Derbyshire council area
Selling Land in Amber Valley
Checked on
Amber Valley adopted its first new local plan since 2006 in March 2026 and has already started the next one, to run to 2044. The council shows 5.8 years of housing land against the new plan's 434 homes a year, a figure well below the government's own for the borough, and the plan itself allows homes on land beside towns and villages outside the Green Belt, subject to its tests, without waiting for an allocation.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Amber Valley and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Amber Valley can show 5.8 years of housing land, more than the five years national policy expects, and built 173% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from March 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Amber Valley
- Fields adjoining the towns or key villages outside the Green Belt, which policy H1 can support now.
- Plots, gardens and backland inside Belper, Ripley, Alfreton, Heanor or the key villages such as Duffield, Crich and Kilburn.
- Former works, yards and depots in the Green Belt around Belper, Heanor and Ripley.
- Larger holdings near Derby's western and northern edge, where the city's need is being planned for.
- Land within walking distance of Belper, Duffield, Alfreton or Langley Mill station.
- Farmland away from the settlements that could be put forward to the new plan.
For land headed for the new plan, the evidence the council will ask for, on access, drainage, ecology and landscape, is the work we pay for in full. Our option agreement fixes the price at the outset, higher than the land's present value, and you keep farming or letting it meanwhile. Should consent not come, you keep the land and pay us nothing. The agreement runs on for as long as an application or appeal is being decided.
Is Your Land in Amber Valley a Good Fit?
You do not need to know the planning rules to sell land for development in Amber Valley. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Amber Valley
There are three common ways to sell land with development potential in Amber Valley. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Amber Valley: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Amber Valley and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Amber Valley
Three things shape the chances of selling land for development in Amber Valley: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
173%
Meeting its housing requirement.
Five-year housing land supply
5.8 years
Five years or more of deliverable housing land. Position at 1 April 2026, measured against the adopted Local Plan requirement of 434 homes a year, plus a 20% buffer. Stated by Amber Valley Borough Council.
Checked sourceHomes built against homes needed
1,887
of 1,091 needed, April 2022 to March 2025
Most recent strategic plan adopted
March 2026
The plan currently used to decide applications.
New plan progress
Latest step
Local Plan 2022 to 2040 adopted March 2026; new plan to 2044 started June 2026
Checked source
See how Amber Valley compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Belper, Ripley, Alfreton and Heanor, With Derby at the Door
Amber Valley Borough Council is based at Ripley Town Hall and covers more than 265 square kilometres north of Derby, home to 126,200 people at the 2021 census. Its four market towns are Alfreton, Belper, Heanor and Ripley, and the adopted Local Plan adds a fifth urban area to its settlement hierarchy: land within the borough that forms part of the built framework of Derby. Seventeen key villages sit below them, among them Duffield, Ambergate, Crich, Kilburn, Horsley Woodhouse and South Wingfield.
- A new plan after a long examination. The Amber Valley Borough Local Plan 2022 to 2040 was submitted on 29 July 2024 and examined at hearings from 10 to 19 December 2024. The inspectors' report, by Anne Jordan and Alison Partington, is dated 10 February 2026, and the council adopted the plan on 2 March 2026, replacing the plan of 2006.
- Delivery well above target. Over April 2022 to March 2025, 1,887 homes went up where 1,091 were required, a result of 173% in the Housing Delivery Test 2025.
- Six stations. The plan lists Alfreton, Ambergate, Belper, Duffield, Langley Mill, which serves Heanor, and Whatstandwell.
- A World Heritage town. The plan describes Belper as the only town in the East Midlands that lies within a World Heritage Site, the Derwent Valley Mills.
- Green Belt in the south and east. It largely surrounds Belper, Heanor and Ripley and runs up to the southern edge of Alfreton.
Two numbers explain most of what follows. The adopted plan asks for 434 homes a year. The government's standard method, as the Derby housing market councils record it in their latest joint statement, asks for 643. The gap between them shapes the supply calculation today and the size of the task the next plan faces.
