Cheshire council area
Selling Land in Warrington
Warrington adopted its local plan in December 2023, released Green Belt for thousands of homes and its latest statement still shows five years of housing land, by a narrow margin. The council has started a new plan against a much higher housing figure, and the Green Belt evidence it is gathering now will shape its view of which fields count as grey belt.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
A Mersey Town Held in by 11,533 Hectares of Green Belt
Warrington Borough Council has been a unitary authority since 1998, so it decides planning applications and writes its own local plan. The borough takes in the town, with Great Sankey, Birchwood, Stockton Heath and Grappenhall, and a ring of villages beyond it that includes Lymm, Culcheth, Burtonwood, Croft and Winwick. Wikipedia puts its population at 215,391 in 2024, and the River Mersey runs through it. Our Cheshire page sets the borough beside its two larger neighbours.
- Mostly Green Belt. The council's monitoring report counts 11,533 hectares of Green Belt after the 2023 plan. The plan gives the borough an area of some 176 square kilometres, so roughly two thirds of it is Green Belt.
- Nine inset villages. Policy GB1 of the plan lifts Appleton Thorn, Burtonwood, Croft, Culcheth, Glazebury, Hollins Green, Lymm, Oughtrington and Winwick out of the Green Belt, while twelve smaller places, from Stretton and Hatton to Broomedge and Collins Green, stay washed over by it.
- A recent plan. Full council adopted the Warrington Local Plan 2021/22 to 2038/39 in December 2023.
- Delivery above target. The council built 2,735 homes against a requirement of 2,036 in the Housing Delivery Test 2025, a result of 134%.
- Five years of land. The latest statement finds 5.13 years of deliverable housing land at 1 April 2025.
Here the question for a landowner is rarely whether homes are wanted, but whether a field sits in the Green Belt, in an inset village, or where the new plan might look next.
Warrington in Figures
The government's latest figures for the council, its latest five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
134%
Meeting its housing requirement.
Five-year housing land supply
5.13 years
Five years or more of deliverable housing land. Position at 1 April 2025, measured against the adopted Local Plan's stepped requirement (one year at 678 homes, then four at 870 a year), plus a 5% buffer. Stated by Warrington Borough Council (Annual Monitoring Report 2025).
Checked sourceHomes built against homes needed
2,735
of 2,036 needed, April 2022 to March 2025
Most recent strategic plan adopted
December 2023
The plan currently used to decide applications.
New plan progress
Updated
Local Plan update under way: Gateway 1 published 21 September 2026, adoption due March 2029
Checked source
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
Five Years of Supply, by 112 Homes
The council sets out its supply in its Annual Monitoring Report 2025, published in December 2025 with a base date of 1 April 2025. It measures the five years against the adopted plan's own requirement rather than the standard method, because the plan is less than five years old:
| Part of the calculation | Council's figure |
|---|---|
| Yearly requirement used | One year at 678 homes, the last year of the plan's first step, then four years at 870 |
| Buffer | 5%, as there has been no significant under delivery over the previous three years |
| Five-year requirement with buffer | 4,366 homes |
| Deliverable supply | 4,478 homes |
| Result | 5.13 years |
The margin is 112 homes. The same table looks ahead, and there it gets tight. For the five years from 2026/27, the council applies a 20% buffer, which it says the national framework requires from 1 July 2026 for decision making. Five years at 870 homes plus that buffer comes to 5,220, against a projected supply of 5,226. On the council's own figures, the next period clears five years by six homes. The periods after that look healthier in the same table.
Why the Higher Buffer Applies to Warrington
The rule is narrow. From 1 July 2026, and only when deciding applications, national policy lifts the buffer to 20% for a council whose plan is under five years old, went through examination against a pre-December 2024 version of the framework, and sets a housing figure no higher than 80% of the current standard method. The inspectors examined Warrington's plan against the 2021 framework, and its average of 816 homes a year is about 76% of the 1,073 in the council's latest project document, so each condition is met. The published 5.13 years predates the rule and carries a 5% buffer. Put the same first-period figures through a 20% buffer and the requirement becomes about 4,990 homes against 4,478 counted, or roughly 4.5 years. That is our arithmetic, not a council figure, but it shows why the next statement matters so much here.
