Skip to content

We pay for the planning.

Call us:020 3953 5635

Areas we cover

Selling Land in Cumbria

Checked on

Cumbria has had two unitary councils since April 2023: Cumberland, from Carlisle down the west coast through Workington and Whitehaven, and Westmorland and Furness, from Barrow-in-Furness and Ulverston to Kendal, Penrith and Appleby. Both still judge land under the plans of the six districts they replaced, both are building far more homes than the government's delivery test asks, and both are starting a single new plan from scratch. This page explains what that means for land in each part of the county.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential across Cumbria and welcome land of every kind in both of its council areas: fields and paddocks, inherited land, old yards and larger holdings.

Both of Cumbria's councils are short of the five years of housing land national policy expects. In both, national policy counts that as evidence that more homes are needed, so a well placed field next to a town or village can make a case outside the local plan, weighed with everything else. Land in the Green Belt faces stricter national tests. The table below shows each council.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

Selling Land in Cumbria, Council by Council

The table gives each council's result in the Housing Delivery Test 2025, its five-year supply and where its local plan stands. Cumberland shows no single delivery result, because the government still measures Allerdale, Carlisle and Copeland separately; their results and supply figures follow below.

Housing delivery and local plan position of each council in Cumbria
CouncilHousing Delivery Test 2025Five-year land supplyMost recent strategic plan adoptedNew plan progress
CumberlandNot measured3.32 yearsShort of five yearsAt March 2026: Cumberland Council: Five Year Housing Land Supply statements for the Allerdale, Carlisle and Copeland Local Plan areas, position at 31 March 2026 (September 2026)November 2024The former plans still apply: Allerdale Part 1 (July 2014) and Part 2 (July 2020), the Carlisle District Local Plan (November 2016) and the Copeland Local Plan 2021 to 2039 (November 2024). The St Cuthbert's Garden Village Local Plan was submitted on 31 October 2025, with hearings from 23 June to 2 July 2026 and consultation on main modifications from 9 November to 21 December 2026. A single Cumberland Local Plan began with a notice on 30 June 2026 and a scoping consultation from 14 September to 23 October 2026; the timetable (amended 2 November 2026) puts consultation on content and evidence from 18 October 2027, submission on 3 November 2028 and adoption on 24 April 2029Checked November 2026 on the council or government website
Westmorland and Furness307%3.17 yearsShort of five yearsAt March 2025: Westmorland and Furness Council: Five Year Housing Land Supply Report, 31 March 2025 (November 2025)June 2019The former district plans still apply, the newest the Barrow Borough Local Plan (4 June 2019). A single Westmorland and Furness Local Plan began with a notice on 30 June 2026, a scoping consultation and call for sites from 1 July to 11 August 2026 and a Gateway 1 self-assessment published on 30 October 2026; the timetable puts consultation on content and evidence from 1 September to 13 October 2027, submission on 9 October 2028 and adoption on 30 April 2029Checked November 2026 on the council or government website

Just over the county line: Lancaster (Lancashire).

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026, with later milestones we have checked on council and government websites marked "Checked". Five-year land supply figures come from each council's own latest statement, or the latest figure tested at appeal, linked in each row. A Housing Delivery Test result below 75%, or a supply short of five years, counts as evidence of unmet housing need under policy S5 of the NPPF. Local plans move quickly, so always check the council's own website for the latest position.

Cumberland: Carlisle, Workington, Whitehaven and the Solway

Cumberland still uses three former plans, one for each borough it replaced: the Allerdale plan, whose second part was adopted in 2020, the Carlisle District Local Plan of November 2016 and the Copeland Local Plan 2021 to 2039, adopted in November 2024. Its supply is counted the same way, in three statements published in September 2026, each at 31 March 2026:

From the council's three September 2026 supply statements, one per former area, each of which also gives that area's Housing Delivery Test result.
Former areaDelivery resultSupply measured againstBufferYears of supply
Allerdale431%Its 35.5% share of the standard method figure of 1,120 homes a year for Cumberland, 398 homes a year5%2.72
Carlisle222%Its 39.8% share of the same figure, 446 homes a year5%2.5
Copeland11,375%The 2024 plan's requirement of 146 homes a year20%6.79

The council gives no single supply figure for Cumberland. Adding the three areas' deliverable homes and five-year requirements together gives 3.32 years on our own arithmetic, but a decision on a field weighs the figure for the former area it lies in, not that sum.

Allerdale and Carlisle are measured against the standard method because their plans are older; Copeland's plan is recent, so its own requirement still applies, and the Copeland statement adds a 20% buffer "as the Housing Requirement is less than 80% of the most up-to-date standard method figure", not because of any shortfall in building. In the Carlisle statement, the council records a large number of approvals that followed changes to the national approach to nutrient neutrality, which it does not yet count as deliverable but expects, once resolved, to "increase the overall housing supply by 3,026 dwellings".

