Areas we cover
Selling Land in Cheshire
Checked on
Cheshire's councils are among the strongest housing deliverers in England. Cheshire East and Cheshire West and Chester both built more than double their requirement, and Warrington has a plan adopted in 2023. Much of the north of the county is Green Belt. Cheshire East, Cheshire West and Chester and Warrington all began new local plans in 2026, and Halton has called for sites for a review of its plan. The two large councils report less than five years of housing land, and Warrington's margin is thin. That gives land here more than one route to planning.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential across Cheshire and welcome land of every kind in all four of its council areas: fields and paddocks, inherited land, old yards and larger holdings.
Two of Cheshire's four councils are short of the five years of housing land national policy expects. One has no current published figure. In those council areas, national policy counts that as evidence that more homes are needed, so a well placed field next to a town or village can make a case outside the local plan, weighed with everything else. Elsewhere the local plan is the surest route. Land in the Green Belt faces stricter national tests. The table below shows each council.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
Selling Land in Cheshire, Council by Council
The table shows each council's result in the government's Housing Delivery Test 2025 and where its local plan stands, using the Planning Inspectorate's own monitoring data.
| Council | Housing Delivery Test 2025 | Five-year land supply | Most recent strategic plan adopted | New plan progress |
|---|---|---|---|---|
| Cheshire East | 213% | 3.3 yearsShort of five yearsAt March 2025: Cheshire East Council: Housing Monitoring Update 2024/25, base date 31 March 2025 | July 2017 | New Local Plan started: scoping consultation July to September 2026, Gateway 1 due 30 October 2026Checked September 2026 on the council or government website |
| Cheshire West and Chester | 244% | 1.6 yearsShort of five yearsAt April 2026: Cheshire West and Chester Council: Housing Land Monitor Summary Report 2026 (September 2026) | January 2015 | New Local Plan started: scoping consultation 7 to 28 September 2026, adoption due December 2028Checked September 2026 on the council or government website |
| Warrington | 134% | 5.13 yearsAt April 2025: Warrington Borough Council: Annual Monitoring Report 2025 (December 2025) | December 2023 | Local Plan update under way: Gateway 1 published 21 September 2026, adoption due March 2029Checked September 2026 on the council or government website |
| Halton | 170% | Not publishedAt March 2026: Halton Borough Council: Authority Monitoring Report Housing 2026 (June 2026) | March 2022 | Delivery and Allocations Local Plan 2014 to 2037 adopted 2 March 2022; the council ran a call for sites for a review of the plan until 5 December 2025, describing it as routine maintenance of the plan rather than a new local plan; its planning policy page gives no stages or dates for the reviewChecked September 2026 on the council or government website |
Just over the county line: High Peak (Derbyshire), Newcastle-under-Lyme (Staffordshire), Shropshire (Shropshire) and Staffordshire Moorlands (Staffordshire).
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026, with later milestones we have checked on council and government websites marked "Checked". Five-year land supply figures come from each council's own latest statement, or the latest figure tested at appeal, linked in each row. A Housing Delivery Test result below 75%, or a supply short of five years, counts as evidence of unmet housing need under policy S5 of the NPPF. Local plans move quickly, so always check the council's own website for the latest position.
Cheshire East
Cheshire East is the largest of the four, covering Crewe, Macclesfield, Congleton, Wilmslow, Nantwich, Sandbach, Alsager, Knutsford and Poynton. Its Local Plan Strategy was adopted in July 2017 and released some Green Belt land, including at Handforth for a new garden village. Delivery reached 6,508 homes against a requirement of 3,061. The council published a timetable and notice of intention for a new plan on 12 June 2026, held a scoping consultation from 21 July to 1 September 2026, and has already collected site submissions from earlier calls for sites. Its latest monitoring shows 3.3 years of deliverable sites at 31 March 2025. On 16 September 2026 its Strategic Planning Board resolved to approve 293 homes on safeguarded land at Wilmslow, subject to section 106 agreements, after officers treated that shortfall as evidence of unmet need under policy S5.
