Skip to content

We pay for the planning.

Call us:020 3953 5635

Lincolnshire council area

Selling Land in East Lindsey

Checked on

East Lindsey runs from the Lincolnshire Wolds to the North Sea, with a local plan adopted in July 2018 that steers most new housing inland because so much of the coast is at risk of tidal flooding. That plan has passed five years, the yardstick for land supply has changed, and the council's own count for the position to 30 June 2026 finds only 2.33 years, which gives a well placed field beside Louth, Alford, Spilsby or the inland villages a stronger footing than the delivery figures alone suggest.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in East Lindsey and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

East Lindsey can show 2.33 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from July 2018, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in East Lindsey

  • Fields next to the developed edge of Louth, Horncastle, Alford, Spilsby, Coningsby, Woodhall Spa or a large village, outside the Coastal Zone.
  • Land that can be joined to the town by a footpath and reached by a safe road access.
  • Larger farm holdings inland where part of the land could carry homes and the rest open space or biodiversity gain.
  • Former yards, depots and redundant farm buildings in the villages, including barns that could be converted.
  • Inherited land on the edge of an inland town, where a family wants the planning question settled before deciding what to do.

Land inside the Coastal Zone and open fields deep in the Wolds face the hardest tests, and we will say so after the first look. Where a site is worth taking forward we pay for the flood, landscape, ecology and highways work under an option at a price agreed at the start. Our page on selling farmland sets out how we look at larger holdings.

Is Your Land in East Lindsey a Good Fit?

You do not need to know the planning rules to sell land for development in East Lindsey. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in East Lindsey

There are three common ways to sell land with development potential in East Lindsey. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in East Lindsey: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in East Lindsey and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in East Lindsey

Three things shape the chances of selling land for development in East Lindsey: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    129%

    Meeting its housing requirement.

  • Five-year housing land supply

    2.33 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 30 June 2026, measured against the standard method, 1,009 homes a year in the Local Plan trajectory from 2024/25, plus the shortfall since 2017, with a 20% buffer added from 1 July 2026. Stated by East Lindsey District Council.

    Checked source
  • Homes built against homes needed

    1,717

    of 1,335 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    July 2018

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    The council ran a Regulation 18 issues and options consultation and call for land from 15 February to 12 April 2021. Its review page still shows that as the latest stage, and no revised timetable had been published by 4 November 2026

    Checked source

See how East Lindsey compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Between the Wolds and a North Sea Coast at Flood Risk

East Lindsey District Council covers a large rural district of about 1,760 square kilometres, with an estimated 145,183 residents in 2024, and is run from Horncastle. Louth lies in the north, Horncastle, Spilsby and Alford serve the middle of the district, and Skegness, the largest town, with Mablethorpe and Sutton on Sea, makes up the holiday coast. Coningsby with Tattershall is the remaining town in the plan's top tier, while Woodhall Spa, Wainfleet All Saints, Burgh le Marsh and Wragby sit among its large villages.

  • The Wolds. The Lincolnshire Wolds, designated an Area of Outstanding Natural Beauty in 1973 and now known as the Lincolnshire Wolds National Landscape, take in the north west of the district.
  • A coast at risk. The adopted Core Strategy records that 38% of the district lies in an area of high coastal flood risk, which the plan calls the Coastal Zone.
  • One railway. The Poacher Line links Skegness with Nottingham by way of Boston and Grantham.

A field on the edge of an inland town, a plot in a coastal village and a paddock in the Wolds face quite separate tests, so the first question we ask about land here is which of the three it belongs to.

Why the Council Cannot Show Five Years of Land

The Core Strategy set a housing requirement of 7,819 homes for 2017 to 2031, at 558 homes a year after the first year. Because the plan has passed five years, supply is now tested against the standard method, the government's formula for local housing need, and the council's trajectory runs at 1,009 homes a year from 2024/25. Its five-year supply statement for the position to 30 June 2026 works the sum through:

Source: East Lindsey District Council, Five Year Housing Supply, position to 30 June 2026, boxes 1 to 7.
Step in the council's calculationHomes
Five years at 1,009 homes a year5,045
Shortfall since April 2017, added in full1,171
20% buffer, worked on the five years alone1,009
Five-year requirement with the buffer7,225
Deliverable homes: allocations 1,176, inland permissions 1,734, coastal permissions 4543,364
Result2.33 years

The shortfall is the gap between the 6,183 homes the trajectory asked for from April 2017 to June 2026 and the 5,012 actually built. The council loads all of it into the next five years, under the Sedgefield approach, and counts only 3,364 of the 5,751 homes allocated or permitted as deliverable in that time.

