Lincolnshire council area
Selling Land in West Lindsey
Checked on
West Lindsey stretches from the River Trent at Gainsborough across to the market towns of Caistor and Market Rasen, with part of the Lincolnshire Wolds inside its boundary, and down to the northern edge of Lincoln. It shares a local plan adopted in April 2023 with Lincoln and North Kesteven, and since October 2026 the size limit that plan placed on village schemes is no longer applied, which changes the picture for land in and around its many villages.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in West Lindsey and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
West Lindsey can show 7.1 years of housing land, more than the five years national policy expects, and the joint area it is measured with, the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey), built 141% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from April 2023.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in West Lindsey
- Plots and small fields within the built form of Welton, Nettleham, Saxilby, Scotter, Keelby, Cherry Willingham or Dunholme, now that scheme size is no longer capped.
- Land in and around Gainsborough that lies clear of the Trent flood plain.
- Fields by Caistor and Market Rasen, where the plan directs proportionate growth, with the Wolds setting checked first.
- Farmland that could be put forward for the new Central Lincolnshire plan, especially in the Lincoln Strategy Area villages.
- Former farmyards and redundant buildings in the smaller villages, and inherited land where a family wants the planning position settled.
Our free review starts with the settlement tier, the flood zone, the Wolds boundary, access and the title. Where land is worth taking forward, we fund the surveys, the design and the application ourselves, under an option at a price agreed before any of that work starts, and you farm or use the land as now until completion. If permission is refused the land stays yours and nothing is owed. Larger holdings are covered on our farmland page, and each stage of the process is set out on how it works.
Is Your Land in West Lindsey a Good Fit?
You do not need to know the planning rules to sell land for development in West Lindsey. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in West Lindsey
There are three common ways to sell land with development potential in West Lindsey. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in West Lindsey: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in West Lindsey and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in West Lindsey
Three things shape the chances of selling land for development in West Lindsey: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
141%
Measured jointly for the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey), so this is the whole area's result. Meeting its housing requirement.
Five-year housing land supply
7.1 years
Five years or more of deliverable housing land. Position at 31 March 2025, measured against the adopted Central Lincolnshire Local Plan requirement of 1,102 homes a year across the City of Lincoln, North Kesteven and West Lindsey, plus a 5% buffer. Stated by the Central Lincolnshire Joint Strategic Planning Committee, for the whole Central Lincolnshire Local Plan area.
Checked sourceHomes built against homes needed
4,544
of 3,219 needed, April 2022 to March 2025, across the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey)
Most recent strategic plan adopted
April 2023
The plan currently used to decide applications.
New plan progress
Latest step
The Central Lincolnshire Local Plan, adopted on 13 April 2023, covers the City of Lincoln, North Kesteven and West Lindsey. The joint planning team published its notice of intention to prepare a new plan on 12 October 2026 and opened scoping consultation on 22 October 2026, with a closing date of 17 December 2026. Its timetable of November 2026 puts Gateway 1 on 1 March 2027, consultation on proposed content from 30 September to 11 November 2027 and adoption in September 2029
Checked source
See how West Lindsey compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Where Your Land Sits, From the Trent at Gainsborough to the Wolds
West Lindsey District Council is based in Gainsborough, its largest town, beside the River Trent, which forms the district's western boundary. The rest of the district is rural: a long run of villages north of Lincoln, the two small market towns of Caistor and Market Rasen, and the former RAF Scampton, which the inspectors describe as previously home to the Royal Air Force Aerobatic Team.
- One main town. Policy S1 of the Central Lincolnshire Local Plan names Gainsborough and Sleaford as the two main towns beyond Lincoln, and expects their growth to come primarily through sites allocated in the plan.
- Two market towns. Caistor and Market Rasen are to see significant, but proportionate, growth.
- Eight large villages in the district. Bardney, Cherry Willingham, Dunholme, Keelby, Nettleham, Saxilby, Scotter and Welton all sit in the plan's large village tier.
- Medium and small villages. Hemswell Cliff and Scampton (RAF) are listed as medium villages, alongside places such as Sudbrooke, while Scampton village itself is a small village.
- A corner of Lincoln's growth. The first 500 homes at the Lincoln North East Quadrant were permitted in West Lindsey in May 2016, and the joint monitoring report records 75 homes completed in the West Lindsey part of its second phase in 2024/25, with 101 more under construction at 31 March 2025.
The council's monitoring report for 2024/25 also confirms that part of the nationally designated Lincolnshire Wolds Area of Outstanding Natural Beauty falls within the district. The adopted plan treats that as a real difference on the ground: its village policy rules out First Homes exception sites inside the designated area.