Why the Pace of Building Matters Here
Completions have slowed. The report records 591 net new homes in 2024/25, down from 654 the year before and a little under the 678 the plan asked for. It also says the six village allocations are running slightly behind schedule, and that the expected start on its major sites has been pushed back a year, to 2026/27. With a six-home cushion in its own forecast, a small shift in when sites start could change the answer.
What Grey Belt Can and Cannot Do in Warrington Today
Grey belt is Green Belt land that does not strongly serve the purposes the Green Belt exists for, or that is previously developed. It matters more in Warrington than in most places, because so much of the borough is Green Belt, and policy S5 of the August 2026 framework, which lets homes cross a settlement boundary once unmet need is evidenced, has no reach into Green Belt land.
Being grey belt is not enough on its own for housing. Homes on grey belt land also need a demonstrable shortage behind them, and the evidence normally relied on is a delivery result under 75% or a supply of less than five years. On the council's published figures, a result of 134% and a supply of 5.13 years, Warrington meets neither today, although the higher buffer described above leaves that open to argument. An email from the council's planning policy and programmes manager in September 2025, quoted by Warrington Worldwide in December 2025, said any application on Green Belt land will need to show very special circumstances. The report concerned an application for 55 homes off Rushgreen Road in Lymm. The council's planning register shows that outline application, 2025/01668/OUTM for up to 55 homes by Nightingale Land, still pending consideration in late September 2026: a committee date of 16 July 2026 had been proposed, and the deadline for the council's decision had been extended to 12 October 2026.
Others are testing the point regardless. Place North West reported in June 2026 that Peel Land had lodged plans, then awaiting validation, for 200 homes, 90 of them affordable, on 20 acres at Turret Hall Farm in Croft, one of three Green Belt sites in Croft, Hollins Green and Lymm that it says meet the grey belt criteria and that could together hold 460 homes.
Four Things That Set the Grey Belt Position Here
- The need test hangs on the next statement. A statement under five years, or a delivery result under 75%, would supply the evidence of need, with nothing else about the field changing.
- The plan left no safeguarded land. The inspectors' report of October 2023 found no need to set land aside for after the plan period, pointing to the south east urban extension for growth beyond it. So there is no reserve of land already out of the Green Belt waiting for its turn.
- The council is mapping grey belt now. Its April 2026 scoping document says it is carrying out a full update of its Green Belt Assessment, with government funding, and that this will also identify grey belt land. That assessment will be the council's own view, field by field.
- Policy GB1 aims to hold the line to 2050. The adopted plan says the council will keep the general extent of the Green Belt to at least 2050, though the new plan is where that promise will be tested against a higher housing figure.
Some routes do not wait on the numbers at all. Inside the town and the nine inset villages, GB1 allows new building, conversions and redevelopment that meet national and local policy, and national policy S4 starts from support, so a scheme there is turned down only where its harm would be substantially greater than its benefits. In the twelve washed-over villages, GB1 allows limited infill of a suitable scale unless the gap itself adds to the village's character. Yards and other previously developed land have their own tests in Green Belt policy too, which our page on brownfield and yards covers. A larger grey belt scheme then has to satisfy the Golden Rules, with a higher affordable share, new infrastructure and accessible green space, all set out in our grey belt guide.
The 2023 Plan: 14,688 Homes on a Rising Step
Policy DEV1 asks for at least 14,688 homes from 2021/22 to 2038/39, an average of 816 a year. The requirement is stepped: 678 a year for the first five years, rising to 870 a year from 2026/27. The inspectors accepted the step because the large strategic sites need major infrastructure before they can deliver. The plan expects at least 10,887 of the homes to come from within the existing urban area, and GB1 removed nine areas of land from the Green Belt, with the plan putting the homes needing Green Belt release at about 4,400:
- South East Warrington Urban Extension (policy MD2): at least 4,200 homes, with at least 2,400 in the plan period. Homes England leads its development framework, which the council expected to approve later in 2026 after three rounds of consultation.
