Skip to content

We pay for the planning.

Call us:020 3953 5635

Lincolnshire council area

Selling Land in Boston

Checked on

Boston shares a local plan with South Holland, adopted in March 2019, and the two councils have begun a joint replacement under the new plan-making system. The council's own count puts its five-year supply at 4.8 years, and much of the borough is at significant risk of flooding, so the village a site adjoins and how deep water would stand in a breach decide most of what follows.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Boston and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Boston can show 4.8 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from March 2019, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Boston

  • Fields on the edges of Boston, Wyberton and Fishtoft, the borough's Sub-Regional Centre.
  • Land beside Kirton, Sutterton or Swineshead, the main service centres.
  • Plots, yards and former farm buildings inside village boundaries.
  • Reserve sites named in Policy 12 of the 2019 plan.
  • Larger holdings to put forward to the new joint plan.

Our farmland page shows how we approach fields like those around Boston. We agree the price when the option is signed, above the land's value as farmland today, and fund every survey, flood model and application at our own risk. You go on farming until completion; if permission is refused, you keep the land and owe us nothing.

Is Your Land in Boston a Good Fit?

You do not need to know the planning rules to sell land for development in Boston. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Boston

There are three common ways to sell land with development potential in Boston. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Boston: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Boston and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Boston

Three things shape the chances of selling land for development in Boston: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    127%

    Meeting its housing requirement.

  • Five-year housing land supply

    4.8 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2026, measured against the standard method, 356 homes a year, with the shortfall since 2011 spread by the Liverpool method, plus a 5% buffer. Stated by Boston Borough Council.

    Checked source
  • Homes built against homes needed

    966

    of 761 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    March 2019

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    Work on a new Joint Local Plan for Boston and South Holland was endorsed in May 2026. The project initiation document's indicative timetable puts the notice of intention in December 2026, consultation on the vision and strategy from July to September 2027, submission from January to April 2029 and adoption in October 2029. A report on the weight given to reserve sites Policy 12 is scheduled for the joint committee on 10 November 2026

    Checked source

See how Boston compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

A Port Town and Its Farming Villages Beside the Wash

Boston Borough Council covers about 364 square kilometres of south east Lincolnshire, from the town of Boston and its suburbs at Wyberton and Fishtoft out to a coastline on the Wash. Around 64,600 people lived in the borough in 2024. Kirton is its only other town; the rest is farmland and villages such as Sutterton, Swineshead, Old Leake and Wrangle.

  • A working port. The adopted plan calls the Port of Boston one of the borough's major employers.
  • Farmland of national weight. The plan calls the area's contribution to food security significant and sets out to protect its high quality agricultural land.
  • A protected coast. The plan's assessment found a risk to the Wash and Gibraltar Point Special Protection Areas from recreational disturbance caused by new homes.

The South East Lincolnshire Local Plan 2011 to 2036 was produced by a joint committee of Boston, South Holland and Lincolnshire County Council, and covers Boston and South Holland only. Boston Borough Council still decides planning applications itself.

Where the 2019 Plan Lets a Boston Village Grow

Policy 1 sorts every settlement into a tier, and the tier sets what each can take inside its settlement boundary.

Settlement tiers as set out for Boston Borough in Policy 1 of the adopted plan.
Tier in Policy 1Settlements in Boston BoroughWhat the plan normally allows
Sub-Regional CentreBoston, including parts of Fishtoft and Wyberton parishesDevelopment that supports its role as a Sub-Regional Centre
Main Service CentresKirton (with part of Frampton parish), Sutterton, SwinesheadDevelopment that supports the village as a service centre or sustains its facilities
Minor Service CentresBicker, Butterwick, Fishtoft, Old Leake, Wigtoft, WrangleAllocated and committed sites and infill
Other Service Centres and SettlementsEighteen smaller places, among them Algarkirk, Benington, Fosdyke, Freiston and Hubbert's BridgeCommitted sites and infill
CountrysideLand outside every settlement boundaryOnly what must be in the countryside, or brings economic, community or environmental benefits

Inside a boundary, policy S4 of the August 2026 national framework expects approval unless the adverse effects of a scheme would substantially outweigh what it brings. Beyond it, the countryside wording applies and policy S5 is the national route, which the supply section below turns to.

For an owner in Boston, the tier of the nearest settlement and the line of its boundary are the first two facts that tell us what a site could become: a field beside Kirton or Swineshead starts from a stronger position than one beside Wrangle or Freiston.

