Cumberland Council has decided planning applications outside the Lake District National Park since April 2023, yet land around Carlisle, Brampton and Longtown, Workington, Maryport, Cockermouth and Wigton, or Whitehaven, Egremont and Millom is still judged under the plans of Allerdale, Carlisle and Copeland, and housing land is still counted for each of them. The former Allerdale and Carlisle areas can show well under five years of land while Copeland shows more than six, and a single Cumberland Local Plan is timetabled for adoption in April 2029.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Cumberland and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Cumberland reports its housing land by former district, and every area is short of the five years national policy expects (about 3.32 years taken together, by our own sum of the council's figures). That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. The plans of its former areas date from 2014 and 2020 (Allerdale), 2016 (Carlisle) and 2024 (Copeland); a plan for St Cuthbert's Garden Village is at examination and a single Cumberland plan is being prepared.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Cumberland

  • Fields on the edge of Workington, Maryport, Cockermouth, Wigton, Aspatria and Silloth, where the former Allerdale area is short of five years of land.
  • Land around Carlisle outside the garden village, and at Brampton, Longtown and the villages of the rural area, where policy HO 2 allows homes on unallocated sites within or on the edge of a settlement.
  • Sites inside Whitehaven, Cleator Moor, Egremont and Millom, judged under policy S4, and land worth putting forward for the next plan.
  • Brownfield land and yards in Workington, Maryport and Whitehaven, where a former works or depot inside the town is judged under policy S4.
  • Inherited land anywhere in Cumberland outside the National Park, where the family wants to know its options first.

A site here often turns on flood or drainage and on which former plan applies. We pay to answer both, and for every application and appeal after that. The price is fixed in the option at the start, above what the land is worth to you now; you keep farming or using it until completion, and a refusal leaves it yours with nothing owed.

Is Your Land in Cumberland a Good Fit?

You do not need to know the planning rules to sell land for development in Cumberland. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Cumberland

There are three common ways to sell land with development potential in Cumberland. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Cumberland: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Cumberland and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Cumberland

Three things shape the chances of selling land for development in Cumberland: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    n/a

    Not measured in 2025.

  • Five-year housing land supply

    3.32 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2026, measured against each former area measured separately: Allerdale and Carlisle against their shares of the standard method (1,120 homes a year for Cumberland) with a 5% buffer, Copeland against its adopted requirement of 146 homes a year with a 20% buffer, 5,307 homes over five years in all; from 2.5 years (Carlisle) to 6.79 years (Copeland). Stated by Our own sum of Cumberland Council's three former-area figures (3,525 deliverable homes against 5,307); the council gives no single figure for Cumberland.

    Checked source
  • Homes built against homes needed

    n/a

  • Most recent strategic plan adopted

    November 2024

    The plan currently used to decide applications.

  • New plan progress

    Latest step

    The former plans still apply: Allerdale Part 1 (July 2014) and Part 2 (July 2020), the Carlisle District Local Plan (November 2016) and the Copeland Local Plan 2021 to 2039 (November 2024). The St Cuthbert's Garden Village Local Plan was submitted on 31 October 2025, with hearings from 23 June to 2 July 2026 and consultation on main modifications from 9 November to 21 December 2026. A single Cumberland Local Plan began with a notice on 30 June 2026 and a scoping consultation from 14 September to 23 October 2026; the timetable (amended 2 November 2026) puts consultation on content and evidence from 18 October 2027, submission on 3 November 2028 and adoption on 24 April 2029

    Checked source

See how Cumberland compares with the other 221 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Allerdale, Carlisle and Copeland Under One Council

Cumberland Council came into being on 1 April 2023, following the merger of the borough and city councils of Allerdale, Carlisle and Copeland and Cumbria County Council. Most owners still describe their land by the old borough names, and for planning purposes they are right to:

  • Former Allerdale: Workington, its principal centre, with Maryport, Cockermouth, Wigton, Aspatria and Silloth as key service centres.
  • Former Carlisle: the city of Carlisle, the market towns of Brampton and Longtown, and the villages of the rural area along Hadrian's Wall and up to the North Pennines.
  • Former Copeland: Whitehaven, Cleator Moor, Egremont and Millom, with villages such as St Bees, Seascale and Distington.

