Selling Land in High Peak

Checked on

High Peak Borough Council plans only for the part of the borough outside the Peak District National Park: five market towns from Glossop to Buxton and the villages between them, with Green Belt across the north. Its plan dates from April 2016, and in April 2026 its officers put the housing land supply at 2.78 years, still counting sites as they stood at 1 April 2023 but measured against the government's newer housing formula. On that basis the council approved up to 180 homes on open countryside at Chapel-en-le-Frith, land its officers said they would oppose in principle if five years could be shown.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in High Peak and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

High Peak can show 2.78 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from April 2016, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in High Peak

  • Fields of 2 acres or more on the edge of Buxton, Chapel-en-le-Frith or Whaley Bridge, outside the Green Belt and outside the National Park.
  • Land beside the larger villages, such as Dove Holes, Peak Dale or Chinley, that sits well against the existing houses.
  • Green Belt land in the north of the plan area that is enclosed by roads or building and may qualify as grey belt.
  • Former mills, works, yards and depots, which national policy supports reusing, in or out of the Green Belt.
  • Plots and backland inside the settlement boundaries of the five market towns.
  • Larger holdings that could be put forward for the plan to 2041.

Land inside the park boundary faces a much narrower path, and we will say so plainly in our review. For land that fits, we meet every planning cost, from the first surveys through to any appeal, and the price is fixed in an option agreement at the outset, above the land's current value. You keep farming or letting the land meanwhile, and if permission is not secured you keep it and owe nothing. Farmers may find our farmland page a useful starting point.

Is Your Land in High Peak a Good Fit?

You do not need to know the planning rules to sell land for development in High Peak. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in High Peak

There are three common ways to sell land with development potential in High Peak. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in High Peak: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in High Peak and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in High Peak

Three things shape the chances of selling land for development in High Peak: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    121%

    Meeting its housing requirement.

  • Five-year housing land supply

    2.78 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2023, measured against the standard method, 567 homes a year, plus a 5% buffer (2,977 homes over five years), applied to the supply identified at 1 April 2023. Stated by High Peak Borough Council (officer report to the Development Control Committee, 20 April 2026, citing the March 2025 interim position statement).

    Checked source
  • Homes built against homes needed

    903

    of 749 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    April 2016

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    No recent stage listed

    Check the council's website for its timetable.

See how High Peak compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Five Market Towns on the Edge of the Park

Much of High Peak lies inside the Peak District National Park, and the council's adopted Local Plan applies only to the land outside it, home to around 83,000 people when the plan was adopted. The plan splits that land into three sub-areas that its monitoring reports still use: Glossopdale in the north, the Central area around Chapel-en-le-Frith, New Mills and Whaley Bridge, and Buxton in the south.

  • Five market towns. Policy S2 names Buxton, Glossop, Chapel-en-le-Frith, New Mills and Whaley Bridge, followed by eight larger villages: Charlesworth, Chinley, Dove Holes, Furness Vale, Hadfield, Hayfield, Peak Dale and Tintwistle.
  • A plan from April 2016. The High Peak Local Plan runs from 2011 to 2031 and set a target of 350 homes a year, 7,000 in all. The council's 2023 review document lists three of its policies as out of date, including S3 on housing numbers and H4 on affordable housing.
  • Delivery above the test's target. Across April 2022 to March 2025, the borough built 903 homes to a requirement of 749, a result of 121% in the Housing Delivery Test 2025.
  • Green Belt across the north. The plan describes the North West Derbyshire Green Belt extending across the northern and north central parts of the plan area, and the 2023 review document counts nearly 4,000 hectares of it.
  • Building in all three sub-areas. The monitoring report for 2024/25 counts 3,646 net new homes since 2011, split between Glossopdale (30%), the Central area (37%) and Buxton (33%).

So in High Peak the first question about any field is not its price or its size but which of three regimes it falls under: the National Park, the Green Belt, or the open countryside outside both. The answer changes almost everything that follows.

