for development in Boston. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Boston
There are three common ways to sell land with development potential in Boston. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Boston: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Boston and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Boston
Three things shape the chances of selling land for development in Boston: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
127%
Meeting its housing requirement.
Five-year housing land supply
4.8 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2026, measured against the standard method, 356 homes a year, with the shortfall since 2011 spread by the Liverpool method, plus a 5% buffer. Stated by Boston Borough Council.
Checked sourceHomes built against homes needed
966
of 761 needed, April 2022 to March 2025
Most recent strategic plan adopted
March 2019
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
Work on a new Joint Local Plan for Boston and South Holland was endorsed in May 2026. The project initiation document's indicative timetable puts the notice of intention in December 2026, consultation on the vision and strategy from July to September 2027, submission from January to April 2029 and adoption in October 2029. A report on the weight given to reserve sites Policy 12 is scheduled for the joint committee on 10 November 2026
Checked source
See how Boston compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A Port Town and Its Farming Villages Beside the Wash
Boston Borough Council covers about 364 square kilometres of south east Lincolnshire, from the town of Boston and its suburbs at Wyberton and Fishtoft out to a coastline on the Wash. Around 64,600 people lived in the borough in 2024. Kirton is its only other town; the rest is farmland and villages such as Sutterton, Swineshead, Old Leake and Wrangle.
- A working port. The adopted plan calls the Port of Boston one of the borough's major employers.
- Farmland of national weight. The plan calls the area's contribution to food security significant and sets out to protect its high quality agricultural land.
- A protected coast. The plan's assessment found a risk to the Wash and Gibraltar Point Special Protection Areas from recreational disturbance caused by new homes.
The South East Lincolnshire Local Plan 2011 to 2036 was produced by a joint committee of Boston, South Holland and Lincolnshire County Council, and covers Boston and South Holland only. Boston Borough Council still decides planning applications itself.
Where the 2019 Plan Lets a Boston Village Grow
Policy 1 sorts every settlement into a tier, and the tier sets what each can take inside its settlement boundary.
| Tier in Policy 1 | Settlements in Boston Borough | What the plan normally allows |
|---|---|---|
| Sub-Regional Centre | Boston, including parts of Fishtoft and Wyberton parishes | Development that supports its role as a Sub-Regional Centre |
| Main Service Centres | Kirton (with part of Frampton parish), Sutterton, Swineshead | Development that supports the village as a service centre or sustains its facilities |
| Minor Service Centres | Bicker, Butterwick, Fishtoft, Old Leake, Wigtoft, Wrangle | Allocated and committed sites and infill |
| Other Service Centres and Settlements | Eighteen smaller places, among them Algarkirk, Benington, Fosdyke, Freiston and Hubbert's Bridge | Committed sites and infill |
| Countryside | Land outside every settlement boundary | Only what must be in the countryside, or brings economic, community or environmental benefits |
Inside a boundary, policy S4 of the August 2026 national framework expects approval unless the adverse effects of a scheme would substantially outweigh what it brings. Beyond it, the countryside wording applies and policy S5 is the national route, which the supply section below turns to.
For an owner in Boston, the tier of the nearest settlement and the line of its boundary are the first two facts that tell us what a site could become: a field beside Kirton or Swineshead starts from a stronger position than one beside Wrangle or Freiston.
Tidal Flood Risk, the Haven Banks and the Boston Barrier
The plan says much of its area is at significant risk of flooding, a risk that will increase with climate change, and in Boston the sea matters as much as rain. A tidal surge on 5 December 2013 flooded more than 800 properties across the town. The Environment Agency's Boston Barrier, fully operational since December 2020 with funding of more than £100 million, can be raised in 20 minutes, and the agency says the gate and its flood walls better protect more than 13,500 properties. Policy 4 still allows no development within 50 metres of the toe of the raised Witham Haven Banks, to keep access for the defences.
How Policy 4 Tests a Site
- The search area. The sequential test for a site that is not allocated searches the whole borough for alternative sites inside settlement boundaries, unless local circumstances justify a narrower catchment.
- The breach level. Proposals in Flood Zones 2 and 3, or at risk if a defence is breached or overtopped, must identify the predicted flood level in that event and show how the homes will be made safe.
- Hazard to people. Ground floor homes made by a change of use are not supported where the hazard is mapped as danger for some, most or all, unless there is a habitable room above the flood level and an emergency evacuation plan.