- Fiddlers Ferry (MD3): at least 860 homes on land east of Fiddlers Ferry Power Station, as part of a wider mixed use scheme. Its development framework was agreed by the council's Cabinet on 9 September 2024. The inspectors kept the land south of the railway in the Green Belt.
- Warrington Waterfront (MD1): the inspectors put its capacity at about 1,335 homes, but the plan counts none of them in its housing supply because funding for the Western Link road is uncertain. The allocation stays in the plan in case that changes.
- Thelwall Heys: a smaller urban extension of at least 310 homes.
- Six village sites (OS1 to OS6): 75 homes at Croft, 200 at Culcheth, 90 at Hollins Green, 306 across two sites at Lymm and 130 at Winwick. The council's April 2026 scoping document says all six now have planning consent.
Peel Hall was dropped as an allocation because it already had outline permission; the inspectors described a site of about 69 hectares with up to 1,200 homes. They also struck out the South East Warrington Employment Area, finding no exceptional circumstances to take Green Belt land for employment. Policy DEV2 asks for 30% affordable housing on greenfield sites and outside inner Warrington, and 20% within it, which is worth knowing early, since it comes off what a site can support.
From 816 Homes a Year to 1,073
Warrington is not waiting for its plan to age. The council gave notice on 16 April 2026 that it was starting an update under the government's new 30-month plan-making system, and ran a scoping consultation and call for sites from 16 April to 1 June 2026. Its project initiation document, published in September 2026, puts local housing need under the revised standard method at 1,073 homes a year, against the plan's average of 816.
Two figures are in circulation. The April 2026 scoping document gave 1,067 homes a year; the September document gives 1,073. The standard method is recalculated as new household and affordability data are released, which is the most likely reason for the difference. Either way, the next plan has to find room for roughly 250 more homes a year than the current plan's average.
The same document is clear about when the higher figure starts to bite. It says the transitional rules protect the plan's requirement for five years from adoption, subject to the council keeping a five-year supply. In other words, the December 2028 date holds only while the supply holds. Policy DEV1 itself commits the council to consider a review if monitoring shows the five years can no longer be sustained.
Neighbourhood Plans in the Villages
Appleton Thorn has had a neighbourhood plan since June 2017. Lymm and Grappenhall and Thelwall have both reached the stage of a six-week publicity period, which ran from 21 July to 1 September 2026, on the way to examination. Once made, their policies carry weight on where new homes go in those parishes, so a site's fit with them is worth checking early.
The Land We Look for in Warrington
- Plots, backland and redevelopment sites within the town or inside the inset villages such as Lymm, Culcheth, Burtonwood and Winwick.
- Old yards, haulage depots and other former business sites in the Warrington Green Belt that still have lawful buildings or a hard surface.
- Gaps within washed-over villages such as Stretton, Hatton or Broomedge that could take limited infill.
- Green Belt fields that are enclosed by roads, homes or other development and may do little for the purposes of the Green Belt.
- Larger holdings on the edge of the town or the inset villages that the new plan could consider.
While the Green Belt Assessment is under way, evidence gathered early on landscape, access, drainage and a site's Green Belt role carries most weight. That work is ours to fund in full. The option price is fixed when we sign, pitched above the land's value as it stands, and the fields stay in your use in the meantime. Should permission not come, the land remains yours with nothing to repay; the how it works page follows the process from first visit to completion. Our guide to call for sites and local plans explains how each stage works.
Warrington Between Now and the Plan's Fifth Birthday
Plan Content and Evidence, 17 November 2026 to 4 January 2027
The council's local plan timetable, updated in September 2026 after it published its Gateway 1 self-assessment, sets out the stages ahead:
| Stage | Council's timetable |
|---|---|
| Consultation on plan content and evidence | 17 November 2026 to 4 January 2027 |
| Gateway 2 advice sought | 1 June 2027 |
| Consultation on the proposed plan | 19 October to 14 December 2027 |
| Gateway 3 assessment | 1 June 2028 |
| Submission for examination | 3 July 2028 |
| Adoption | 5 March 2029 |
That consultation is likely to be the first chance to see how the council is thinking about where the higher figure goes, and it may show early findings from the Green Belt Assessment. The proposed plan in October 2027 is where specific sites would normally be put forward for allocation.