Tidal Flood Risk, the Haven Banks and the Boston Barrier

The plan says much of its area is at significant risk of flooding, a risk that will increase with climate change, and in Boston the sea matters as much as rain. A tidal surge on 5 December 2013 flooded more than 800 properties across the town. The Environment Agency's Boston Barrier, fully operational since December 2020 with funding of more than £100 million, can be raised in 20 minutes, and the agency says the gate and its flood walls better protect more than 13,500 properties. Policy 4 still allows no development within 50 metres of the toe of the raised Witham Haven Banks, to keep access for the defences.

How Policy 4 Tests a Site

  • The search area. The sequential test for a site that is not allocated searches the whole borough for alternative sites inside settlement boundaries, unless local circumstances justify a narrower catchment.
  • The breach level. Proposals in Flood Zones 2 and 3, or at risk if a defence is breached or overtopped, must identify the predicted flood level in that event and show how the homes will be made safe.
  • Hazard to people. Ground floor homes made by a change of use are not supported where the hazard is mapped as danger for some, most or all, unless there is a habitable room above the flood level and an emergency evacuation plan.

Allocated sites, minor development and most changes of use do not face the sequential test, one reason a small plot can be easier to take forward than a large field. Our flood risk guide explains the tests.

For someone selling farmland near Boston, the useful question is rarely whether the land floods on the Environment Agency map, since much of the borough does, but how deep water would stand if a bank failed and whether homes can sit above it.

Ahead on Delivery, Short on Five-Year Supply

At 127% in the Housing Delivery Test 2025, Boston is clear of every consequence of the government's delivery test, from the action plan required under 95% to the 20% buffer under 85% and, under 75%, unmet need being treated as evidenced for policy S5. Its land supply tells a different story. The council's statement at 31 March 2026 finds 4.8 years, measured against the standard method, 356 homes a year, with the shortfall since 2011 spread by the Liverpool method, plus a 5% buffer, and concludes there are insufficient deliverable sites to meet requirements to March 2031.

The plan turned five on 8 March 2024. The joint committee had completed its five-year review and found no requirement to update the plan at that time, but the statement explains that national policy changes and the new standard method mean supply is now tested against 356 homes a year.

Source: Boston Borough Council, Five year land supply at 31st March 2026, Tables 3, 5 and 6. Brownfield register sites are counted at nil, for lack of clear evidence they will start within five years.
Part of the calculationHomes
Standard method, 356 a year for five years1,780
Shortfall since 2011, half counted in these five years317
5% buffer105
Five-year requirement2,202
Sites under construction1,075
Full permissions not started, less 10% for lapses618
Outline permissions, less 10%126
Allocated site with permission subject to a Section 106 agreement93
Windfall allowance, 43 a year215
Deliverable supply2,127
Shortfall75

From 2011 to 2026 the borough built 4,108 homes net against 4,742 required, with most of the 634-home gap built up before 2016; completions reached 410 in 2025 to 2026. The council spreads it over the rest of the plan period by the Liverpool method, because the plan's provision is back-loaded.

For a field just outside Kirton, Sutterton or Swineshead, that 75-home gap is what opens policy S5: evidence of unmet need, to be weighed with flood risk, access and drainage rather than treated as a finding, on land well related to the village and served by roads, schools and drainage with capacity.

Thirteen Reserve Sites and a November 2026 Report

Policy 12 holds 13 reserve sites for housing across Boston and South Holland, with release triggered by each council's Housing Delivery Test result; both councils have performed well against the test, so no release has been required. A report prepared for the joint committee's meeting scheduled for 10 November 2026 points out that the reserve sites lie within settlement boundaries, so policy S4 is relevant to them, and that neither council can currently demonstrate a five-year supply. It recommends the committee note that Policy 12 remains part of the adopted plan, but that its timing restriction be given very limited weight insofar as it is materially inconsistent with policy S4. The report does not amend the policy, release the sites or predetermine any application. If you own a reserve site in the Boston half of the plan area, what the committee does with it could change when an application is worth making.

What Boston's Planning Committee Decided in May 2025

On 6 May 2025 Boston's planning committee approved two schemes totalling 231 homes, 142 off Puritan Way and 89 east of Gaysfield Road, Fishtoft, and refused 102 homes next to White House Lane in Fishtoft over density and fit with the homes around them.