Allocated sites, minor development and most changes of use do not face the sequential test, one reason a small plot can be easier to take forward than a large field. Our flood risk guide explains the tests.
For someone selling farmland near Boston, the useful question is rarely whether the land floods on the Environment Agency map, since much of the borough does, but how deep water would stand if a bank failed and whether homes can sit above it.
Ahead on Delivery, Short on Five-Year Supply
At 127% in the Housing Delivery Test 2025, Boston is clear of every consequence of the government's delivery test, from the action plan required under 95% to the 20% buffer under 85% and, under 75%, unmet need being treated as evidenced for policy S5. Its land supply tells a different story. The council's statement at 31 March 2026 finds 4.8 years, measured against the standard method, 356 homes a year, with the shortfall since 2011 spread by the Liverpool method, plus a 5% buffer, and concludes there are insufficient deliverable sites to meet requirements to March 2031.
The plan turned five on 8 March 2024. The joint committee had completed its five-year review and found no requirement to update the plan at that time, but the statement explains that national policy changes and the new standard method mean supply is now tested against 356 homes a year.
| Part of the calculation | Homes |
|---|---|
| Standard method, 356 a year for five years | 1,780 |
| Shortfall since 2011, half counted in these five years | 317 |
| 5% buffer | 105 |
| Five-year requirement | 2,202 |
| Sites under construction | 1,075 |
| Full permissions not started, less 10% for lapses | 618 |
| Outline permissions, less 10% | 126 |
| Allocated site with permission subject to a Section 106 agreement | 93 |
| Windfall allowance, 43 a year | 215 |
| Deliverable supply | 2,127 |
| Shortfall | 75 |
From 2011 to 2026 the borough built 4,108 homes net against 4,742 required, with most of the 634-home gap built up before 2016; completions reached 410 in 2025 to 2026. The council spreads it over the rest of the plan period by the Liverpool method, because the plan's provision is back-loaded.
For a field just outside Kirton, Sutterton or Swineshead, that 75-home gap is what opens policy S5: evidence of unmet need, to be weighed with flood risk, access and drainage rather than treated as a finding, on land well related to the village and served by roads, schools and drainage with capacity.
Thirteen Reserve Sites and a November 2026 Report
Policy 12 holds 13 reserve sites for housing across Boston and South Holland, with release triggered by each council's Housing Delivery Test result; both councils have performed well against the test, so no release has been required. A report prepared for the joint committee's meeting scheduled for 10 November 2026 points out that the reserve sites lie within settlement boundaries, so policy S4 is relevant to them, and that neither council can currently demonstrate a five-year supply. It recommends the committee note that Policy 12 remains part of the adopted plan, but that its timing restriction be given very limited weight insofar as it is materially inconsistent with policy S4. The report does not amend the policy, release the sites or predetermine any application. If you own a reserve site in the Boston half of the plan area, what the committee does with it could change when an application is worth making.
What Boston's Planning Committee Decided in May 2025
On 6 May 2025 Boston's planning committee approved two schemes totalling 231 homes, 142 off Puritan Way and 89 east of Gaysfield Road, Fishtoft, and refused 102 homes next to White House Lane in Fishtoft over density and fit with the homes around them.
- Flood Zone 3 was not a reason to refuse. A councillor noted the Gaysfield Road site lies in Flood Zone 3, but accepted this was not enough, as Anglian Water had raised no objection on foul water.
- Officers' advice turned the vote. After Fishtoft Parish Council objected and a first vote to back the scheme fell, officers advised there were no defensible grounds for refusal likely to hold up at appeal, and a second vote approved it.
For land on the edge of Fishtoft or Wyberton, a well drained scheme of the right density can carry the day even in Flood Zone 3. The layout is where a case is won or lost, and that is work we pay for in full.
The Joint Plan Timetable for Boston and South Holland
On 27 May 2026 the joint committee was asked to endorse the start of work on the next joint plan for the two councils, under a system that compresses plan production into a mandatory 30-month period, and to work to a notice of intention no later than December 2026, the latest date the government allows. East Lindsey is preparing its own, separate plan. Because the joint committee was formed by statutory instrument, the Secretary of State, not the two full councils, has the final say on adopting the plan.