The Next Supply Statement
The next statement, to a base date of 1 April 2026, will be the first to use 870 homes a year throughout, with the 20% buffer. We will not guess its result. The council's own forecast for that period cleared five years by six homes; a result below five would change the grey belt position described above and bring the plan's review commitment into play.
The Next Delivery Test
The Housing Delivery Test 2025 came out on 17 August 2026, and a new edition follows each year. At 134%, Warrington faces none of the test's consequences. Lower completions in 2024/25 will feed into later results, but a fall below 95% would be needed before an action plan was required.
A Mayor and a Strategy for Cheshire and Warrington
The scoping document notes that Warrington is now part of the Cheshire and Warrington Combined Authority, with a mayoral election due in May 2027, and that the combined authority will prepare a spatial development strategy for the sub-region. Government guidance quoted in the project document says such strategies should not hold up local plans.
What This Means for Timing
- Sites inside the town and inset villages, infill in washed-over villages and previously developed land can be looked at now, as none depends on the supply figure.
- Open Green Belt land is best prepared for the November 2026 consultation and the proposed plan in October 2027, while the council is still forming its view on grey belt.
- A change in the supply position would alter this advice quickly, and we watch each statement for exactly that reason.
Questions About Land in Warrington
I missed the call for sites that closed on 1 June 2026. Is it too late for my land?
No. The call for sites was an early step in the new plan. The council's timetable puts a consultation on plan content and evidence ahead of the proposed plan, which is due out for consultation in October 2027. What matters most is having clear evidence ready before then.
I have been told my field near Lymm is grey belt. Does that mean it can be built on now?
Not by itself. With five years of supply on the council's published figures and a high delivery result, national policy does not yet treat the need for homes on grey belt land as shown in Warrington. The council's own Green Belt Assessment, now under way, will also give its view on which land is grey belt.
My land is in Stretton, which is washed over by the Green Belt. Can I build anything?
Policy GB1 allows limited infill of a suitable scale in the twelve washed-over villages, including Stretton, unless the gap adds to the village's character. It is a narrow route suited to a plot or two, and the exact position of the gap matters.
Will the south east urban extension take all the growth, leaving nothing for other land?
It is the largest single site, but the plan expects only 2,400 or more of its 4,200 homes within the current plan period, and it already counts towards the current plan's figure. The new plan must find room for about 250 more homes a year on top, which is why the council has started again so soon.
I own land on the edge of Culcheth, next to the new allocation. Does that help?
It can help the story, as the village already has a consented site and the boundary has moved once. But the land beside it is still Green Belt, so its route today is the new plan, and the council's assessment of that edge will count for a great deal.
Tell Us About Your Land in Warrington
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly. We reply within 2 working days, in confidence.
More in Cheshire
County overview
Selling Land in Cheshire
Selling land across Cheshire? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 213%
Selling Land in Cheshire East
Selling land in Cheshire East? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 244%
Selling Land in Cheshire West and Chester
Selling land in Cheshire West and Chester? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Sources
- Warrington Borough Council: Warrington Local Plan 2021/22 to 2038/39 (adopted December 2023)
- Warrington Borough Council: Annual Monitoring Report 2025 (December 2025)
- Planning Inspectorate: Report on the examination of the Warrington Local Plan (23 October 2023)
- Warrington Borough Council: Updating Warrington's Local Plan
- Warrington Borough Council: Local Plan Timetable (September 2026)
- Warrington Borough Council: Local Plan Scoping Consultation Document (April 2026)
- Warrington Borough Council: Local Plan Update Project Initiation Document (September 2026)
- Warrington Borough Council: Planning policy latest news
- Warrington Borough Council: Planning application 2025/01668/OUTM, land off Rushgreen Road, Lymm (planning register, September 2026)
- Warrington Worldwide: Outrage over plan for 55 new homes on green belt (22 December 2025)
- Place North West: Peel Land lodges 200-home Warrington plans (June 2026)
- Wikipedia: Borough of Warrington
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.