North Kesteven runs from the southern edge of Lincoln, through North Hykeham, Waddington and Bracebridge Heath, to Sleaford and the fen villages beyond it. It shares one local plan, adopted in April 2023, with the City of Lincoln and West Lindsey, and for most owners here the tier of the nearest village, not a settlement boundary, decides what a field could become.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in North Kesteven and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

North Kesteven can show 7.1 years of housing land, more than the five years national policy expects, and the joint area it is measured with, the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey), built 141% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from April 2023.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in North Kesteven

  • Fields and paddocks adjoining the large villages, from Ruskington, Heckington and Metheringham to Navenby, Branston and Skellingthorpe.
  • Land within or against the built edge of medium villages such as Leasingham, Bassingham, Harmston and Welbourn.
  • Land on the edges of Sleaford, and in the well connected villages around the town.
  • Redundant farmyards, depots and other previously developed sites in the countryside.
  • Inherited farmland and larger holdings to put forward to the new Central Lincolnshire plan.

Land on the fen side, close to an airfield or inside one of the quadrants needs more checks first, and we will tell you plainly what they show. When a field passes that first look, the flood, soil, noise, access and design work is paid for by us, under an option with a price set on signing and pitched above the land's present farming value. You keep farming it until completion, and if permission is refused it stays yours and you owe us nothing. Families looking to sell inherited land can read our inherited land page.

Is Your Land in North Kesteven a Good Fit?

You do not need to know the planning rules to sell land for development in North Kesteven. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in North Kesteven

There are three common ways to sell land with development potential in North Kesteven. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in North Kesteven: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in North Kesteven and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in North Kesteven

Three things shape the chances of selling land for development in North Kesteven: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    141%

    Measured jointly for the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey), so this is the whole area's result. Meeting its housing requirement.

  • Five-year housing land supply

    7.1 years

    Five years or more of deliverable housing land. Position at 31 March 2025, measured against the adopted Central Lincolnshire Local Plan requirement of 1,102 homes a year across the City of Lincoln, North Kesteven and West Lindsey, plus a 5% buffer. Stated by the Central Lincolnshire Joint Strategic Planning Committee, for the whole Central Lincolnshire Local Plan area.

    Checked source
  • Homes built against homes needed

    4,544

    of 3,219 needed, April 2022 to March 2025, across the Central Lincolnshire Local Plan area (Lincoln, North Kesteven and West Lindsey)

  • Most recent strategic plan adopted

    April 2023

    The plan currently used to decide applications.

  • New plan progress

    Latest step

    The Central Lincolnshire Local Plan, adopted on 13 April 2023, covers the City of Lincoln, North Kesteven and West Lindsey. The joint planning team published its notice of intention to prepare a new plan on 12 October 2026 and opened scoping consultation on 22 October 2026, with a closing date of 17 December 2026. Its timetable of November 2026 puts Gateway 1 on 1 March 2027, consultation on proposed content from 30 September to 11 November 2027 and adoption in September 2029

    Checked source

See how North Kesteven compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

From Lincoln's Southern Edge to the Fen Villages Beyond Sleaford

North Kesteven District Council is run from Sleaford, which the adopted plan describes as a thriving market town that has seen rapid housing growth. At the other end of the district, North Hykeham is counted by the plan as part of Lincoln's main built-up area, so the council decides applications on the city's doorstep as well as in a long run of farming villages along the Lincoln Edge and out towards the fens.

  • Three working air bases. The plan names active RAF bases at Waddington, Cranwell and Digby inside the district, alongside Scampton in West Lindsey.
  • Mostly farmland. It records that land use across Central Lincolnshire is predominantly agricultural, with low lying vales and fenland as well as the ridge it calls the Lincoln Edge.
  • No settlement boundaries. The inspectors who examined the plan noted that no boundaries are drawn: land beyond the developed footprint of a village or hamlet simply counts as countryside.
  • Twelve neighbourhood plans. The council's monitoring report for 2024/25 says the total number of adopted neighbourhood plans remains at 12, and that progress continues on plans for Swinderby and Sleaford.