If you are thinking of selling land in West Lindsey, the tier of the nearest settlement is the first fact we establish, because a field by Welton, a paddock behind Caistor and a plot near the old base at Scampton fall under quite different parts of the plan.
Selling Land Around Gainsborough: Two Extensions and the Riverside
Policy S2 sends around 12% of Central Lincolnshire's new homes to Gainsborough, through a mix of urban regeneration and two large urban extensions. Over the plan's first seven years the town delivered less than that share. The joint Local Plan Monitoring Report 2024 to 2025 counts 842 homes built in Gainsborough since 2018, 8.71% of the plan area's total, although 156 completions in 2024/25 took its share for that year to 12.9%.
| Extension | Planned | Position in the monitoring report |
|---|---|---|
| Gainsborough Northern Neighbourhood (WL/GAIN/001) | Up to 2,500 homes, about 750 within the plan period, and about 7 hectares of employment land | Phase 1 outline approved September 2020; reserved matters for 130 homes granted May 2023, with 57 under construction at 31 March 2025; reserved matters for 295 more homes received September 2025 and not yet determined |
| Gainsborough Southern Neighbourhood (WL/GAIN/015) | About 2,500 homes, about 750 within the plan period, about 4 hectares of employment land and land for a two form entry primary school | Outline approved July 2011; 261 of the 454 homes in Phase 1 completed; reserved matters for 539 homes in Phase 2, received June 2023, awaiting decision; an outline for 2,046 homes held in abeyance until Phase 2 is settled |
The southern site has averaged 65 completions a year over the last four years, up from 60 a year over the three years to 2023/24. Further phases of both extensions hinge on applications that were still undecided when the monitoring report was prepared, so the pace of the town's growth turns on those decisions.
Flood Risk on Gainsborough's Sites
When the councils screened Gainsborough's sites for the plan, the Level 1 Strategic Flood Risk Assessment of March 2022 recorded how much of each lay in Flood Zone 3, the highest band of flood risk, and whether that risk came from a main river, where the Environment Agency has powers to maintain and improve the channel, or from an ordinary watercourse:
| Site assessed in Gainsborough | Area | Share in Flood Zone 3 | Source of the risk |
|---|---|---|---|
| WL/GAIN/004 | 0.88 hectares | 100% | Main river |
| WL/GAIN/005 | 4.29 hectares | 100% | Main river |
| WL/GAIN/008 | 2.03 hectares | 100% | Main river |
| WL/GAIN/010 | 1.72 hectares | 98.49% | Main river |
| WL/GAIN/011 | 1.56 hectares | 31.57% | Main river |
| WL/GAIN/015, the Southern Neighbourhood | 140.45 hectares | 1.92% | Ordinary watercourse |
Four of the five smaller sites sit wholly or almost wholly in the highest band and the fifth about a third in it, all from a main river, while the 140 hectare Southern Neighbourhood is almost entirely clear of it. Land on the town's southern side can therefore start from a very different position to a yard on ground like those smaller sites, which must pass the sequential test our flood risk guide explains.
For an owner near Gainsborough, the flood map and the progress of the two neighbourhoods are the two facts that shape a sale: land away from the river avoids the first, and a site small enough to be built quickly does not wait on the second.
Village Plots and Paddocks Now the Size Limit Has Gone
The joint plan has changed its approach to villages twice. The plan adopted in 2017 let each village grow by a set percentage, 10% or 15% of its homes. The inspectors who examined the replacement recorded that those growth levels were removed, partly because perfectly acceptable schemes had been prevented by them, and replaced with a cap on the size of each unallocated scheme.
| Rule for unallocated village sites | Under the adopted plan as written | As applied since October 2026 |
|---|---|---|
| Within the developed footprint of a large or medium village | Typically up to 10 homes | No size limit; national policy S4 applies |
| Within the developed footprint of a small village | Typically up to 5 homes | No size limit; national policy S4 applies |
| Immediately next to the developed footprint | Only First Homes or rural affordable exception sites, and no First Homes exception site in the Wolds | Unchanged |
| Scale of a First Homes exception site | Unlikely to be proportionate above a 5% increase in the village's homes, and often less | Unchanged |
The change in the right hand column comes from national policy S4 of the August 2026 framework, which supports development inside settlements unless the harm would substantially outweigh the benefits. Central Lincolnshire's note of October 2026 concludes that a limit on the size of schemes within settlements can no longer be applied, and that the rest of the village policy continues to apply alongside the framework.
The note describes the old cap for medium villages as 5 homes, while the plan and the inspectors' report set it at 10; with the cap gone, the difference no longer matters.