What a 434-Home Yardstick Means for Selling Land in Amber Valley
The council's summary of housing need and supply covers the five years from 1 April 2026 to 31 March 2031 and is the first measured after the plan's adoption. It sets out the sum in plain terms:
| Step | Council's figure |
|---|---|
| Yearly requirement | 434 homes, from the Local Plan 2022 to 2040 |
| Five years at that rate | 2,170 homes |
| Buffer | 20%, adding 434 homes (see below) |
| Five-year requirement with buffer | 2,604 homes |
| Large sites with planning permission | 2,441 homes |
| Local Plan allocations | 42 homes |
| Small sites with permission, 2026/27 to 2028/29 | 490 homes |
| Small site windfalls at 85 a year, 2029/30 to 2030/31 | 170 homes |
| Less an allowance for lapsed permissions | 119 homes, at 3.77% a year |
| Deliverable supply | 3,024 homes |
| Result | 5.8 years |
That leaves a margin of 420 homes over the buffered requirement. Almost all of it rests on sites that already have permission: the plan's own allocations add only 42 homes in these five years.
A 20% Buffer That Says Nothing About Delivery
Elsewhere a 20% buffer is a penalty for building too slowly. Here it has another cause. The council applies it under the rule national policy has used for decisions since 1 July 2026, because its requirement was adopted within the last five years, was examined under a version of national policy older than December 2024, and is below 80% of the borough's need under the standard method. In other words, the buffer is there because the plan asks for so much less than the government's figure. Delivery at 173% would otherwise allow the smallest buffer of 5%.
The council's statement for 1 April 2025, measured while the plan was still at examination, used the same 434 homes a year with a 5% buffer and counted 3,370 homes against 2,279, or 7.39 years; the inspectors, working from the same figures, found well over seven years. Between the two statements the buffer rose from 5% to 20%, and large sites with permission fell from 2,769 homes to 2,441.
Why 434 and Not 424
The Derby housing market area statement of common ground, prepared mainly in autumn 2025 and signed for Amber Valley, Derby City, South Derbyshire and Derbyshire County councils, records Amber Valley's requirement as 424 homes a year, 7,632 over 2022 to 2040, including 1,320 for Derby. The inspectors' report explains the adopted figure. The plan as submitted asked for 6,564 homes from 2022. The inspectors used the updated standard method figure for 2024, 351 homes a year, and moved the start of the requirement to 2024, so that homes built earlier were not counted twice. Sixteen years at 351, plus 1,320 for Derby, comes to 434 a year after rounding, or 6,944 homes to 2040. The 424 is the same two parts spread over eighteen years from 2022: 351 for eighteen years plus 1,320, divided by eighteen, rounds to 424. On either figure the 3,024 homes clear five years.
Why the Comfortable Margin Is Not the Whole Story
The plan records that the December 2024 standard method lifted the borough's need from 351 to 615 homes a year, and the joint statement now gives 643. Because 434 is below 80% of that, the plan commits the council to a new plan under the new system. Put the council's 3,024 homes against 643 a year with only a 5% buffer, and five years would call for 3,376. The plan's yardstick stands until it is replaced or turns five in March 2031, so that sum does not apply today. National policy adds that while a council shows five years, buffer included, and passes the delivery test above 75%, a higher standard method figure is not in itself evidence of unmet need under policy S5 for five years from the plan's adoption. The sum does show how much more land the next plan will have to find.
If you are thinking of selling land in Amber Valley, that larger figure is the reason to look past today's comfortable supply: the next plan will need more sites than the last one, and it will favour land whose evidence is ready.
Brun Lane: From 2,000 Homes to an Area for Future Growth
Derby cannot fit its own need inside its boundary. The statement of common ground puts the city's capacity at 12,500 homes against a need of 18,340 over 2023 to 2043, a shortfall of 5,840, and says the best places to meet it within Amber Valley and South Derbyshire are on the city's edge. South Derbyshire takes 4,867 of those homes and Amber Valley 1,320.
Amber Valley's share was meant to come from about 2,000 homes on fields off Brun Lane at Mackworth, west of the city, 1,320 of them by 2040. The inspectors accepted that the area is relatively unconstrained and well related to Derby, but the main landowner told them it no longer wished to develop that many homes and would release land for around 500. That, in their view, risked piecemeal building without the infrastructure a scheme of this size needs. The council said compulsory purchase could secure the land. The inspectors had no evidence that the circumstances for it existed, could not conclude the land would be available when the council expected, and took the reference to compulsory purchase out of the plan.