Because there is no line on a map, the question for a field is how it sits against the buildings of the village beside it. A neighbourhood plan can then allocate land on top of what the local plan says, so the made plan for a parish is one of the first documents we read.

If you are thinking of selling land in North Kesteven, start with two facts: which village your land adjoins and where that village sits in the plan's hierarchy. Those two answers shape almost everything that follows.

Which Tier Your Village Sits in, and What Each Tier Can Take

Policy S1 of the Central Lincolnshire Local Plan ranks every settlement, using the number of homes each had at 1 April 2018. The North Kesteven places it names include:

Source: Central Lincolnshire Local Plan (April 2023), Policy S1. Large village sizes are counted at 1 April 2018.
Tier in Policy S1North Kesteven settlementsWhat the plan supports
Lincoln Urban AreaNorth Hykeham, South Hykeham Fosseway and Waddington Low Fields, with the two quadrants on the city edgeThe main focus for growth, including the extensions allocated on its edge
Main TownSleafordSubstantial housing growth, mainly through urban extensions
Large Villages, 750 homes or moreBillinghay, Bracebridge Heath, Branston, Heckington, Heighington, Metheringham, Navenby, Ruskington, Skellingthorpe, Waddington, Washingborough, Witham St HughsAllocations, neighbourhood plan sites and unallocated sites within the developed footprint
Medium Villages, 250 to 749 homesAmong them Bassingham, Brant Broughton, Cranwell, Digby, Dunston, Eagle, Greylees, Harmston, Helpringham, Leasingham, Nocton, Potterhanworth, Welbourn and WellingoreAs for large villages, on a smaller scale
Small Villages, 50 to 249 homesAround 120 places across the three councilsSites within the developed footprint
Hamlets, at least 15 homesClusters too small to be villagesSingle infill plots or neighbourhood plan allocations
CountrysideEverything elseFarming, infrastructure, renewable energy and other uses that need a rural setting

The Village Size Limits No Longer Apply

Policy S4 of the local plan was written to hold unallocated schemes to 10 homes in large and medium villages and 5 in small ones. In October 2026 the planning team published a note on the new national framework which says those limitations will no longer be applied in decision-making, because the new framework gives in-principle support to development within identified settlements, hamlets excepted. Under national policy S4 such a scheme is approved unless the harm would substantially outweigh the benefits. The note keeps the rest of local Policy S4 in use, and that includes its third part: unallocated land immediately adjacent to a village's developed footprint is supported only as a First Homes exception site or a rural affordable housing exception site.

What the Examination Said About Particular Villages

  • Leasingham. Land at Meadow Lane lies partly in Flood Zones 2 and 3, and the inspectors cut it to 25 homes to keep them out of the areas at risk.
  • Billinghay. On the fen side of the district, they asked for vehicular access to be provided so the village extension would be comprehensive and well planned.
  • Heckington and Branston. They found the Heckington site relatively unconstrained and in keeping with the shape of the village, and the Branston site a logical extension beside new housing.
  • Bassingham. Its allocations depend on their staying in the made neighbourhood plan.

Most owners selling land for development in North Kesteven own a field or a paddock beside one of these villages, and for that kind of site the shape of the built edge, flood zones and access now count for more than a numerical cap. Our flood risk guide explains how the zones are tested.

Sleaford's Urban Extensions and the Town's Slower Share of Homes

Policy S2 sends around 12% of Central Lincolnshire's new homes to Sleaford, primarily through sustainable urban extensions, then other sites in the town and well connected villages nearby. The joint monitoring report for 2024/25 shows the town running behind that share:

Source: Central Lincolnshire Local Plan Monitoring Report 2024 to 2025, table 3. Sleaford took 12.9% of completions in 2024/25 alone.
Part of the plan areaHomes built, 2018/19 to 2024/25Share of all homes built
Lincoln Strategy Area5,93661%
Sleaford929About 9.6%
Elsewhere1,971About 20.4%
Central Lincolnshire9,678100%

The inspectors had already noticed the gap, putting Sleaford at 10.5% when they reported, and said the difference was not significant because the extensions were still at an early stage, leaving the joint committee to monitor it.

