Cheshire council area
Selling Land in Halton
Checked on
Halton is the Liverpool City Region borough on both banks of the Mersey, with Widnes to the north, Runcorn to the south and Green Belt over about a third of its land. Its plan, adopted in March 2022, released some Green Belt, kept Daresbury village's fields in it and set a reserve aside. The council says it has more than five years of housing land but publishes no figure in years, and it has gathered sites for a review of the plan.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land in Halton and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Halton built 170% of the homes it needed in the government's latest count, but gives no current figure in years for its housing land supply, so we check where that stands for your land in our review. Sites within towns and villages are generally supported by national policy, and beyond them the case for a site turns on that supply position and the local plan. Its local plan dates from March 2022.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
Halton in Figures
The government's latest figures for the council, its latest five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
170%
Meeting its housing requirement.
Five-year housing land supply
Not published
No current figure published. Position at 31 March 2026. Stated by Halton Borough Council, which states in its Authority Monitoring Report Housing 2026 (base date 31 March 2026) that it has over five years of supply but gives no figure in years and no calculation.
Checked sourceHomes built against homes needed
1,113
of 656 needed, April 2022 to March 2025
Most recent strategic plan adopted
March 2022
The plan currently used to decide applications.
New plan progress
Latest step
Delivery and Allocations Local Plan 2014 to 2037 adopted 2 March 2022; the council ran a call for sites for a review of the plan until 5 December 2025, describing it as routine maintenance of the plan rather than a new local plan; its planning policy page gives no stages or dates for the review
Checked source
See how Halton compares with the other 166 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The Land We Look for in Halton
- Plots, backland and redevelopment sites within Widnes, Runcorn and Hale Village.
- Yards and former commercial land in the Green Belt around Moore, Daresbury, Preston-on-the-Hill or the edge of Widnes, with lawful buildings or hard standing.
- Fields beside the allocations in north Widnes, Halebank and east Runcorn that are enclosed by roads, homes or other development.
- Land mostly in Flood Zone 1, clear of the Ditton Brook and Keckwick Brook corridors and the tidal edge.
- Safeguarded land, and larger holdings the plan review could consider as it looks beyond the current allocations.
For land headed for the review, evidence on its Green Belt role, access, drainage and ecology is what counts, and early is better. That work is at our cost from start to finish. The option price is agreed when we sign and pitched above the land's current use value, the land stays in your use meanwhile, and should planning fail it remains yours with nothing owed. Our how it works page follows each stage from the first visit.
The planning detail in full
Widnes and Runcorn, Divided by the Mersey and a Third Green Belt
Halton Borough Council has been a unitary council since 1998 and part of the Liverpool City Region Combined Authority since 2014, so it decides applications and writes its own plan. The borough is Widnes north of the Mersey, Runcorn south of it, and the parishes of Hale, Halebank, Daresbury, Moore, Preston Brook and Sandymoor, home to 131,543 people in 2024 according to Wikipedia. Clockwise from the west it borders Liverpool, Knowsley and St Helens in the city region, then Warrington and Cheshire West and Chester, both on our Cheshire page.
- A third of the borough is Green Belt. The adopted plan puts the Green Belt at about 2,500 hectares, describes its boundary as tightly drawn, and says it contains the smaller settlements of Moore, Daresbury and Preston-on-the-Hill, with Hale Village inset within it.
- An estuary of international importance. The Mersey Estuary is a Special Protection Area, a Ramsar site and a Site of Special Scientific Interest, and the plan describes it as the feature that "both divides and unites" the two towns.
- A shared housing market. The plan places Halton in a Mid-Mersey housing market area with St Helens and Warrington, and the three agreed that none could take the others' unmet need.