A single Cumberland Local Plan will replace the three. Its timetable, amended on 2 November 2026, sets the consultation on plan content and evidence for 18 October to 26 November 2027, submission for 3 November 2028 and adoption for 24 April 2029.

Westmorland and Furness: Kendal, Penrith, Barrow and Ulverston

Westmorland and Furness built 2,312 homes in the three years the Housing Delivery Test 2025 measures, against 752 needed, a result of 307%. That is well clear of the lines at 95%, 85% and 75% that bring an action plan, a 20% buffer or unmet need treated as evidenced.

Its supply is counted once, for the whole planning area outside the two Parks. The council's report at 31 March 2025 starts from a district-wide standard method figure of 1,330 homes a year, takes the 74.7% of it that falls outside the Parks, 993 homes a year, adds a 5% buffer and finds 3.17 years. Until a new plan is adopted, the report says, "the Local Plans from the old councils (Barrow, South Lakeland, Eden and Cumbria) will stay in place", brought together in a Consolidated Planning Policy Framework.

Work on a single Westmorland and Furness Local Plan follows the gateway checks of the reformed plan-making system, and the council's Gateway 1 page records a scoping consultation and a call for sites from 1 July to 11 August 2026 and the self-assessment published on 30 October 2026, which started a 30 month clock. The same page says the council intends to hold its second consultation in September 2027, aims to pass Gateway 2 in June 2028 and Gateway 3 in October 2028, and aims to adopt the plan in April 2029.

How the Two Councils Compare

The two councils began on the same day and aim to adopt their new plans in the same month, but they count supply differently. Westmorland and Furness has one figure for all of its land outside the Parks; Cumberland has three, and only Copeland, around Whitehaven, shows five years. Delivery is strong everywhere, so in neither council does a field's case rest on the delivery test.

For an owner selling land for development near Kendal, Penrith, Barrow, Workington or Carlisle, the supply figure for that area is the fact that carries weight. Near Whitehaven, Egremont or Millom it is the new plan and sites inside the towns.

The Land We Buy in Cumbria

  • Fields of 2 acres or more on the edges of Carlisle, Workington, Maryport, Cockermouth and Wigton, where the former Allerdale and Carlisle areas are short of five years of land.
  • Land beside Kendal, Ulverston, Penrith, Barrow-in-Furness, Appleby, Kirkby Stephen and Grange-over-Sands, outside the National Parks.
  • Sites inside Whitehaven, Egremont, Millom and the west coast towns, and land worth preparing for the new Cumberland plan.
  • Former works, depots and yards in Barrow, Workington, Whitehaven and Kendal.
  • Farmland in the parts of the Eden catchment now outside nutrient neutrality, around Carlisle, Brampton, Wetheral and Lazonby.
  • Inherited land anywhere in the county outside the Parks, where the family wants to understand its options first.

Land inside the Lake District or the Yorkshire Dales, within a National Landscape or wholly in the highest flood zone faces the hardest tests, and we say so plainly at the start. Families settling an estate will find our probate and selling land guide useful.

Is Your Land in Cumbria a Good Fit?

You do not need to know the planning rules to sell land for development in Cumbria. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Cumbria

There are three common ways to sell land with development potential in Cumbria. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Cumbria: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Cumbria and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

The planning detail in full

Six Districts, Two Councils and Two National Parks: Who Decides on Cumbrian Land

The Cumbria (Structural Changes) Order 2022 abolished Cumbria as a local government area on 1 April 2023, wound up Cumbria County Council and its six district councils, and created two councils in their place. Each is a unitary authority, the sole principal council for its area, so it prepares the local plan and decides planning applications everywhere in it outside the National Parks.

  • Cumberland Council covers the former Allerdale, Carlisle and Copeland areas: Carlisle, Brampton and Longtown in the north, then Workington, Maryport, Cockermouth and Wigton, and Whitehaven, Cleator Moor, Egremont and Millom on the west coast.
  • Westmorland and Furness Council covers the former Barrow-in-Furness, Eden and South Lakeland areas: Barrow, Dalton-in-Furness and Ulverston, Kendal and Grange-over-Sands, and Penrith, Appleby and Kirkby Stephen.
  • The Lake District National Park Authority plans for the Park itself, a mountainous area of some 2,362 square kilometres. Its local plan for 2020 to 2035 was adopted in May 2021 and names Keswick, Bowness and Windermere, Ambleside, Coniston and Grasmere among its Rural Service Centres.
  • The Yorkshire Dales National Park Authority plans for the parts of that Park which lie in Westmorland and Furness.