Handley Chase and Sleaford West

  • Sleaford South, at Handley Chase. Outline permission was granted in July 2015 for 1,450 homes, and the landowner now puts capacity at about 1,382. The monitoring report lists detailed permissions for Bellway, Miller, Keepmoat, Taylor Wimpey, Lindum with Longhurst and T Balfe, which by our count add up to about 1,140 homes, with one housing phase still to gain detailed permission. A community centre and a nursery with a community café were approved in 2024/25.
  • Sleaford West. Up to 1,400 homes and at least 3 hectares of employment land. The inspectors recorded that this quadrant had lagged behind, with a resolution to grant in 2017 but no decision issued for want of a legal agreement. Outline permission was finally approved on 11 April 2023, with a section 106 agreement securing more than £5.3 million. The joint monitoring report for 2024/25 named Lovell Homes as strategic developer, recorded that the outline permission was due to lapse in April 2026, and said Padleys expected to seek reserved matters for a first phase of 295 homes off St Deny's Avenue once demolition and a revised access had been dealt with. Anyone selling land beside this quadrant should have the council's planning register checked for what has happened since.

For someone selling land near Sleaford, the gap between the share the plan intends and the share built so far is a matter the new plan will have to weigh, and land on the edge of the town or in the well connected villages around it is the kind of site that review looks at.

North Hykeham, Bracebridge Heath and Waddington on the City Edge

The two extensions on Lincoln's southern side are North Kesteven's to decide. The joint monitoring report gives the latest position on each:

  1. South East Quadrant, Bracebridge Heath and Canwick Heath. One outline permission, 20/0057/OUT for up to 1,087 homes, was granted on 4 April 2023. Linden Homes has built out a first phase of 132 homes, Taylor Wimpey submitted reserved matters for 450 homes north of Canwick Avenue in July 2024, and roundabout and servicing works began in February 2025.
  2. South West Quadrant, North Hykeham. Around 2,000 homes, about 5 hectares of employment land, a primary school and a local centre, alongside a large contribution to the North Hykeham Relief Road. A first phase of 167 homes was approved in October 2018, and the relief road gained permission on 13 May 2024.
  3. The concept plan rule. In March 2025 the council repeated that the South West Quadrant needs a broad concept plan and design code, and that proposals coming before it is agreed, other than inconsequential ones, will not be supported.

Living Beside RAF Waddington

Waddington is a large village with an air base on its doorstep. When the inspectors accepted the allocation at NK/WAD/015, bounded on two sides by homes then being built, they called it a logical and sound extension and noted that the policy requirements would ensure any scheme properly assesses its proximity to RAF Waddington. They also recorded that most brownfield sites in the Central Lincolnshire countryside are Ministry of Defence land, and that previous development alone does not justify wholesale support.

So a field near Waddington, Harmston or Bracebridge Heath begins with two checks: whether it falls inside the quadrant land, where the masterplan governs, and how close it lies to the airfield. Owners selling greenfield land in this part of the district usually find those answers set the scale of what can be built.

Farmland, Soil Grades and the District's Solar Consents

Three very large solar schemes in the district have gone to the government rather than the council. Each is a Nationally Significant Infrastructure Project, consented by the Secretary of State through a development consent order rather than by the council:

Sources: Secretary of State decision letters for Springwell (April 2026) and Beacon Fen (August 2026); Planning Inspectorate project page for Fosse Green Energy (November 2026).
SchemeWhereOutcome
Springwell Solar FarmWithin North Kesteven, connecting at the Navenby substationConsent granted with modifications, 8 April 2026
Beacon Fen Energy ParkAbout 6.5 kilometres north east of Sleaford and 2.5 kilometres north of Heckington, with cable works into BostonConsent granted with modifications, 21 August 2026
Fosse Green EnergyAbout 9 kilometres south west of LincolnAt the decision stage, with 6 January 2027 the date set for that stage to finish

Farmland quality ran through every decision. The Springwell decision letter puts the scheme on about 541 hectares of best and most versatile land, 98 hectares of it lost permanently. In the Beacon Fen decision, the county council put the farmland lost at 493.27 hectares, 56% of it best and most versatile, and the Secretary of State agreed with the examiners that the loss deserved great negative weight, even though consent was granted.