Keswick is a Cumberland town but lies within the Lake District National Park, just north of Derwentwater, so a field there falls under the Park's own local plan. Every former plan, and the new one being prepared, covers only the land outside the Park.

If you are thinking of selling land in Cumberland, the first fact a review settles is which former borough the land lies in. That one boundary decides which plan applies, which land supply figure counts and which delivery result the government records.

Strong Building in All Three Former Boroughs, and What It Means for a Sale

The Housing Delivery Test 2025, published on 17 August 2026, gives no single figure for Cumberland but measures each former borough, and all three built far more than was needed:

Source: MHCLG, Housing Delivery Test: 2025 measurement. The government publishes no combined result for Cumberland.
Former boroughHomes needed, three yearsHomes built, three yearsResultConsequence
Allerdale2481,068431%None
Carlisle5341,187222%None
Copeland445511,375%None

Copeland's percentage looks extraordinary only because the spreadsheet records 4 homes needed over the three years; the 455 actually built say more. None of the three comes near the lines that bring an action plan, a 20% buffer or need treated as shown, which sit at 95%, 85% and 75%.

So the case for a site in Cumberland is made elsewhere: in the land supply of its former borough, the plan that applies there and the physical constraints on the land.

Which of Three Former Plans Applies to Your Land

The council's Local Development Scheme of 2025 confirms that each former council's plan "will continue to apply to their former administrative areas" until the Cumberland Local Plan replaces them:

Source: Cumberland Council, Local Development Scheme 2025 (March 2025), section 2.1, with plan periods from the plans.
Former areaPlan still in useAdoptedPlan period
AllerdaleAllerdale Local Plan Part 1, strategic and development management policiesJuly 20142011 to 2029
AllerdaleAllerdale Local Plan Part 2, site allocationsJuly 20202011 to 2029
CarlisleCarlisle District Local PlanNovember 20162015 to 2030
CopelandCopeland Local PlanNovember 20242021 to 2039

Allerdale: Growth Led by Workington

Part 1 of the Allerdale plan sets a requirement of at least 5,471 homes from 2011 to 2029, an average of 304 a year. About 35% of that growth is directed to Workington and about 39% to the key service centres, which the plan splits as Maryport 12%, Cockermouth 10%, Wigton 10%, Aspatria 4% and Silloth 3%. Part 2, adopted in July 2020, is the site allocations plan.

Carlisle: Room for Windfall at the Edge

The Carlisle plan provides for 9,606 homes between 2013 and 2030, about 70% in the urban area of Carlisle and 30% in the rural area, including Brampton and Longtown. For owners of smaller fields, policy HO 2 matters most: it accepts homes on sites the plan does not allocate "within or on the edge of Carlisle, Brampton, Longtown, and villages within the rural area", where the scale suits the place and an edge site "is well contained within existing landscape features".

Copeland: A New Plan With a Modest Requirement

The inspector's report on its examination, dated 23 September 2024, notes that an earlier uplift had been made to support a nuclear power station at Moorside, and that "the Moorside power station has not been built". The requirement is 146 homes a year, the baseline growth scenario, while allocations at Whitehaven, Cleator Moor, Egremont, Millom and elsewhere provide land for 200 a year.

Selling land in Workington or Carlisle therefore means working with plans more than five years old, whose housing figures national policy now replaces with the standard method. Near Whitehaven or Egremont the picture is different: the 2024 plan and its allocations are current, and an unallocated field beyond the town has no supply shortfall to point to, as the next section shows.

Land Supply for a Sale Near Carlisle, Workington or Whitehaven

The council published three supply statements in September 2026, all at 31 March 2026. For Allerdale and Carlisle it starts from the standard method figure for the whole of Cumberland, 1,120 homes a year, and divides it by each former area's share of the housing stock: 35.5% for Allerdale and 39.8% for Carlisle. Copeland is measured against its 2024 plan's own requirement.