Cheshire West and Chester
This council covers Chester, Ellesmere Port, Northwich, Winsford, Frodsham, Neston and a large rural area stretching south to the Shropshire and Welsh borders. Its Local Plan Part One was adopted in January 2015, with a Part Two covering allocations and detailed policies. The new plan will replace both. A scoping consultation ran from 7 to 28 September 2026, with a targeted call for sites promised for later in 2026, and the timetable then runs a draft content consultation from November 2026 to January 2027, submission in May 2028 and adoption in December 2028. The council's 2026 housing land monitor finds 1.6 years at 1 April 2026 against the government's figure.
Warrington
Warrington is a large town between Liverpool and Manchester, at the meeting point of the M6, M56 and M62. Its local plan was adopted in December 2023 and removed 390 hectares from the Green Belt in all, including land for around 4,400 homes that the urban area could not hold. Its December 2025 monitoring report shows 5.13 years at 1 April 2025. Since 1 July 2026 a 20% buffer has applied to its decisions, as its plan figure sits well below the government's, and with that buffer the report's forecast for the next five years clears the line by six homes. The council started an update on 16 April 2026 and published its Gateway 1 self-assessment on 21 September 2026.
So a sale of land in Cheshire turns first on the council it falls in. In Cheshire East and Cheshire West and Chester the shortfall gives well placed land outside the Green Belt a case now, while in Warrington the margin is thin and most open land is Green Belt.
The Land We Buy in Cheshire
- Fields of 2 acres or more next to a town or a larger village.
- Land in south and mid Cheshire outside the Green Belt.
- Green Belt land in the north that is already partly enclosed by development, or has buildings on it.
- Sites mostly in Flood Zone 1, away from the Dee, Weaver and Mersey flood plains.
- Land with a road frontage, or a route to one you control.
- Holdings of at least 20 acres in total near Crewe, Chester, Macclesfield or Warrington.
If your land is in the Green Belt or the Jodrell Bank buffer zone, it is not ruled out. We will look at it properly and tell you honestly where it stands.
Is Your Land in Cheshire a Good Fit?
You do not need to know the planning rules to sell land for development in Cheshire. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Cheshire
There are three common ways to sell land with development potential in Cheshire. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Cheshire: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Cheshire and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
The planning detail in full
Four Unitary Councils, and What They Mean for Selling Land in Cheshire
This page covers four councils: Cheshire East, Cheshire West and Chester, Warrington, and Halton, the borough of Widnes and Runcorn, which has its own page. All four are unitary authorities, so each one decides planning applications, runs highways and schools, and makes its own local plan.
- Very high delivery. In the Housing Delivery Test 2025, Cheshire West and Chester delivered 244% of its requirement, Cheshire East 213%, Halton 170% and Warrington 134%.
- Strong delivery, short supply. Against the government's higher housing figures, Cheshire East reports 3.3 years of deliverable land and Cheshire West and Chester 1.6 years. Warrington's latest statement shows 5.13 years. Halton's 2026 housing monitoring report says it has over five years but gives no figure in years.
- Three new plans under way. Cheshire East, Cheshire West and Chester and Warrington began work on new local plans in 2026. Halton's call for sites for a review of its 2022 plan, which it calls routine maintenance, closed on 5 December 2025.
- Green Belt in the north. The North Cheshire Green Belt covers much of the north of the county, around Chester, Ellesmere Port, Warrington, Wilmslow, Knutsford, Macclesfield and Poynton.
- Major transport links. The M6, M56, M53 and M62 cross the county, and Crewe and Warrington are on the West Coast Main Line.
What Shapes a Sale of Development Land in Cheshire
The North Cheshire Green Belt
The Green Belt in north Cheshire keeps Greater Manchester and Merseyside from spreading south and keeps towns such as Wilmslow, Knutsford, Chester and Warrington apart. Parts of it have been released through the Cheshire East and Warrington plans, and in Halton, where the inspectors who examined its 2022 plan found exceptional circumstances to alter the boundary. Since December 2024, land that does not strongly contribute to Green Belt purposes can be treated as grey belt. Housing there also needs evidence of need, most often a supply under five years or a Housing Delivery Test score under 75%, and the Golden Rules apply to larger schemes. The shortfalls in Cheshire East and Cheshire West and Chester provide that evidence today, and in August 2026 the Prestbury Road appeal allowed up to 200 homes on grey belt near Macclesfield. Warrington, on its published figures, meets neither test at present, and nor does Halton, which reports over five years of land without a figure. Our grey belt guide explains how that is judged. Further south, Crewe and Nantwich are kept apart by strategic green gaps instead.