Selling Land in High Peak: Which Land the Borough Council Decides

The Peak District National Park Authority is the planning authority inside the park boundary, and its guidance for applicants sends anyone outside the boundary to the local council, listing High Peak among them. Outside the park the borough decides, and the land it controls is judged in quite different ways depending on where it sits:

Drawn from the Peak District National Park Authority, the High Peak Local Plan 2016 and the August 2026 national framework.
Where the land isWho decidesHow housing is judged today
Inside the National ParkPeak District National Park AuthorityNational policy gives National Parks the highest status of protection in relation to landscape and scenic beauty, so general housing on open land is rarely possible.
Green Belt in the north and north centre of the plan areaHigh Peak Borough CouncilPolicy S5 does not apply. Homes need the land to be grey belt or previously developed, and grey belt housing must meet a need test.
Countryside outside both the Green Belt and the parkHigh Peak Borough CouncilThe supply shortfall counts as evidence of unmet need under policy S5, to be weighed against the harm rather than treated as an automatic finding.
Inside a settlement boundaryHigh Peak Borough CouncilPolicy S4 leans towards approval unless the harm substantially outweighs the benefits.

For an owner selling land for development in Glossopdale, the Green Belt row is usually the one that applies, while around Buxton and Chapel-en-le-Frith the countryside row comes up more often, as it did at Crossings Road.

Only one change to the Green Belt came with the 2016 plan: the council concluded there was no net benefit in wider boundary changes and removed only some land at Furness Vale, to allow housing. Everywhere else the line drawn before 2016 still holds, which is why the grey belt test matters so much in the north of the plan area. Our grey belt guide explains how a field is judged against the purposes of the Green Belt and the need test that follows.

From 260 Homes a Year to 567, and What It Means for Selling Land

When the council opened its plan review in January 2023, its early engagement document put local housing need under the government's standard method at 260 homes a year, below the adopted plan's 350. Its last full supply statement, published in November 2023 with a base date of 1 April 2023, used the updated figure of 246 a year and counted 1,653 deliverable homes: 426 on large sites with permission, 182 on small sites, 883 on plan allocations, 140 from small windfall sites and 22 as an allowance within the National Park. That came to 6.4 years. The December 2024 version of the method more than doubled the yearly figure. Because the plan is more than five years old, national policy requires supply to be tested against the government's number, and the council has since measured the same count against it twice without recounting the sites:

Base date 1 April 2023 in every column. Sources: High Peak Borough Council supply statements of November 2023 and March 2025, and the officer report on application HPK/2025/0447 to the Development Control Committee of 20 April 2026.
StepNovember 2023 statementMarch 2025 interim statementApril 2026 committee report
Yearly need246 homes553 homes567 homes
Five years with a 5% buffer1,292 homes2,903 homes2,977 homes
Deliverable supply1,653 homes1,653 homesNot restated
Result6.4 years2.85 years2.78 years

The newest figure comes from the officer report on Crossings Road, which attributes to the council's March 2025 interim statement a need of 567 homes a year, 2,977 over five years, and a supply of 2.78 years. The interim statement itself gives 553 a year and 2.85 years, and the report does not explain the higher yearly figure. Nor does it restate the supply, but its result matches what the 1,653 homes counted at 1 April 2023 give: 2,977 homes over five years is 595 a year, and at that rate 1,653 homes last 2.78 years.

So the council's position rests on sites as they stood three and a half years ago. The interim statement said the next statement would be measured at 1 April 2025, and the council's monitoring page does not list one as of September 2026. More than half of the counted supply, 883 of the 1,653 homes, rests on plan allocations rather than on sites with permission.

Building Has Slowed Since the Peak

The council's monitoring report for 2024/25, published in December 2025, records net completions of 498 in 2017/18, 426 in 2022/23, then 268 in 2023/24 and 198 in 2024/25. The last is just over a third of the yearly need officers now use. A fuller statement may count newer permissions, but with completions at that level it would need a very large pipeline to reach five years against 567 a year. Affordable homes show the same gap: the Crossings Road report puts the borough's need at 526 a year, against an average of 74 delivered each year between 2016 and 2024.

If you are thinking of selling land in High Peak, those falling completions are the background to any application: the borough is building well under the yearly need its own officers now use.

Crossings Road: A Shortfall at Work in Chapel-En-Le-Frith

On 20 April 2026 the council's Development Control Committee approved BDW Trading's outline application HPK/2025/0447 for up to 180 homes on about nine hectares of sheep pasture on the western edge of Chapel-en-le-Frith. The officer report is plain about the land: it lies outside the built-up area boundary, in open countryside, is not allocated and conflicts with the development plan. The parish council called it an unallocated urban extension beyond the settlement boundary, and 288 objections were received.

Four Tests in Policy H1, and the One It Failed

Policy H1 of the 2016 plan lets the council consider sustainable sites beyond a built-up area boundary only where all four of its tests are met:

  • Adjoining and well related. The land adjoins the boundary, fits the existing pattern of development and suits the settlement's scale.
  • No prominent intrusion. It does not intrude prominently into the countryside or harm its character significantly.
  • Reachable services. Schools, doctors and shops can be reached on foot, by bike or by public transport.
  • Infrastructure. Local and strategic infrastructure can meet the extra demand.