The local plan's own Policy S14 starts from a presumption in favour of ground mounted solar, unless there is clear and significant harm or a site specific soil assessment shows the land is best and most versatile and the scheme fails the plan's farmland policy. That is a different use of land from the homes we take forward, but it shows how closely soil grades are now read in this district. Our farmland page explains how we look at a field beside a village, soil quality included.

Nearly Half the Plan Area's Homes, and a Supply Measured Jointly

The Housing Delivery Test 2025 measures the City of Lincoln, North Kesteven and West Lindsey together, as the Central Lincolnshire Local Plan area, and records 4,544 homes built against 3,219 required, a result of 141%. That result belongs to the plan area as a whole, not to North Kesteven on its own. The joint supply report of October 2025 likewise finds 7.1 years for the whole plan area at 31 March 2025, against the adopted Central Lincolnshire Local Plan requirement of 1,102 homes a year across the City of Lincoln, North Kesteven and West Lindsey, plus a 5% buffer, and gives no separate figure for North Kesteven.

What the report does show is how much of the area's building happens here:

Source: table 1 of the joint supply report covering 2025 to 2030, published in October 2025, which sets each district beside the plan area total.
YearHomes built in North KestevenHomes built in Central Lincolnshire
2018/196981,451
2019/207601,538
2020/214691,121
2021/225581,295
2022/237731,613
2023/247031,446
2024/255661,214
Total4,5279,678

Across those seven years North Kesteven built about 47% of the plan area's homes. The council's own monitoring report for 2024/25 puts that year at 556 net, from 567 gross completions less 11 demolitions and other losses, ten fewer than the joint table; the joint monitoring report records a single demolition in the district that year, so the two appear to count losses differently. Of the 556, 227 were affordable homes, or 40.8%, and the council collected £955,035 of Community Infrastructure Levy in the year.

Why the Joint Position Matters Beyond a Village

Out in the countryside, homes rely on national policy S5, which needs evidence of unmet need, a field well related to the village or town, and roads, schools and drainage with room to serve it. A shortfall in five-year supply would count as evidence for a decision maker to weigh, never as a finding in itself, while a delivery result under 75% would mean need is taken as shown. With the plan area at 7.1 years of land and a joint result of 141%, neither applies across Central Lincolnshire, and the October 2026 note adds that, where a plan adopted within the last five years shows five years of land and a delivery result above 75%, the framework does not treat that as evidence of unmet need for five years from adoption.

In practice that makes the village tier and the developed footprint the main routes for now, with the new plan for larger land. The same note says that where the local plan is silent, as it is on some flexibility national policy S5 allows for previously developed land, the national policy takes primacy, which can help a redundant yard or farmstead in the countryside. Our brownfield and yards page shows what we mean.

What the New Plan Timetable Means for Landowners in North Kesteven

The joint planning team for the three councils published its notice of intention to prepare a new plan on 12 October 2026. Its timetable set a six week scoping stage beginning on 22 October 2026, closing to comments at 23:59 on 17 December 2026. After that it puts the Gateway 1 self-assessment, which it calls the formal start of plan-making, on 1 March 2027, consultation on proposed plan content and evidence from 30 September to 11 November 2027, the proposed plan itself from June to August 2028, submission in December 2028, examination through the first half of 2029 and adoption in September 2029. The timetable gives the first of the month wherever the exact day is not yet known, and says it is reviewed monthly.

The joint planning team's consultations page records a call for sites between December 2025 and February 2026 and says the online tool has been reopened during the scoping consultation. Our call for sites guide sets out how entries are judged after that.