The Stages in the Project Initiation Document
| Stage | Indicative dates |
|---|---|
| Notice of intention to start plan-making | December 2026 |
| Gateway 1 self-assessment and start of plan-making | January to April 2027 |
| Public consultation on the vision and strategy | July to September 2027 |
| Eight-week public consultation on the draft plan | March to April 2028 |
| Submission of the plan | January to April 2029 |
| Independent examination | August to September 2029 |
| Adoption | October 2029 |
The same project initiation document set the call for sites and initial site assessment for May to June 2026, after the joint planning unit's call for sites page had asked for submissions before 31 March 2026 and suggested owners bear the settlement hierarchy in mind when choosing what size of site to put forward. Our call for sites guide explains how a submission is judged.
Reserve Sites, Edge Fields and the First Consultation
The joint committee is scheduled to consider the reserve sites report on 10 November 2026. The council publishes a supply statement each year at a 31 March base date, and the Housing Delivery Test follows the Housing Delivery Test 2025, published on 17 August 2026. The government's letter of 29 October 2026, which withdrew its July decision on new unitary councils for Lincolnshire while every proposal is considered again, said that the borough's May 2027 elections would still be held for the existing council, so Boston Borough Council remains the planning authority meanwhile.
- Reserve sites depend on how the committee treats the November 2026 report.
- Fields just beyond a boundary can be considered now, while supply stands below five years.
- Larger holdings are best prepared for the first consultation, with flood and drainage evidence in hand.
Questions About Selling Land in Boston
My land is in Flood Zone 3 outside Boston. Can it still be worth putting forward?
It can. In May 2025 the council approved 89 homes at Fishtoft on land in Flood Zone 3. The depth of water in a breach, the hazard rating and the distance from the Haven banks matter more than the zone alone.
Does the Boston Barrier mean flood risk no longer counts against my field?
No. The barrier greatly reduces tidal risk to the town, but the plan still asks every site at risk to show the flood level if a defence were breached and how the homes would be made safe.
I own one of the reserve sites in the local plan. Why has nothing happened?
Policy 12 ties release to each council's Housing Delivery Test result, and both Boston and South Holland have performed well against it. A report prepared for the joint committee's meeting on 10 November 2026 recommends giving the timing rule very limited weight so far as it conflicts with national policy S4, since the reserve sites lie within settlement boundaries.
My village is Wrangle, not Kirton. Does that change what my land could take?
Yes. Wrangle is a minor service centre, limited mainly to allocated and committed sites and infill, while Kirton is a main service centre. Beyond Wrangle's boundary the supply shortfall is still evidence to weigh under policy S5, but the new joint plan may be the stronger route.
Should I wait for the new Boston and South Holland plan before doing anything?
Not for a plot inside a settlement boundary, which policy S4 supports, nor for a field beside a main service centre while supply is below five years. For a larger holding the new plan is the main route, and its evidence takes time to gather; our page on how long planning takes sets out the stages.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Boston Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Boston stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Boston? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Lincolnshire
County overview
Selling Land in Lincolnshire
Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 129% of need
Selling Land in East Lindsey
Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 141% of need (joint area)
Selling Land in North Kesteven
Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 161% of need
Selling Land in South Holland
Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 141% of need (joint area)
Selling Land in Lincoln
Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 97% of need
Selling Land in South Kesteven
Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 141% of need (joint area)
Selling Land in West Lindsey
Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 137% of need
Selling Land in North Lincolnshire
Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 244% of need
Selling Land in North East Lincolnshire
Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- South East Lincolnshire Joint Strategic Planning Committee: South East Lincolnshire Local Plan 2011 to 2036 (March 2019)
- Boston Borough Council: Five year land supply at 31st March 2026
- Boston Borough Council: South East Lincolnshire Local Plan Review, Joint Strategic Planning Committee item 7
- South East Lincolnshire Joint Planning Unit: Call for Sites (2026)
- Boston Borough Council: Joint Local Plan for Boston Borough Council and South Holland District Council, report to the Joint Strategic Planning Committee (May 2026)
- South Holland District Council: Joint Local Plan, Appendix 2, Project Initiation Document V1 (April 2026)
- South Holland District Council: Reserve Sites Policy in the South East Lincolnshire Local Plan, report to the Joint Strategic Planning Committee (November 2026)
- Environment Agency: Boston Barrier flood gate fully operational (December 2020)
- Environment Agency: Boston Barrier
- Lincolnshire Free Press: Plans for 231 homes passed but 102 more turned down (May 2025)
- MHCLG: Local government reorganisation, withdrawn letter to 9 areas (October 2026)
- Wikipedia: Borough of Boston
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.