Welton, Nettleham and Scothern
Three villages north east of Lincoln show how the plan handles larger village allocations. Welton, a large village within the Lincoln Strategy Area, has five sites for around 750 homes, and the inspectors supported further homes in principle on land the plan holds in reserve there. Land east of Brookfield Avenue in Nettleham was carried over from the earlier plan and the made neighbourhood plan, with surface water flooding to be resolved. At Scothern, two sites for about 97 homes meant growth of around 26%, which the inspectors found was not disproportionate for a medium village. Neighbourhood plans for Scothern and Nettleham were both adopted in 2024/25.
For an owner of land inside a village, the removal of the cap is a very practical change: a plot within the built form of Saxilby, Scotter or Cherry Willingham that could take a dozen homes is now judged on its effects rather than turned away on numbers.
Owning Land Near Scampton or Hemswell Cliff
North of Lincoln, two places carry their own policies in the plan, and neither works like an ordinary village site.
- RAF Scampton. The inspectors recorded that the plan responds to the impending closure and sale of the base with a policy, S75, to manage its reuse, and modified it so that redevelopment must come forward through a separate development plan document.
- The council's bid. On 2 March 2026 the full council agreed unanimously to progress plans to buy the 800 acre site from the Home Office, with Scampton Holdings Limited as its development partner, for a scheme of more than £300 million based on aviation, heritage, tourism and education, with the airfield kept in use.
- Where the sale stood. In a statement of 30 September 2026 the council said the Home Office had demonstrated that the commercial process was still live, and that its own aims for the site were unchanged.
- Hemswell Cliff. The inspectors noted that Hemswell Cliff is also identified as an Enterprise Zone. The joint monitoring report shows its business park at 26 hectares, with 25.83 hectares still undeveloped at 31 March 2025.
The council's published proposals for Scampton do not mention new housing, and the monitoring report counts Hemswell Cliff's business park as employment land. For owners around Scampton and Hemswell Cliff, that means the two sites are best treated as uncertain neighbours rather than a reason for growth, and land there is judged under the village rules above until the Scampton document exists.
Land Beyond the Villages, and a Supply Figure Shared With Lincoln and North Kesteven
Central Lincolnshire publishes one supply figure for all three councils. The Five Year Land Supply Report of October 2025, based on monitoring data at 31 March 2025, finds 7.1 years across the plan area, measured against the joint requirement of 1,102 homes a year with a 5% buffer. It gives no figure for West Lindsey alone, so 7.1 years is the plan area's position and not the district's.
The same is true of delivery. The Housing Delivery Test 2025 scores the three councils together and records 4,544 homes built against 3,219 required, a result of 141% for the Central Lincolnshire Local Plan area. West Lindsey's own monitoring report shows its part:
| Year | Net homes completed in West Lindsey | Affordable homes (gross) |
|---|---|---|
| 2018/19 | 407 | 68 |
| 2019/20 | 573 | 152 |
| 2020/21 | 485 | 20 |
| 2021/22 | 589 | 71 |
| 2022/23 | 681 | 165 |
| 2023/24 | 608 | 186 |
| 2024/25 | 543 | 178 |
That makes 3,886 net homes since the plan's base date of 2018, an average of 555 a year and roughly two fifths of the 9,678 built across Central Lincolnshire in the same seven years.
Why the Strong Figures Shape the Route
Beyond a settlement's edge, national policy S5 supports homes where unmet need is evidenced, the land relates well to the settlement and it can be served by roads, schools and drainage. A supply short of five years is one piece of evidence to be weighed, never an automatic finding, and a delivery result below 75% has need treated as evidenced. Neither applies to the joint plan area, and the October 2026 note adds that, while the area keeps a five-year supply and a delivery result above 75%, the framework's transitional rules mean the position is not to be treated as evidence of unmet need for five years from the plan's adoption.
So an owner selling greenfield land beyond a West Lindsey village faces a high bar today, while land inside a village, the reserve land at Welton and sites for the new plan are where the routes lie.
What the Timetable Means for Landowners in West Lindsey
On 12 October 2026 the Central Lincolnshire Joint Strategic Planning Committee published a notice of intention to start a new plan, prepared under the new system with three gateway checks. Its Local Plan Review Timetable of November 2026 sets out these milestones:
- Scoping consultation opened on 22 October 2026, and the timetable sets 17 December 2026 as the closing date for representations.
- Proposed content and evidence out for consultation from 30 September 2027 to 11 November 2027, then the proposed plan in June to August 2028 and submission in December 2028.
- Adoption in September 2029, after an examination expected from January to July 2029; the timetable uses the first of the month where the exact day is not yet known.