Crossings Road adjoins the town on its south-eastern side and has houses on three sides, and officers found it passed three tests but failed the second, because of its spread into open fields west of Crossings Road. They were clear that it "would not be supported as a matter of principle" if the council could show five years of supply. Without it, the council applied the presumption in favour of sustainable development in the December 2024 framework then in force, the so-called tilted balance, under which permission is granted unless the harm significantly and demonstrably outweighs the benefits. Officers judged the landscape and visual harm moderate and permanent, set it against up to 180 homes, 54 of them affordable, and construction work and local spending, and recommended approval. The committee agreed.

The same land shows how much the supply position matters. An application for a single house there was refused in January 2023, and an inspector dismissed the appeal in February 2024, when, as the report notes, the council could show five years and its housing policies carried full weight. Officers took the same approach on five bungalows off Brown Edge Close in Buxton, approved at the same meeting, where they treated policies S2, S3, H1 and EQ3 as out of date for want of a five-year supply.

The August 2026 framework now puts land beyond a settlement's edge under policy S5, where a supply shortfall is evidence of unmet need to be weighed against the harm, not an automatic finding, and S5 does not reach the Green Belt. Crossings Road carried no protective designation of the kind national policy lists, which is what allowed the balance to be struck at all.

What the Permission Carries

The report sets out what the legal agreement and conditions secure:

  • Affordable homes. 30%, or 54 homes: 43 for social rent and 11 for shared ownership, all to national space standards.
  • Schools. Up to £1,001,394.24 for 32 extra places at Chapel High School, which has 943 pupils on roll against a capacity of 925, and up to £171,127.13 for special educational needs places. The 45 primary pupils fit at the town's primary school, so nothing was sought for them.
  • Health. Up to £180,000 for GP practices in the Goyt Valley.
  • Recreation. Play areas on site, plus £204,168 towards the Memorial Park, allotments, a grass pitch and a 3G pitch.
  • Travel. £10,000 to monitor a travel plan and a £102,600 bond, payable to the county council when work starts.
  • Nature and heritage. A 10% biodiversity gain on site, monitored for 30 years, and the northern field beside three Grade II listed cottages kept free of building.

That is more than £1.6 million, counting the bond, on top of the affordable homes and the land given to open space. Our guide to Section 106 and CIL explains how these sums are set, and we build them into our assessment from the start. The wider lesson is that a well related field outside the Green Belt, on the edge of a market town, can succeed in High Peak today without an allocation, because the missing supply carries real weight in the balance. With five years in place, the same field would have been opposed in principle.

Selling Land Near Buxton: Phosphorus and the River Wye

Part of the borough drains to the River Wye, within the Peak District Dales Special Area of Conservation. Since Natural England's advice letter of March 2022, the council's nutrient neutrality page says new homes in that catchment, including tourist accommodation and pitches, must show they add no extra phosphorus to the river. The council points applicants to Defra's Magic map to check the catchment boundary.

  1. Check the catchment. A field outside it is unaffected; a field inside it needs a nutrient budget from the outset.
  2. Look at the council's own mitigation. Its High Peak Upgrade scheme replaces old septic tanks and treatment plants in the catchment, and a High Peak Phosphorus Credits scheme is being developed, with details still to be published.
  3. Allow for time. The 2024/25 monitoring report notes that discussions on nutrient neutrality were still going on with the developer of a site at West Tongue Lane in Buxton.

The Brown Edge Close scheme in Buxton shows how this works on a small site. The council's assessment found that the five bungalows, inside the catchment, would add 1.44 kg of phosphorus a year once a 20% margin was included. The answer lay off the site: the applicants agreed to upgrade a septic tank serving five existing homes to a package treatment plant, worth 3.90 kg a year, through a legal agreement the owners of those homes agreed in principle to sign, with the work finished before building starts. The committee deferred the scheme in February 2026 to look again at access, drainage, land stability and the nearby railway, then approved it in April after a motion to refuse was lost. Crossings Road, by contrast, lies outside the catchment, and nutrients were screened out of its assessment altogether.

Nutrient neutrality does not stop a site, but it adds cost and time to any scheme inside the catchment. We carry both, and they are part of our assessment before we make any offer.