Where the 20% Buffer Comes From

A buffer is extra land added on top of the five years, usually 5%. The council has raised it to 20% from 1 July 2026, reasoning that the December 2024 framework calls for one where a plan's requirement is more than five years old and below 80% of the standard method figure; 558 homes is about 55% of 1,009. The framework's own wording aims that rule at requirements adopted within the past five years after examination under a pre-December 2024 version, so for a 2018 plan the higher buffer rests on the council's reading. The conclusion holds either way: with the ordinary 5% buffer, the same statement gives 2.60 years.

The figure has fallen steadily: the council claimed 5.42 years when an outline application at Tothby Lane, Alford was refused in December 2018, and its February 2025 assessment, as an applicant's statement records it, gave 3.08 years with a 5% buffer.

How Much Weight the Shortfall Carries

Policy S5 in the August 2026 framework opens land beyond a town or village's limits to housing when three things line up: evidenced unmet need, a site that sits well with the settlement, and infrastructure to serve it. A supply shortfall is evidence of that need for the decision maker to weigh against any harm; it does not decide the case on its own. With a delivery result of 129%, the supply position is what carries the argument here.

For anyone selling farm land to developers near an inland town, that is the opening: the council's own sums show the 2018 allocations falling well short, and a field that sits naturally against Louth, Alford or Spilsby, clear of the Coastal Zone, now meets a shortfall the council itself has measured.

Louth Leads the Inland Allocations, and Horncastle Was Given None

The Core Strategy sets the policies and the Settlement Proposals document allocates the sites. Policy SP3 requires at least 6,562 of the homes to be built inland. At adoption the Gainsborough Standard reported that Louth had been allocated 1,204 homes, Coningsby and Tattershall 417, Woodhall Spa 312, Mareham le Fen 113 and Wragby 32, all as minimums. Horncastle received none, because more than 800 homes there already had permission.

Windfall Land on the Edge of a Town

Beyond the allocations, clause 4 of policy SP3 supports housing on windfall sites in the towns and large villages, inside the settlement or immediately next to its developed footprint. To count as an appropriate location, the development must:

  • Keep the core shape and form of the settlement.
  • Avoid significant harm to the settlement's character and appearance.
  • Avoid significant harm to the surrounding countryside or the settlement's rural setting.
  • Be connected to the settlement by a footpath.

In the inland medium and small villages, policy SP4 is narrower: infill or frontage plots of no more than two homes within the developed footprint, and the conversion of brownfield sites or disused farm buildings after twelve months of marketing for other uses. Policy SP8 adds rural exception sites for affordable homes where local need is proven.

So a field touching the edge of Louth, Alford, Spilsby or a large village already has a policy written for it, and the shortfall adds weight on top. Land beside a small village is a harder sale for development, though a single plot or a barn may still have a route.

Selling Land Near the Coast: The Coastal Zone and Its Limits on New Homes

The Core Strategy defines the Coastal Zone as the area covered by the Environment Agency's Coastal Flood Hazard Map, and concludes that large scale housing growth there is not realistic. It also treats the whole of each of these settlements as inside the zone:

  • The resort towns. Skegness, Mablethorpe, Sutton on Sea and Trusthorpe.
  • The holiday villages. Chapel St Leonards, Ingoldmells, Addlethorpe and Anderby.
  • The northern marsh. The Somercotes, North Cotes, Skidbrooke with Saltfleet Haven, the three Saltfleetby parishes and the two Theddlethorpes.
  • Inland of Skegness. Croft and New Leake.

Policy SP3 limits coastal housing to the roughly 1,257 homes already committed, with exceptions under policies SP18, SP8 (rural exception sites) and SP9 (single plots), and the Settlement Proposals document for the coast allocates no housing sites in its towns and large villages.

How Seriously the Hazard Map Is Applied

The map grades land from danger for all down to low hazard. In January 2022 the Secretary of State refused two called in caravan schemes, 18 static pitches at Hogsthorpe and 189 static caravans at Skegness Water Leisure Park, and was minded to refuse a third at Sutton on Sea. Each failed the first part of the Exception Test and conflicted with policy SP17, and none had been shown to be safe for its lifetime over the longer season proposed.

For an owner here, the honest position is that new homes on coastal land are rare, and our flood risk guide explains why the hazard bands matter so much. The plan gives strong support to tourism, business and employment uses on the coast, so coastal land still has routes; they are simply not usually housing.

Fields Beside the Lincolnshire Wolds National Landscape

The Wolds cover 558 square kilometres, and three councils decide planning applications within them: East Lindsey, West Lindsey and North East Lincolnshire. The Lincolnshire Wolds Countryside Service reviews applications in or affecting the designation, and it and Natural England are often asked to comment.