5,035 Homes in Twelve Years Against 4,200 at the Plan's Pace
Halton states its supply position inside its housing monitoring, not in a stand-alone statement. Its housing monitoring report for 2026, dated June 2026 with a base date of 31 March 2026, says only: "At the time of publication of the AMR Halton has over 5 years supply." It gives no figure in years and no calculation, but it does list completions for every year of the plan so far:
| Years | Net new homes | Against 350 a year |
|---|---|---|
| 2014/15 to 2019/20 | 3,240 | 1,140 above |
| 2020/21 and 2021/22 | 249 | 451 below |
| 2022/23 | 362 | 12 above |
| 2023/24 | 358 | 8 above |
| 2024/25 | 387 | 37 above |
| 2025/26 | 439 | 89 above |
| Twelve years in all | 5,035 | 835 above |
Outside those two lean years, completions topped 350 in every year, and 2025/26 was the best year since 2019/20. That year 190 of the 440 gross completions were affordable homes, 35% of completions were on brownfield land, and 345 homes were under construction at the base date.
Why a Statement Without a Number Still Matters
In Halton the supply position matters most for grey belt. Homes on grey belt land need a demonstrable shortage behind them, and the evidence usually accepted is a Housing Delivery Test score under 75% or less than five years of deliverable land. Halton's own statement and its 170% score give neither today. Nor can policy S5 of the August 2026 NPPF help a Green Belt field: its reach stops at the Green Belt edge, whatever the unmet need, and the plan itself calls Halton's Green Belt boundaries tightly defined, particularly in Widnes.
With no calculation published, the margin behind "over 5 years" cannot be tested from outside.
The 2022 Plan: 8,050 Homes and a Green Belt Redrawn in Places
The council's adoption statement records that it adopted the Halton Delivery and Allocations Local Plan 2014 to 2037 in March 2022, replacing most of the 2013 Core Strategy and the saved policies of the 2005 Unitary Development Plan. Policy CS(R)3 provides for at least 8,050 net new homes over the plan period, an average of 350 a year, and asks for at least 30% of them on previously developed land.
That is above the standard method of the time. The inspectors' report of 22 February 2022 records a local housing need of 265 homes a year and accepts an uplift of 85 on top, citing the Liverpool City Region growth deal, the Enterprise Zone at Sci-Tech Daresbury and past delivery that had averaged around 427 homes a year from 2010 to 2019/20. The plan's largest allocations, on both sides of the river, still have most of their homes to come:
| Allocation | Area | Homes planned | Still to build |
|---|---|---|---|
| Central Housing Area, between the canal and the railway (R32) | Runcorn | 500 | 500 |
| West of Hale Gate Road (W24) | Widnes and Hale | 504 | 500 |
| Wharford Farm, Red Brow Lane (R67) | Runcorn | 410 | 410 |
| Land at Mill Green Farm (W9) | Widnes and Hale | 428 | 404 |
| Chapel Lane to Old Upton Lane (W4) | Widnes and Hale | 300 | 300 |
| Delph Lane West (R33, R35 and R36) | Runcorn | 335 | 279 |
| Lunts Heath Road east (W49) | Widnes and Hale | 406 | 239 |
The monitoring report shows Mill Green Farm and Lunts Heath Road under construction, and Chapel Lane to Old Upton Lane awaiting a decision on outline application 23/00244/OUT.
Where the Green Belt Line Moved
The inspectors agreed that exceptional circumstances existed to alter the Green Belt in principle, given the need for homes and employment land and too little land outside it, and saw a clear need to keep an adequate supply of housing land north of the river, in Widnes and Hale. The plan also keeps a reserve: policy GB2 safeguards land the inspectors put at 148.4 hectares after their changes, which they equated to about six years' supply of land. It is out of the Green Belt but not allocated, so its time comes through a plan review.
A smaller released site shows the process. Hilltop Farm at Preston-on-the-Hill, 8.2 acres once used as an off-road motorcycle centre, is allocation P1. Place North West reported in August 2026 that it was "now removed from the Green Belt and allocated for housing", and that an outline application for 94 homes, 23 affordable, was going to committee on 10 August 2026 with officers recommending approval.