When to Sell Land in High Peak, With a Plan to 2041 Running Behind Its Timetable

The council's Local Development Scheme of January 2026 keeps the review under the current plan-making system, before the new one takes effect, and cites both the national reforms and reorganisation as reasons for the timetable:

From the High Peak Local Development Scheme 2026. These are the council's target dates.
StageCouncil's timetable
Early engagementJanuary to March 2023 (held)
Draft plan consultation (Regulation 18)First quarter of 2026
Proposed submission consultation (Regulation 19)Fourth quarter of 2026
Submission for examinationFourth quarter of 2026
ExaminationSecond quarter of 2027
AdoptionFirst quarter of 2028

The council's plan review page still shows only the 2023 early engagement, which drew 99 comments, and no draft plan, so the first quarter of 2026 has passed without the draft stage; in April 2026 officers described the emerging plan as in its infancy, too early to count in decisions. The council did invite fresh site suggestions, with a deadline of 2 July 2026, and said that sites put forward since January 2023 need not be resubmitted unless something has changed. The later dates are likely to move, but the order will not: the draft plan is the first real sight of which sites the council prefers, and evidence prepared before then carries most weight. For the stages in order, and what an owner can do at each, see our guide to how a site enters a local plan.

A Gap Still to Be Recounted, and a Merger on Hold

The next full supply statement will show whether permissions such as Crossings Road have narrowed the gap; until one appears, decisions rest on the count made at 1 April 2023. The Housing Delivery Test 2025, released on 17 August 2026, leaves the borough at 121% with none of its consequences applying, though with completions falling the next results are worth watching. The thresholds sit well below the current result: 95% for an action plan, 85% for the heavier 20% supply buffer, and 75% for the point at which national policy stops asking for proof of unmet need.

The government's July 2026 decision would have folded High Peak into a new Derbyshire North Council from April 2028, and the borough's reorganisation page records that on 7 September 2026 the government paused that decision to review it, with no timescale known. There are no immediate changes to services, and High Peak Borough Council still decides applications and prepares the plan.

Countryside Now, Green Belt on Two Tracks, Park Land Rarely

  • Countryside outside the Green Belt and the park has its strongest case now, while the shortfall lasts and before a new plan with fresh allocations is adopted.
  • Green Belt land in the north can be looked at as possible grey belt now, and put forward for the new plan at the same time.
  • Land inside the park rarely suits general housing, whatever the borough's numbers.

The rest of the county is covered on our Derbyshire page.

Questions About Selling Land in High Peak

Near Buxton, how can I tell whether the borough council or the Park Authority would decide an application?

It depends on which side of the National Park boundary the land sits. The Park Authority publishes a boundary map, and applications outside it go to High Peak Borough Council. We check this first in any review.

The council built more than its target. Why does it say it is short of land?

Because its plan is more than five years old, supply is tested against the government's standard method, which officers put at 567 homes a year in April 2026, more than double the 260 the council recorded in 2023. Against that, the homes it counted at 1 April 2023 come to 2.78 years.

Does the shortfall help a field in the Green Belt near Glossop?

Not directly, as policy S5 does not apply in the Green Belt. But the shortfall does meet the need test for grey belt housing, so a field that does not strongly serve Green Belt purposes can have a case. Larger schemes must also meet the Golden Rules.

I missed the July 2026 deadline for site suggestions. Is that the end of it?

No. The draft plan consultation is still to come, and land can be put forward and argued for then. Where we take a site on, we prepare the evidence and make the case.

Can land that drains to the River Wye still be developed?

It can, but new homes there must be nutrient neutral, which means showing no extra phosphorus reaches the river. The council runs a septic tank upgrade scheme and is developing phosphorus credits. We take on that work and its cost.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in High Peak Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where High Peak stands on housing shapes which matter most here.

Selling Land in High Peak? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Derbyshire

  • County overview

    Selling Land in Derbyshire

    Sell land for development in Derbyshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 90% of need

    Selling Land in Derbyshire Dales

    Sell land in Derbyshire Dales. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 49% of need

    Selling Land in Erewash

    Sell land in Erewash, near Ilkeston. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 173% of need

    Selling Land in Amber Valley

    Sell land for development in Amber Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 205% of need

    Selling Land in Bolsover

    Sell land for development in Bolsover: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 168% of need

    Selling Land in Chesterfield

    Sell land for development in Chesterfield: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 268% of need

    Selling Land in North East Derbyshire

    Selling land in North East Derbyshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 195% of need

    Selling Land in South Derbyshire

    Sell land in South Derbyshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 71% of need

    Selling Land in Derby

    Sell land in Derby, near Allestree. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Derbyshire