  • Flood Zone 3 was not a reason to refuse. A councillor noted the Gaysfield Road site lies in Flood Zone 3, but accepted this was not enough, as Anglian Water had raised no objection on foul water.
  • Officers' advice turned the vote. After Fishtoft Parish Council objected and a first vote to back the scheme fell, officers advised there were no defensible grounds for refusal likely to hold up at appeal, and a second vote approved it.

For land on the edge of Fishtoft or Wyberton, a well drained scheme of the right density can carry the day even in Flood Zone 3. The layout is where a case is won or lost, and that is work we pay for in full.

The Joint Plan Timetable for Boston and South Holland

On 27 May 2026 the joint committee was asked to endorse the start of work on the next joint plan for the two councils, under a system that compresses plan production into a mandatory 30-month period, and to work to a notice of intention no later than December 2026, the latest date the government allows. East Lindsey is preparing its own, separate plan. Because the joint committee was formed by statutory instrument, the Secretary of State, not the two full councils, has the final say on adopting the plan.

The Stages in the Project Initiation Document

Source: South East Lincolnshire Joint Strategic Planning Committee, Project Initiation Document V1 (April 2026), plan summary timeline. The dates are indicative.
StageIndicative dates
Notice of intention to start plan-makingDecember 2026
Gateway 1 self-assessment and start of plan-makingJanuary to April 2027
Public consultation on the vision and strategyJuly to September 2027
Eight-week public consultation on the draft planMarch to April 2028
Submission of the planJanuary to April 2029
Independent examinationAugust to September 2029
AdoptionOctober 2029

The same project initiation document set the call for sites and initial site assessment for May to June 2026, after the joint planning unit's call for sites page had asked for submissions before 31 March 2026 and suggested owners bear the settlement hierarchy in mind when choosing what size of site to put forward. Our call for sites guide explains how a submission is judged.

Reserve Sites, Edge Fields and the First Consultation

The joint committee is scheduled to consider the reserve sites report on 10 November 2026. The council publishes a supply statement each year at a 31 March base date, and the Housing Delivery Test follows the Housing Delivery Test 2025, published on 17 August 2026. The government's letter of 29 October 2026, which withdrew its July decision on new unitary councils for Lincolnshire while every proposal is considered again, said that the borough's May 2027 elections would still be held for the existing council, so Boston Borough Council remains the planning authority meanwhile.

  • Reserve sites depend on how the committee treats the November 2026 report.
  • Fields just beyond a boundary can be considered now, while supply stands below five years.
  • Larger holdings are best prepared for the first consultation, with flood and drainage evidence in hand.

Questions About Selling Land in Boston

My land is in Flood Zone 3 outside Boston. Can it still be worth putting forward?

It can. In May 2025 the council approved 89 homes at Fishtoft on land in Flood Zone 3. The depth of water in a breach, the hazard rating and the distance from the Haven banks matter more than the zone alone.

Does the Boston Barrier mean flood risk no longer counts against my field?

No. The barrier greatly reduces tidal risk to the town, but the plan still asks every site at risk to show the flood level if a defence were breached and how the homes would be made safe.

I own one of the reserve sites in the local plan. Why has nothing happened?

Policy 12 ties release to each council's Housing Delivery Test result, and both Boston and South Holland have performed well against it. A report prepared for the joint committee's meeting on 10 November 2026 recommends giving the timing rule very limited weight so far as it conflicts with national policy S4, since the reserve sites lie within settlement boundaries.

My village is Wrangle, not Kirton. Does that change what my land could take?

Yes. Wrangle is a minor service centre, limited mainly to allocated and committed sites and infill, while Kirton is a main service centre. Beyond Wrangle's boundary the supply shortfall is still evidence to weigh under policy S5, but the new joint plan may be the stronger route.

Should I wait for the new Boston and South Holland plan before doing anything?

Not for a plot inside a settlement boundary, which policy S4 supports, nor for a field beside a main service centre while supply is below five years. For a larger holding the new plan is the main route, and its evidence takes time to gather; our page on how long planning takes sets out the stages.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Boston Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Boston stands on housing shapes which matter most here.

Selling Land in Boston? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Lincolnshire

  • County overview

    Selling Land in Lincolnshire

    Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 129% of need

    Selling Land in East Lindsey

    Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in North Kesteven

    Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 161% of need

    Selling Land in South Holland

    Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 141% of need (joint area)

    Selling Land in Lincoln

    Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 97% of need

    Selling Land in South Kesteven

    Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 141% of need (joint area)

    Selling Land in West Lindsey

    Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in North Lincolnshire

    Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 244% of need

    Selling Land in North East Lincolnshire

    Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.