Sci-Tech Daresbury, and the Village Fields the Inspectors Kept Open
The inspectors describe Sci-Tech Daresbury as a National Science and Innovation Campus, established in 2006 and confirmed as an Enterprise Zone in 2012. The campus helped justify the higher housing figure, though the inspectors noted that jobs expected there within the plan period had been cut from 13,201 to around 5,061.
The village fared differently. The submitted plan proposed releasing land east of the Chester Road around Daresbury. The inspectors found the land west and south of the village, enclosed by the Chester Road, part of its open feel and, "given the strong supply of housing land in Runcorn taken together with site specific factors", saw no exceptional circumstances there. Main modifications MM022 and MM055 deleted the sites.
Daresbury stays within the Green Belt, where the tests are strict even for small works. In January 2025 an inspector dismissed an appeal for a single storey extension to a cottage on Chester Road, Daresbury, finding it disproportionate under policy GB1, which treats an increase of up to 30% of the original building's volume as acceptable.
The Mersey Gateway, the Estuary and the Brooks
The plan records that the Silver Jubilee Bridge, opened in 1961 for 60,000 vehicles a day, was carrying over 80,000 every weekday before a second crossing came. The Mersey Gateway Bridge opened on 14 October 2017 as a six lane toll bridge between Runcorn and Widnes, and both bridges are now tolled, though eligible Halton residents who register can cross without limit.
Flood Risk Comes From the Brooks as Much as the Tide
The plan says the estuary and the brooks running into it leave several areas at risk of flooding. The council's local flood risk management strategy of March 2015 is more specific:
- The main source is fluvial flooding from Ditton Brook and its tributaries, and from Keckwick Brook.
- Tidal flooding is known to affect property and roads at Hale Road, Ditton Road, St Michaels Road and Marshgate in Widnes, and at Ramsbrook Lane and Halegate Road in Hale.
- Surface water problems are most significant in the Kingsway and Appleton wards of Widnes.
- Who manages it: the council, as lead local flood authority, manages local flood risk, and the Environment Agency deals with flooding from main rivers.
A site mostly in Flood Zone 1, with the wetter ground kept open, is often workable; how the sequential test treats the remainder is set out in our guide to flood risk.
Routes That Fit a Tightly Drawn Green Belt
With the council reporting over five years of land and delivery at 170%, the plan and its review are the main route for open fields. Other routes do not wait on those numbers:
- Inside Widnes, Runcorn and Hale Village. Land within the built-up areas, including inset Hale Village, falls under national policy S4, which favours approval: a refusal there needs harm that substantially outweighs what the scheme brings.
- Previously developed land in the Green Belt. A former depot, haulage yard or business site with lawful buildings or a hard surface is tested differently from a field, and may be grey belt. We look at such sites through our brownfield and yards route.
- Moore, Daresbury and Preston-on-the-Hill. In these Green Belt villages, national policy allows limited infilling, and limited affordable housing for local needs where the development plan provides for it, the rural exception route.
- Grey belt, once the need is shown. Fields doing little for Green Belt purposes can be grey belt, but homes there need evidenced unmet need, which the council's published position does not supply today. Larger schemes also face the Golden Rules, which our guide to grey belt land sets out.
- The plan review. For open Green Belt fields and the safeguarded land, the review is usually the way in, not an application.
Halton Between Its Call for Sites and a City Region Strategy
The key date for Halton land is five years after adoption in March 2022. From then, national policy generally swaps a plan's requirement for the standard method when supply is tested, so the 350 a year behind the council's statement stops being the measure. The 2026 monitoring report gives no current standard method figure, and we would not guess the effect. Meanwhile, since 1 July 2026, decisions carry a 20% buffer where a recent requirement examined under a pre-December 2024 framework is 80% or less of the standard method; for Halton that turns on the current figure.