Jodrell Bank
Jodrell Bank Observatory, near Goostrey, is a World Heritage Site. Cheshire East's policy requires development in its buffer zone to show it will not reduce the efficiency of the telescopes through radio interference. The buffer zone grew out of a consultation zone set up in 1973, and it covers a wide area of countryside and villages. Homes have been refused on these grounds, so land in the zone needs an early check.
Rivers and Flood Risk
The Dee runs through Chester, the Weaver through Northwich and Winsford, and the Mersey through Warrington. The Dane, Bollin and Wheelock add flood plain in Cheshire East. Land in Flood Zones 2 and 3 faces the sequential test, but many Cheshire farms have a large area in Flood Zone 1 away from the brooks. The approach is explained in our guide to flood risk and development.
Heritage and Landscape
Chester has its Roman and medieval walls and a large conservation area, and there are listed halls, estates and conservation areas across the county. The Peak District National Park reaches into the far east of Cheshire East. Heritage and landscape usually shape the layout and density of a scheme rather than ruling it out.
Ground Conditions
Parts of mid Cheshire, around Northwich and Middlewich, have a long history of salt working, and ground stability is something councils and buyers look at there. It is a matter for investigation, not a reason on its own to rule land out.
In Cheshire, the Green Belt line in the north and the Jodrell Bank zone around Goostrey are the two things to check first when selling land, because either can change the route for a field before flood risk, heritage or ground conditions come into it.
Where Growth Is Focused, and Where We Look for Land in Cheshire
Demand in Cheshire comes from its own towns and from people and businesses moving out of Manchester and Liverpool. The areas we watch most closely are:
| Area | Why it matters |
|---|---|
| Crewe | A major rail junction on the West Coast Main Line, with a long record of growth and green gaps rather than Green Belt at its edges. |
| Macclesfield, Wilmslow and Knutsford | High values and strong demand, with Green Belt on almost every edge. |
| Congleton, Sandbach and Alsager | Towns along the M6 corridor in Cheshire East, with Green Belt at Alsager. |
| Chester | A historic city with Green Belt around it and strong demand from families and commuters. |
| Northwich and Winsford | Mid Cheshire towns with river and ground conditions to check, and Green Belt adjoining Northwich. |
| Warrington | A growing town at the junction of three motorways, with a plan adopted in 2023 and an update already under way. |
We are interested in land of 2 acres or more on the edge of these towns and the larger villages, where the site has safe access and is mostly in Flood Zone 1.
What This Means If You Are Selling Land in Cheshire
Cheshire is a strong market. Delivery is well above target, but supply is short in the two large councils and thin in Warrington, so land can be allocated in a new plan or, in some places, make its case sooner under national policy. The main routes are:
- The three new plans. All three are at an early stage, as is Halton's review. Land put forward with good evidence now is better placed when draft sites are chosen. Our guide to local plan stages and calls for sites explains the process.
- Applications outside the Green Belt. In Cheshire East and Cheshire West and Chester, policy S5 treats a supply shortfall as evidence of unmet need to weigh, not an automatic finding, so a well related edge-of-settlement site can have a case now. Inside built-up areas, policy S4 leans towards approval.
- Grey belt in the north. Around Chester, Wilmslow, Knutsford and Macclesfield, land that does little to stop sprawl or merging may qualify, since the shortfalls evidence the need, and larger schemes must meet the Golden Rules. Around Warrington, the plan update is the main route for now, and in Halton the review is.
- Previously developed land. Former yards, farm buildings and commercial sites, which national policy supports inside and outside settlements.
- Neighbourhood plans. Many Cheshire parishes and towns have neighbourhood plans, and some allocate small sites.
- Sites near stations. National policy now supports higher density homes within walking distance of well-connected stations. Whether a Cheshire station qualifies depends on its service and travel-to-work area.