Westmorland and Furness's land supply report of November 2025 puts it plainly: in the Parks, "the National Park authorities have their own Local Plans and also deal with planning applications", and the council's plans "will only cover parts of the District outside the National Parks." Cumberland's new plan is drawn the same way, covering its area excluding the Lake District National Park.

Above both councils, a Cumbria Combined Authority was formally established in February 2026, and Westmorland and Furness's devolution page puts Cumbria's first mayoral election in May 2027. It says the authority "will support transport, skills, housing and economic growth" and lists transport and planning among its long-term priorities, but it does not describe the authority deciding planning applications.

If you are thinking of selling land in Cumbria, the first two facts a review settles are which side of a National Park boundary the land lies and which of the six former districts it sits in. Between them they decide the authority, the plan and the land supply figure that apply.

What a Cumbrian Site Has to Clear: Parks, Fells, Rivers and the Wall

The Lake District and Its World Heritage Inscription

The Lake District National Park Local Plan records that "The Lake District received its inscription as a World Heritage Site in July 2017". Inside the Park, it states that "the Parks are not suitable locations for unrestricted housing", and its policies expect development on housing sites to meet "identified local needs and local affordable needs".

The North Pennines, the Solway Coast and Hadrian's Wall

In the north of the county the Carlisle District Local Plan names "two Areas of Outstanding Natural Beauty (AONB), (Solway Coast and the North Pennines)", now called National Landscapes, and adds that "The North Pennines AONB is also a European Geopark." It also describes the Hadrian's Wall World Heritage Site, running across the district between Gilsland and Burgh by Sands. Policy GI 2 of the same plan requires development in either of them to "conserve and enhance the natural beauty" and gives permission for major development "only" in exceptional circumstances and where it is shown to be in the public interest.

Nutrient Neutrality Across the Eden, Derwent and Kent Catchments

On 6 February 2026 Cumberland Council announced that Natural England had redrawn the River Eden catchment for nutrient neutrality, so that the whole of Carlisle, Brampton and Wetheral, and in the former Eden area Great Salkeld, Lazonby, Calthwaite and High Hesket, now lie outside it. Around 50 stalled applications, including more than 500 affordable homes, could move forward. The rules still apply elsewhere in the Eden catchment and in the catchments of the Derwent and Bassenthwaite, the River Kent and Esthwaite Water, where the council says water quality improvements are still needed. Westmorland and Furness is one of the three partners in the Cumbria Nutrient Neutrality Partnership.

Flooding From the Fells to the Towns

After Storm Desmond, the Environment Agency's plan of June 2016 counted 6,300 householders and businesses across Cumbria flooded in December 2015, with "one and a half thousand homes flooded in Kendal alone", a similar number in Carlisle and hundreds in Appleby, Keswick and Cockermouth. The Carlisle plan adds that in 2005 and again in 2015 the district "experienced the worst floods since 1822". On a riverside field the part that can be built on, and a dry way in and out, are settled before anything else; our flood risk guide explains the sequential test.

None of these rules a sale out on its own. A review of Cumbrian land first maps which of them reach the field: the Park boundary, the National Landscapes, the catchment the land drains to and the river beside it.

Carlisle's Garden Village, Barrow's Submarines and the Market Towns: Where Cumbria Is Growing

The main growth points are these:

Sources: St Cuthbert's Garden Village; Carlisle District Local Plan (November 2016); Westmorland and Furness Council (July 2025); Cumberland Council, Copeland supply statement (September 2026).
PlaceWhat is planned
South of CarlisleSt Cuthbert's Garden Village, around 10,000 homes, through a local plan of its own submitted on 31 October 2025
Carlisle and its rural areaThe 2016 plan's 9,606 new homes from 2013 to 2030, about 70% in the urban area and 30% in the rural area
Barrow-in-FurnessA ten-year plan from Team Barrow, backed by £220 million of government investment, for a town whose population is forecast to grow significantly
Whitehaven, Cleator Moor, Egremont and MillomThe 2024 Copeland plan, under which the former area shows more than five years of land
Kendal, Penrith and UlverstonThe legacy plans' allocations, and the new Westmorland and Furness plan for the years ahead

The garden village, just south of the city, has had a masterplan since 2020, and work on the Carlisle Southern Link Road began in 2023. The website records that the government appointed an independent inspector, that the examination hearings concluded and that consultation on main modifications to the plan followed. We read a field inside the village boundary against that plan as modified, alongside the Carlisle plan.

At Barrow, Team Barrow is a partnership of the government, Westmorland and Furness Council and BAE Systems, and links the town's future to the long-term commitment to the submarine programme, which it expects to create thousands of new jobs, at BAE Systems among others. The council's announcement names housing among the things the plan aims to improve but gives no figure for new homes.