April 2028 and the Yardstick That Follows

The adopted plan reaches five years old in April 2028. From then the shield the October 2026 note describes for plans under five years old falls away, and national policy generally measures supply against the standard method rather than the plan's own requirement. A new joint supply statement would replace the plan area's figure for all three councils at once, and the Housing Delivery Test is published once a year, the latest being the Housing Delivery Test 2025, published on 17 August 2026. At 141%, Central Lincolnshire is clear of every consequence the test carries, the lightest being an action plan under 95% and the heaviest the treatment of unmet need as evidenced under 75%, with a 20% buffer in between at 85%. We do not predict either figure.

Fosse Green, and Reorganisation Back Under Review

The Fosse Green decision page gives 6 January 2027 as the date set for its decision stage. On reorganisation, the government's July 2026 choice of two new unitary councils for Lincolnshire was withdrawn on 29 October 2026, so that every proposal first submitted in November 2025 can be weighed again. As West Lindsey District Council explained on 2 November 2026, the withdrawal does not cancel reorganisation, and the government has committed to an outcome for each area under review by early 2027. Until a new structure is decided and set up, North Kesteven District Council stays the planning authority for applications here, and the three councils carry on with the joint plan.

  • A plot or paddock inside a village's built footprint can be looked at now, without the old size limit.
  • A field adjoining a large village needs its evidence ready before the councils consult on what the new plan should contain, from 30 September 2027; sites can be entered through the call for sites tool, reopened while comments on scoping are taken up to 17 December 2026.
  • Land near an airfield or on the fen edge needs its noise or flood position settled first, which is where our free review begins.

Questions About Selling Land in North Kesteven

My field is inside the built edge of Heckington. Is it still limited to ten homes?

No longer in decision-making. The Central Lincolnshire planning team's October 2026 note says the size limits in local Policy S4 will not be applied, because national policy now supports development within identified settlements. Layout, access, drainage and the character of the village still decide how many homes a site can take.

My land lies just beyond the last houses of Metheringham. Can it come forward now?

Usually not as open market housing at present. Local Policy S4 allows land adjoining a village only as a First Homes or rural affordable exception site, and with the plan area above five years of land, national policy S5 offers little until that changes. The new plan, through the reopened call for sites, is the main route for a field like this.

Does being close to RAF Waddington or RAF Cranwell rule my land out?

Not by itself. The inspectors accepted a housing allocation at Waddington, bounded on two sides by new homes, because the policy requirements would make any scheme properly assess how close it lies to the base. The airfield is therefore something a scheme has to address rather than a bar, and we look at how near your land sits to it at the very start of our review.

My farm borders the Springwell or Beacon Fen solar scheme. Does that affect selling land for homes?

Those consents cover their own order land. For a field outside it, the housing case still turns on the village it adjoins and the local plan, though we check the order limits and any cable routes against your title plan at the start.

Our parish has a neighbourhood plan. Can it help land beside our village?

It can. Twelve neighbourhood plans are made in North Kesteven, and the inspectors described them as a proper way to identify and allocate housing sites. Where a made plan allocates land, or one is being prepared, as in Sleaford and Swinderby, we read it alongside the local plan. Our Lincolnshire page shows how the other councils in the county compare.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in North Kesteven Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in North Kesteven, these are the ones that matter most here.

Selling Land in North Kesteven? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Lincolnshire

  • County overview

    Selling Land in Lincolnshire

    Sell land for development in Lincolnshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 127% of need

    Selling Land in Boston

    Sell land in Boston, near Kirton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 129% of need

    Selling Land in East Lindsey

    Sell land for development in East Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in Lincoln

    Sell land in Lincoln, near Birchwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 161% of need

    Selling Land in South Holland

    Sell land for development in South Holland: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 97% of need

    Selling Land in South Kesteven

    Sell land for development in South Kesteven: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 141% of need (joint area)

    Selling Land in West Lindsey

    Sell land for development in West Lindsey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in North Lincolnshire

    Sell land in North Lincolnshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 244% of need

    Selling Land in North East Lincolnshire

    Selling land in North East Lincolnshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Lincolnshire

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.