- Council position
- Delivery more than double the requirement, but supply short of five years
- Constraints
- Outside the Green Belt and outside the Jodrell Bank buffer zone, a brook along one edge in Flood Zone 3
- Likely route
- An application under policy S5 while supply is short, with the land also put forward to the new Cheshire East local plan
- Your costs
- None. Every planning cost, including any appeal, is paid by us
- What we would offer
- An option agreement at an agreed price, with the planning costs paid for you and a term long enough to see the plan through
An illustration of how we think about a site, not a real offer. Every site is different, and our free desktop review looks at the specific field.
The timing matters in Cheshire. Three new plans and Halton's review are under way, and the early stages are when sites are gathered and assessed. The planning work needed to bring land forward properly is paid for under our agreements. See what we buy for the types of land we look at.
Questions About Selling Land in Cheshire
All four councils are over target. Can I still get planning?
Yes. Passing the delivery test does not mean a council has five years of land. Both large councils are short, so well placed land outside the Green Belt can have a case now, and their new plans will need sites. At 5.13 years, most open land in Warrington is for the plan update unless a new statement falls below five years. Halton reports more than five years too, so open fields there usually wait for its review.
Is Green Belt land near Wilmslow ever worth pursuing with you?
Yes. Some land there has already been released through plans, and some may count as grey belt. We look at the council's Green Belt evidence and how your land performs.
What is the Jodrell Bank buffer zone?
An area around the observatory where development has to show it will not interfere with the telescopes. It is a real constraint, and we check it first for land in that part of Cheshire East.
Does Halton come under this page?
Yes. Halton, covering Widnes and Runcorn, is one of the four councils here, with its delivery result in the table on this page, and its own page sets out its 2022 plan, Green Belt and flood risk in detail.
How long will it take?
Where the route is a new local plan, often four to seven years. Our guide on how long planning takes explains the stages.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
Selling Land in Cheshire? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
Sources
- GOV.UK: Housing Delivery Test, 2025 measurement
- Planning Inspectorate: Local plans, monitoring progress
- Cheshire East Council: Local plan timetable
- Cheshire East Council: Housing land supply
- Cheshire East Council: Local Plan Strategy policy PG 3, Green Belt
- Cheshire East Council: Policy HER 9, Jodrell Bank World Heritage Site
- Planning Inspectorate: Appeal decision APP/R0660/W/25/3374597, land at Prestbury Road, Macclesfield (10 August 2026)
- Planning Geek: Cheshire East backs 293 Wilmslow homes on safeguarded land (17 September 2026)
- Cheshire West and Chester Council: Local plan timetable
- Cheshire West and Chester Council: Housing Land Monitor Summary Report 2026 (4 September 2026)
- Warrington Borough Council: Warrington Local Plan 2021/22 to 2038/39 (adopted December 2023)
- Warrington Borough Council: Annual Monitoring Report 2025 (December 2025)
- Warrington Borough Council: Updating Warrington's Local Plan
- Planning Inspectorate: Report on the examination of the Halton Delivery and Allocations Local Plan (22 February 2022)
- Halton Borough Council: Authority Monitoring Report Housing 2026 (June 2026)
- Halton Borough Council: Local Plan (Review), Call for Sites 2025 (August 2025)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.
Other Counties We Cover
29 counties, 188 councils
57 of those councils are below 75% in the government's Housing Delivery Test 2025. Point to a county to see its figures.
Cheshire
4 councils, none of them built fewer than 75% of the homes needed in the government's latest count.
You are viewing this county- Oxfordshire
- Buckinghamshire
- Hampshire
- Surrey
- Kent
- Cambridgeshire
- Bedfordshire
- Hertfordshire
- Essex
- Warwickshire
- Worcestershire
- Northamptonshire
- Leicestershire
- Nottinghamshire
- Derbyshire
- Gloucestershire
- Wiltshire
- West Sussex
- Berkshire
- Suffolk
- Norfolk
- East Sussex
- Staffordshire
- Rutland
- Herefordshire
- Shropshire
- West Midlands
- Lincolnshire