The allocation was removed and replaced by an Area for Future Growth. Policy SGS1 now gives the area potential for 2,000 homes beyond the plan period, to be planned through a masterplan prepared with neighbouring councils, South Derbyshire among them, with a secondary school, primary places, a neighbourhood centre and access from the A52 and the B5020 or Brun Lane. Building is to avoid ridge and furrow, high ground and land beside the Mackworth Conservation Area, and to respect views to and from Kedleston Hall. The plan says delivery is not expected until the latter part of the plan period and that the council does not rely on the area in its housing supply. Derby's 1,320 homes stay in the requirement all the same: the inspectors found that sites cannot in reality be ring-fenced for another district's needs, and kept the figure as a pragmatic first step.
Where the Plan's Homes Come From Instead
Without Brun Lane, the plan provides for at least 7,656 homes between 2024 and 2040 against its requirement of 6,944, about 10% more. Most are already in hand: 819 built in 2024/25, 4,083 on large sites with permission and 529 on small ones, 284 on neighbourhood plan sites and 1,020 expected from small windfall sites, leaving 921 on the plan's own allocations without permission. The allocations total 1,026 homes, and the main ones are:
- Land north of Derby Road, Denby (Cinderhill): 300 homes and 30 hectares of business and industrial land on former mining and clay workings, released from the Green Belt in 2006, with the heavily contaminated tar pits beside it left out. When the inspectors reported, the council had resolved to approve an outline application subject to a legal agreement not yet signed, and they judged homes there around 2030 credible.
- Thirteen smaller sites of 10 to 180 homes, the largest being Aldreds Lane in Heanor, with 180, and Alderwasley Mills at Ambergate, with 140.
The inspectors also struck out four employment sites, at Cotes Park Lane West and Wimsey Way in Somercotes, Slack Lane in Heanor and Denby Hall, leaving 77.93 hectares of land for business and industry against a requirement of 57.27.
For an owner near Mackworth, Kirk Langley or Kedleston, the lesson is that a site is judged on whether it can actually be delivered, not only on where it sits. Evidence that the land is available, with willing owners and a way in for the roads, is what the Brun Lane allocation lacked.
Selling Land Beside the Towns: The Green Belt and Policy H1
The Green Belt wraps Belper, Heanor and Ripley and reaches Alfreton's southern edge. The adopted plan makes one change to it, taking out a site off High Holborn Road at Codnor for two Gypsy and Traveller pitches; the inspectors deleted a proposal to take out the Denby Hall business park extension as well. Inside the Green Belt, policy SS8 grants permission only in line with national policy and the plan's other policies.
Policy H1: Homes Beside a Town or Village
The adopted plan draws no settlement boundaries. Its housing policies turn instead on the "built framework", which it defines as the limits of continuous or contiguous development forming the existing built-up area of a settlement. Inside that line, homes are permitted in the towns and key villages, and in more limited forms in the smaller villages. Beyond it, policy H1 also permits housing on land adjacent to the built framework of the four towns, the key villages and the borough's part of Derby, where all three of its tests are met:
- Proportionate. Its scale and character suit the settlement and its place in the hierarchy, allowing for other schemes and the landscape setting.
- Sustainable. It is within reach of services and facilities, or improves them.
- Serviced. There is enough infrastructure, existing or planned, to support it.
Policy H2 applies the same tests to land beside the smaller villages. The inspectors found this approach justified, and the plan counts on it: its supply includes 85 homes a year from small windfall sites, which the inspectors accepted partly because H1 and H2 are generally supportive of new housing within and next to settlements. None of this overrides the Green Belt, where policy SS8 and national policy still decide.
So the five-year supply matters less here than in many districts. Policy S5 of the national framework needs evidence of unmet need, and with delivery at 173% and a supply above five years that evidence is absent today, but H1 does not ask for it. A field that sits properly against a town or key village, outside the Green Belt, can be put forward now on the plan's own terms.
For an owner selling land for development on the edge of a town or key village here, the case therefore rests on the three tests of H1 (proportion, services and infrastructure) rather than on the council's supply figure.
Where the Green Belt Applies
Grey belt housing carries its own need test, usually met where supply falls below five years or the delivery test result drops under 75%, and neither is the case today. The routes that remain open in the Green Belt are narrower:
- Inside the towns and villages. Gardens, plots and backland within Belper, Ripley, Alfreton, Heanor and the key villages come under national policy S4, so the council should say yes unless the harm from building there would substantially outweigh its benefits.
- Old works and yards. Where lawful buildings or hard surfacing already stand, as on an old works, yard or depot, national Green Belt policy judges the site apart from open fields, and the supply figure plays no part. Farm buildings in agricultural use do not count.