The consultations page says the online call for sites tool, used for a call between December 2025 and February 2026, has been reopened during the scoping consultation. How the councils then assess each entry is covered in our call for sites guide.
The Plan's Fifth Year and the Joint Figures
The adopted plan reaches five years in April 2028, before its replacement is due. From then the government's standard method would generally take the place of the plan's own requirement when supply is tested, for all three councils together. The Housing Delivery Test is published once a year, and a new joint supply report would replace 7.1 years for the whole plan area at once. We would not predict either.
Council Structures Still Undecided
In a letter of 29 October 2026 the minister for local government withdrew the decisions announced in July 2026 for Lincolnshire, North Lincolnshire and North East Lincolnshire, one of nine areas treated that way. The letter keeps all the options and proposals for the area under review, promises an outcome for every area by early 2027, and confirms that the elections due in May 2027 go ahead to the existing councils. Until a new structure is decided and in place, West Lindsey District Council decides applications here.
In practice, a plot within a West Lindsey village can be assessed straight away under national policy S4, whereas a field outside the built form needs its evidence ready before the councils consult on the content of the new plan, from 30 September 2027.
Questions About Selling Land in West Lindsey
My paddock is inside Scotter, but the council used to say villages could only take ten homes on one site. Does that still apply?
No. Central Lincolnshire's October 2026 note says the size limit in the village policy is no longer applied, so a scheme inside the built form is judged on its effects under national policy S4. Character, access and neighbours still decide the number of homes.
I own land on the edge of Gainsborough. Will the two big neighbourhoods block anything else?
Not by themselves. They carry most of the town's planned growth, but they are being built in phases over many years, and the plan supports suitable sites within the town's developed footprint in principle. Land by the river faces the flood test first, while land well away from it often does not.
Our farm is near RAF Scampton. Could the redevelopment of the base help us sell land for housing?
Not at present. The plan requires the base to come forward through its own planning document, the council's proposals focus on aviation, heritage and jobs, and the Home Office sale was still in progress at the end of September 2026. Land nearby is judged under the village rules for now.
We have land near Caistor that looks up to the Wolds. Can we still put it forward?
Yes, through the call for sites tool, which Central Lincolnshire reopened during its scoping consultation. Caistor is a market town where the plan expects proportionate growth, though a First Homes exception site is not allowed inside the Wolds and the landscape needs assessing early.
We inherited fields beyond Welton. Is the strong supply figure a reason to wait?
It means an application beyond the village edge is hard today, so the new plan is the natural route, and its content consultation in autumn 2027 is the stage to be ready for. Our probate guide explains how an option can be agreed while an estate is being settled.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in West Lindsey Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in West Lindsey, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in West Lindsey? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Lincolnshire
County overview
Selling Land in Lincolnshire
Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 129% of need
Selling Land in East Lindsey
Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 141% of need (joint area)
Selling Land in Lincoln
Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 141% of need (joint area)
Selling Land in North Kesteven
Sell land for development in North Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 137% of need
Selling Land in North Lincolnshire
Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 244% of need
Selling Land in North East Lincolnshire
Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 127% of need
Selling Land in Boston
Sell land in Boston, near Kirton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 161% of need
Selling Land in South Holland
Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 97% of need
Selling Land in South Kesteven
Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Lincolnshire
- BassetlawNottinghamshire · 5.31 years of housing land
- Newark and SherwoodNottinghamshire · 3.84 years of housing land
Sources
- Central Lincolnshire Joint Strategic Planning Committee: Central Lincolnshire Local Plan (adopted April 2023)
- Planning Inspectorate: Report on the examination of the Central Lincolnshire Local Plan (March 2023)
- Central Lincolnshire: Five Year Land Supply Report 2025 to 2030 (October 2025)
- Central Lincolnshire: The adopted Central Lincolnshire Local Plan and the new NPPF (October 2026)
- Central Lincolnshire: Local Plan Review Timetable (November 2026)
- Central Lincolnshire: Consultations, including the scoping consultation and call for sites (November 2026)
- West Lindsey District Council: Authority Monitoring Report, 1 April 2024 to 31 March 2025 (October 2026)
- Central Lincolnshire: Local Plan Monitoring Report 2024 to 2025 (October 2026)
- Roy Lobley Consulting for Central Lincolnshire: Strategic Flood Risk Assessment, Level 1 (March 2022)
- West Lindsey District Council: Council unanimously agrees to progress plans to acquire the former RAF Scampton site (March 2026)
- West Lindsey District Council: Press statement, RAF Scampton (September 2026)
- Ministry of Housing, Communities and Local Government: Local government reorganisation, withdrawn letter to 9 areas (October 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.