  1. Inside the boundary. Clause 5 of policy SP3 places great weight on conserving the landscape and scenic beauty of the Wolds and supports major development only in exceptional circumstances.
  2. A stronger duty. Since 26 December 2023 the council has had to seek to further the purpose of conserving and enhancing the area's natural beauty.
  3. Outside it, but in view. Larger proposals beyond the boundary can still be judged on their effect on the setting of the Wolds and on views to and from them.

Alford, Close to the Edge

Tothby Lane shows how this plays out: a single field of about 9.92 hectares, roughly 1.25 kilometres from the National Landscape, in the plan's Inland zone and at the lowest level of river flood risk. An earlier outline application was refused in December 2018, against the officers' recommendation, for its effect on the character and appearance of the area. The 2025 application for up to 200 homes returned with the supply position at its centre.

Where a field lies within sight of the Wolds, we commission the landscape assessment early and design around the views before an application is shaped.

A Review That Has Not Moved Past Issues and Options

The Core Strategy promised a full review of its housing policies, to be submitted for examination by April 2022. The council ran an issues and options consultation and a call for land from 15 February to 12 April 2021, as a partial review, and its Local Plan Review page still gives that Regulation 18 stage as the latest.

In 2024 officers told the Planning Policy Committee that the plan was unlikely to reach the Regulation 19 stage by the end of that year, that the current plan remained fit for purpose, and that work was aimed at the government's December 2026 target. Members asked for a revised Local Development Scheme setting out a programme for the review. The council still accepts site submissions through its call for land form, so the plan route stays open for land that needs an allocation, while the shortfall lets a well placed site be tested by application now.

Timing a Sale of Land in East Lindsey

The Next Supply Statement and the Next Delivery Test

The council restates its supply each year, and while the 2018 plan stays in place each statement will be measured against the standard method, so the gap between 558 and 1,009 homes a year keeps the figure under pressure. The Housing Delivery Test 2025, published on 17 August 2026, puts the council at 129%, far above the points where the test starts to bite: an action plan at under 95%, a 20% buffer at under 85%, and at under 75% unmet need is treated as evidenced for policy S5.

A Plan Review With No Published Timetable

The council's website, as checked on 4 November 2026, shows no revised Local Development Scheme with dates for the review. Until a new plan is adopted, the 2018 plan and its coastal restraint decide applications. When the review restarts, sites will be scored much as our guide to calls for sites and local plans describes.

  • Inland land on the edge of a town is best looked at now, while the council's own figure is short of five years.
  • Land that needs an allocation, such as a larger site away from a town, is worth putting forward through the call for land before the review restarts.
  • Coastal land depends on the plan itself, so any change there will come through the review.

Questions About Selling Land in East Lindsey

My field is on the edge of Chapel St Leonards. Is there any chance of homes on it?

Very little for open market housing. The whole village is treated as inside the Coastal Zone, where new homes are limited to those already permitted, with narrow exceptions for affordable homes and single plots. Tourism or business uses may have a better route.

Louth already has more than a thousand homes allocated. Is my land next to the town still worth selling for development?

It can be. Policy SP3 supports windfall housing immediately next to a town's developed edge, and with the council at 2.33 years extra land carries weight. What decides it is whether the field keeps the shape of the town and links to it on foot.

I own land near Horncastle with views up to the Wolds. Does that rule it out?

No, but the landscape work matters more. Land inside the National Landscape faces the strictest test, while land outside it is judged partly on its effect on the setting.

I put land forward in the 2021 call for land. Is that enough, or should I act now?

Land put forward in 2021 should be on the council's records already. With the review still at issues and options, an application may be the more direct route for land on the edge of a town.

We have inherited a farm near Spilsby. Is the town in the coastal restriction?

No. Spilsby is one of the towns named in policy SP1, and it is not on the plan's list of settlements treated as wholly inside the Coastal Zone. Our probate guide covers how a sale works while an estate is being settled.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in East Lindsey Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where East Lindsey stands on housing shapes which matter most here.

Selling Land in East Lindsey? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Lincolnshire

  • County overview

    Selling Land in Lincolnshire

    Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 127% of need

    Selling Land in Boston

    Sell land in Boston, near Kirton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in North Kesteven

    Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in West Lindsey

    Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 244% of need

    Selling Land in North East Lincolnshire

    Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 141% of need (joint area)

    Selling Land in Lincoln

    Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 161% of need

    Selling Land in South Holland

    Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 97% of need

    Selling Land in South Kesteven

    Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in North Lincolnshire

    Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.