Building Far Above Every Delivery Threshold
Halton's Housing Delivery Test 2025 score, published on 17 August 2026 and renewed each year, is 170%. That leaves Halton clear of all the test's consequences: an action plan below 95%, a 20% buffer below 85%, and below 75% unmet need treated as evidenced under policy S5.
Sites Gathered in 2025 for a Routine Review
The council's call for sites for the plan review ran until 5 December 2025, and the council described it as part of the routine maintenance of the plan, not a new local plan. Its planning policy page says it is preparing to review the plan but gives no stages or dates. Above the borough, the combined authority is preparing a spatial development strategy for at least the next 15 years, housing included. Its engagement stage ran from November 2023 to February 2024, and the combined authority says it anticipates publishing the next draft for consultation in late 2026.
- Town plots and previously developed land are worth a review today, since the supply figure governs neither.
- Land not put into the 2025 call for sites is best prepared for the review's first draft, since evidence ready before sites are chosen counts most. The stages of a review are described in our landowner's guide to local plans.
- A supply statement with figures, or an appeal that tests the council's claim, could change the grey belt position quickly, and we watch for both.
Questions About Land in Halton
Halton says it has over five years of land but gives no number. Can that be challenged?
An applicant can ask for the evidence at appeal. But the council's statement and a delivery result of 170% point the other way today, so we would not rest a Green Belt case on that argument alone.
Land near Daresbury village was proposed for release and then dropped. Where does that leave it?
The inspectors had those sites deleted because of Runcorn's strong housing land supply and the village's open setting. The land stays Green Belt, so the plan review is its route, and a case would need to answer both points.
Part of my land is safeguarded under policy GB2. Can it be built on now?
Usually not yet. It is out of the Green Belt but not allocated, and national policy expects permanent development there to follow a plan update that proposes it. That makes it well placed for the review.
My fields run down towards Ditton Brook. Does that rule them out?
Not by itself. The council names Ditton Brook and its tributaries as the main source of flood risk, so the lower ground may be in Flood Zone 2 or 3. Homes can often go on the drier part, with the brook corridor kept open.
I own an old yard on a lane near Moore. Is it treated like a field?
Probably not. Moore is washed over by the Green Belt, yet a yard with a lawful business use and a hard surface is previously developed land, judged on different tests and possibly grey belt. Farm buildings are excluded, so the planning history comes first.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
Tell Us About Your Land in Halton
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Cheshire
County overview
Selling Land in Cheshire
Selling land across Cheshire? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Neighbouring council · Housing Delivery Test: 244%
Selling Land in Cheshire West and Chester
Selling land in Cheshire West and Chester? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Neighbouring council · Housing Delivery Test: 134%
Selling Land in Warrington
Selling land in Warrington? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing. Supply: 5.13 years.
Housing Delivery Test: 213%
Selling Land in Cheshire East
Selling land in Cheshire East? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Sources
- Halton Borough Council: Delivery and Allocations Local Plan 2014 to 2037 (adopted March 2022)
- Halton Borough Council: Delivery and Allocations Local Plan adoption statement (March 2022)
- Planning Inspectorate: Report on the examination of the Halton Delivery and Allocations Local Plan (22 February 2022)
- Halton Borough Council: Authority Monitoring Report Housing 2026 (June 2026)
- Halton Borough Council: Planning policies and plans
- Halton Borough Council: Local Plan (Review), Call for Sites 2025 (August 2025)
- Halton Borough Council: Local Flood Risk Management Strategy (March 2015)
- Planning Inspectorate: Appeal decision APP/D0650/D/24/3339843, Sextons Cottage, Chester Road, Daresbury (21 January 2025)
- Liverpool City Region Combined Authority: Spatial Development Strategy
- Mersey Gateway: Mersey Gateway Bridge
- Place North West: Halton tipped to approve 94 homes (August 2026)
- Wikipedia: Borough of Halton
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.