- Rural exception sites. Small affordable schemes that meet a proven local need, normally shown by a parish or village survey, which the plan expects on low value farmland.
- The new plan. Open Green Belt fields will be decided through the 2026 to 2044 plan.
Our page on paddocks and small sites covers the smaller routes in more detail, and the grey belt guide explains the need test that grey belt housing has to meet.
Affordable Housing by Value Zone
Policy H5 sets affordable housing on schemes of ten or more homes by the value of each area: 40% in the rural parishes of the higher value zone, such as Crich, Kirk Langley, Quarndon and South Wingfield; 30% in the Belper area, which takes in Duffield, Denby, Holbrook and Kilburn; and 20% around Alfreton, Heanor and Ripley. Brownfield sites of 10 to 19 homes in the lower zone carry 10%. Close to Derby, the affordable homes may be shaped to the city's needs. A field outside Crich and one outside Heanor can therefore support very different schemes, and we allow for that from the first assessment.
A Borough the July Decision Would Split in Two
On 16 July 2026 the government chose to replace Derbyshire's ten councils with two unitary councils from April 2028, and to divide Amber Valley between them. The borough council said it was disappointed, as splitting the borough had drawn the least support in consultation.
| Proposed council | Amber Valley parishes |
|---|---|
| Northern council (21 parishes) | Including Alfreton, Ripley, Heanor and Loscoe, Aldercar and Langley Mill, Codnor, Crich, Ironville, Somercotes, Swanwick, South Wingfield, Pentrich and Alderwasley |
| Southern council, with Derby, Erewash and South Derbyshire (14 parishes) | Belper, Denby, Duffield, Holbrook, Horsley, Horsley Woodhouse, Kedleston, Kilburn, Kirk Langley, Mackworth, Mapperley, Quarndon, Shipley and Smalley |
On 7 September 2026 the government paused the Derbyshire decision for review, while saying that reorganisation had not ended. If the split does return, Belper, Duffield and Mackworth would share a council with Derby, the city whose unmet need the next plan is to seek to address. For now Amber Valley Borough Council decides every application in the borough, and the adopted plan applies throughout it.
For an owner selling land in Belper, Duffield or Ripley, the paused split changes nothing about how a site is judged today: the 2026 plan and its policy H1 still apply, whichever council follows.
When to Sell Land in Amber Valley: The 2044 Plan and the 2026 Plan in Force
The council's adoption statement records that the adopted plan includes every main modification recommended in the inspectors' report, published on 13 February 2026, along with minor changes made by the council, and that it now carries full weight in deciding planning applications. The development plan for the borough is the new Local Plan, the Derby and Derbyshire minerals and waste local plans, and neighbourhood plans, but only those neighbourhood plan policies that are in general conformity with the new Local Plan. Where land sits in a parish with a neighbourhood plan, we read each of its policies against the 2026 plan. Anyone aggrieved by the plan had six weeks from the day after adoption to apply to the High Court on legal or procedural grounds, a window that closed in mid-April 2026.
A 2044 Plan With a Spring 2027 Consultation
The adopted plan requires the council to prepare and submit a new plan under the new plan-making system, and to use it to address any unmet housing need in the Derby housing market area. The council gave notice on 19 June 2026 that it was starting the Amber Valley Local Plan 2026 to 2044 and ran a scoping consultation in July and August. It has said it will keep to its published timetable despite reorganisation. The stages ahead:
| Stage | Council's timetable |
|---|---|
| Gateway 1 self-assessment | 21 October 2026 |
| Consultation on plan content and evidence | 5 April to 24 May 2027 |
| Gateway 2 advice | 21 June 2027 |
| Consultation on the proposed plan | 22 March to 26 April 2028 |
| Submission to the Secretary of State | 6 September 2028 |
| Adoption | 7 March 2029 |
The spring 2027 consultation is the first stage at which the plan's proposed content and evidence go out for comment. Land with its evidence ready before then is in the strongest position. Each of those stages, and what the council wants from an owner at it, is explained in our guide to how land enters a local plan.
Land can still be put forward. The council ran a call for sites in spring 2026, with a forum for developers, landowners and agents on 30 March. Its land availability page says sites can be submitted at any time and will be assessed in the next yearly update, so a site suggestion form sent now still counts. The most recent assessment on the council's website dates from January 2024, so the next edition should show how the spring 2026 submissions were judged.