For anyone thinking of selling farm land to developers in Cumbria, land that sits naturally against the edge of one of these towns, outside the Parks and the highest flood zones, is where a case is easiest to make.

What This Means If You Are Selling Land in Cumbria

The route depends on the former district more than the council:

  1. An application weighing the supply shortfall. Around Carlisle, Workington, Maryport, Cockermouth and Wigton, and across Westmorland and Furness outside the Parks, a supply short of five years is evidence of unmet need under policy S5, to be weighed for land well related to a town or village and served by roads, schools and drainage. It is not an automatic finding.
  2. Sites inside towns and villages. Policy S4 leaves refusal only where the harm would substantially outweigh the benefits, which suits yards, garden land and small plots in any of the six former districts.
  3. The new local plans. In Copeland, where supply exceeds five years, and for larger sites anywhere, land is best prepared before each council's next consultation, Cumberland's from 18 October 2027 and Westmorland and Furness's in September 2027. How a site is put forward and assessed is set out in our call for sites guide.
  4. Previously developed land. Former works, depots and yards can often be looked at whatever the supply figure. Farm buildings fall outside that definition, though some can be converted to homes under Class Q, as our Class Q guide explains.
Illustrative example: a 6-acre field on the edge of a market town in the former Eden area
Council
Westmorland and Furness, outside both National Parks, under the Eden Local Plan
Land supply
3.17 years across the council's planning area at 31 March 2025
Constraints
Whether the field drains to a part of the Eden catchment still under nutrient neutrality, its flood zone, and its distance from the North Pennines
Likely route
An application under policy S5, with nutrient mitigation if the catchment requires it
Your costs
None. Every planning cost, including surveys, mitigation and any appeal, is paid by us
What we would offer
An option agreement at a price fixed before any planning work begins, set above the land's present worth to you

An illustration of how we think about a site, not a real offer. Every field is different, and our free review looks at yours.

If permission is not granted, the land stays yours and nothing is owed, and you keep farming or letting it until we complete. Our page on farmland shows how we look at larger holdings on the edge of the fells and the Solway plain.

Timing a Sale While Both Cumbrian Plans Start Again

Two Plans, Both Timetabled for April 2029

Neither new plan is due before 2029: Cumberland's timetable puts adoption on 24 April 2029 and Westmorland and Furness aims for April 2029. Until then the former districts' plans remain the basis for decisions, and wherever one of them is more than five years old, national policy replaces its housing figure with the standard method.

Supply Statements and the Delivery Test

Each supply figure is a snapshot at a fixed date, and Carlisle's next one depends on when the council can count the approvals it is waiting on as deliverable; we do not predict the next figures. The Housing Delivery Test 2025 came out on 17 August 2026, and whether a later edition keeps the three former Cumberland boroughs apart is for the government to decide.

For an owner weighing when to sell land in Cumbria, that means land able to make its case under today's supply shortfalls can be looked at now, while land that depends on a new allocation is best prepared before each council's next consultation.

Questions About Selling Land in Cumbria

My land is near Keswick or Windermere. Does Cumberland or Westmorland and Furness decide on it?

Neither, if it lies inside the Lake District National Park. The Park authority decides applications there under its own local plan, which lists Keswick and Bowness and Windermere among its Rural Service Centres. A field just outside the boundary falls to the council for that area.

I own land near Penrith and more near Carlisle. Why are they treated differently?

Penrith lies in the former Eden area, now Westmorland and Furness, which measures supply once across its whole planning area. Carlisle is in Cumberland, which measures the former Carlisle area on its own, against its share of the standard method figure for Cumberland.

Will the new Cumbria mayor decide planning applications on my land?

Westmorland and Furness's devolution page lists transport and planning among the combined authority's long-term priorities, but it does not describe the authority deciding applications. Each council is preparing its own local plan, timetabled for adoption in April 2029.

Is land near Lazonby or Kendal still held up by nutrient neutrality?

Lazonby now lies outside the redrawn River Eden catchment. Kendal stands on the River Kent, one of the catchments where the council says the rules still apply, so a housing scheme there has to show how it deals with nutrients, and we pay for that work.

The former Copeland area has more than five years of land. Is land near Whitehaven still worth putting forward?

Yes. Sites inside the towns are judged under policy S4, and land beyond them can be prepared for the Cumberland Local Plan, whose content and evidence consultation is timetabled from 18 October 2027.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

Selling Land in Cumbria? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council, or leave it blank if you are not sure which part of Cumbria the land is in. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.

Other Counties We Cover

Counties we have researched council by councilWe review land anywhere in England

Cumbria

2 councils, none of them built fewer than 75% of the homes needed in the government's latest count.

You are viewing this county