The Adopted Plan as the Yardstick, and When to Act
The council has issued a statement for each April from 2022 to 2026. While the adopted plan is under five years old its 434 homes remain the yardstick, so the margin in the next statement will turn mainly on how many permissions are granted and built. Delivery is tested again every year, and the current Housing Delivery Test 2025 was published on 17 August 2026. At 173% none of the test's consequences applies; a result below 95% would bring an action plan, and below 85% a 20% buffer for a second reason.
For timing, that sorts land four ways:
- Fields beside a town or key village outside the Green Belt can be judged against policy H1 now.
- Old yards, works and plots within the towns stand apart from the housing numbers and can be looked at now.
- Open fields away from settlements, and Green Belt land, are best prepared for the April 2027 consultation.
- Holdings near Derby sit where both the city's need and any future council boundary point, and are worth an early conversation.
The wider county picture, including Erewash and the Dales, is on our Derbyshire page.
Questions About Selling Land in Amber Valley
Is land off Brun Lane at Mackworth allocated for housing?
Not as an allocation. The adopted plan identifies an Area for Future Growth there, with potential for 2,000 homes beyond 2040, to be planned through a masterplan with the neighbouring councils, and the council does not count it in its housing supply. Its future will be settled through the new plan to 2044, where, as the examination showed, evidence that the land is available counts for a great deal.
I missed the 2026 call for sites. Can I still put my land in?
Yes. The council accepts site suggestions at any time and assesses them in the next yearly update of its land availability assessment. Where we take a site on, we prepare the map and the supporting evidence.
The council has more than five years of supply. Is an application on a field at the edge of a town worth making?
It can be. Policy H1 of the adopted plan permits homes on land adjacent to a town or key village where the scale suits the place, services are within reach and infrastructure can cope, whatever the supply. The catch is the Green Belt, which surrounds much of Belper, Heanor and Ripley. There the grey belt need test is hard to meet today, and the new plan is the likelier route.
Duffield would move to the southern council under the July plan. Does that change anything now?
No. The decision is paused, the borough council still decides applications, and the adopted plan applies across the whole borough until a new plan replaces it.
Why would a site near Ripley carry less affordable housing than one near Crich?
Policy H5 sets affordable housing by area value: 20% around Ripley, Alfreton and Heanor, 30% in the Belper area including Duffield, and 40% in rural parishes such as Crich. It changes what a scheme can support, and we build it into our assessment before any price is agreed.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Amber Valley Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in Amber Valley, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in Amber Valley? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Derbyshire
County overview
Selling Land in Derbyshire
Sell land for development in Derbyshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 49% of need
Selling Land in Erewash
Sell land in Erewash, near Ilkeston. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 90% of need
Selling Land in Derbyshire Dales
Sell land in Derbyshire Dales. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 205% of need
Selling Land in Bolsover
Sell land for development in Bolsover: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 268% of need
Selling Land in North East Derbyshire
Selling land in North East Derbyshire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 195% of need
Selling Land in South Derbyshire
Sell land in South Derbyshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 71% of need
Selling Land in Derby
Sell land in Derby, near Allestree. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 168% of need
Selling Land in Chesterfield
Sell land for development in Chesterfield: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 121% of need
Selling Land in High Peak
Sell land in High Peak, near Buxton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- Amber Valley Borough Council: Amber Valley Borough Local Plan 2022 to 2040 (adopted March 2026)
- Amber Valley Borough Council: Amber Valley Borough Local Plan 2022-2040, adoption statement (March 2026)
- Planning Inspectorate: Report on the examination of the Amber Valley Borough Local Plan 2022 to 2040, by Anne Jordan and Alison Partington (February 2026)
- Amber Valley Borough Council: Housing land supply as at 1 April 2026, summary of housing need and supply (2026)
- Amber Valley Borough Council: Housing land supply as at 1 April 2025
- Amber Valley Borough Council: Housing land supply
- Amber Valley Borough Council: New Local Plan 2026 to 2044
- Amber Valley Borough Council: Local Plan timetable (June 2026)
- Amber Valley Borough Council: Strategic Housing and Economic Land Availability Assessment and call for sites
- Amber Valley Borough Council: Update on local government reorganisation in Derbyshire (July 2026)
- Amber Valley, Derby City, South Derbyshire and Derbyshire County councils: Derby Housing Market Area Statement of Common Ground (February 2026)
- South Derbyshire District Council: Local government reorganisation, September 2026 update
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.