Source: Cumberland Council, Five Year Housing Land Supply statements for the Allerdale, Carlisle and Copeland Local Plan areas, position at 31 March 2026 (September 2026). The council publishes no single figure for Cumberland.
Former areaYearly figure usedBufferFive-year requirementDeliverable homesYears of supply
Allerdale398, its share of the standard method5%2,0901,1402.72
Carlisle446, its share of the standard method5%2,3411,1962.5
Copeland146, the adopted plan requirement20%8761,1896.79

What Sits Behind Each Figure

The Allerdale statement counts 1,310 homes in all on sites with permission plus windfall, but only 1,140 once each large site is tested against the national definition of deliverable, and that lower figure gives 2.72 years. In the Carlisle statement the council states 2.5 years, though its own division of 1,196 homes by 468 a year comes to a little over that. It also records that, following the changes to the national approach to nutrient neutrality, the Carlisle area "has seen a large-scale of new approvals". These are not counted in the figure, but once their remaining mitigation and planning requirements are resolved they "will increase the overall housing supply by 3,026 dwellings".

The Copeland statement applies a 20% buffer, not because delivery was poor but because the adopted requirement is below 80% of the latest standard method figure. Even so, its 1,189 deliverable homes give 6.79 years, and it finds no past shortfall to add.

How National Policy Reads These Figures

Under the August 2026 framework, policy S5 supports homes beyond a settlement where the land is well related to it, can be served by infrastructure and unmet need is evidenced. In the former Allerdale and Carlisle areas the shortfall is evidence of unmet need, to be weighed in each decision rather than treated as an automatic finding. In Copeland, with more than five years, that support is much weaker, and the main routes are the plan's allocations, the next plan and sites inside towns and villages, where policy S4 leaves refusal only for harm that would substantially outweigh what a scheme brings. Our guide to the 2026 framework explains both tests.

For an owner selling land for development near Workington, Maryport, Wigton, Brampton or Longtown, this table is the most important fact on the page: a well placed field there starts with a supply shortfall weighing in its favour. Near Whitehaven or Millom the same field would need the local plan or a site inside the town.

St Cuthbert's Garden Village and the Land South of Carlisle

South of the city, the council is planning around 10,000 homes as St Cuthbert's Garden Village, through a local plan of its own. The council's 2025 Local Development Scheme described the Cumberland Local Plan as covering the area outside both the National Park and the garden village, while the November 2026 timetable describes it as covering the council's area outside the Park, so the garden village plan, once adopted, is the one to read for land inside its boundary. The garden village website records that construction of the Carlisle Southern Link Road began in 2023 and that the masterplan for the village was published in 2020.

  • Published and submitted. The council's 2025 timetable set Regulation 19 consultation for March to May 2025, and the plan was submitted to the government on 31 October 2025.
  • Examined. The government appointed an independent planning inspector to hold an examination in public.
  • Main modifications. The council and the inspector agreed changes to the plan, and the council's six-week consultation on them was set from 9 November to 21 December 2026, with comments limited to the modifications and their appraisals. They follow the inspector's action points of 25 August 2026 (IN4), which asked the council to retest viability after it sought to change its affordable housing mix, the plan asking 20% affordable homes on schemes of 11 or more with half of those for social rent, and to explain the extra 12% return its viability work allows for the area's premium status; the inspector's final view on soundness comes in his report.

The September 2026 Carlisle supply figure is built only from sites with planning permission and a windfall allowance, and the statement does not mention the garden village.

Land inside the garden village boundary is being planned as a whole. For a field near the garden village but outside it, we read the site against the modified plan before advising whether HO 2 or the national tests give it a case.

Selling Land Near the Rivers, the Solway Coast or the Fells

Flood Risk in Carlisle and Cockermouth

The Carlisle plan records that "in 2005, and then again in 2015, the District experienced the worst floods since 1822", and that the city's position "at the meeting point of three rivers" makes it vulnerable. The Allerdale plan says that "much of the town of Cockermouth is prone to high levels of flooding, as was seen in 2009". In both towns the buildable part of a site and a dry route in and out decide more than its size, and the sequential test is explained in our flood risk guide.

Nutrient Neutrality: Carlisle Released, Other Catchments Not

In February 2026 the council announced Natural England's revised River Eden catchment, with "the whole of Carlisle, Brampton, Wetheral" now outside it and around 50 stalled applications able to move forward. Nutrient neutrality still applies in the rest of the Eden catchment and in the Derwent and Bassenthwaite catchment, so land draining to those waters needs a mitigation answer before homes can be approved.

The Solway Coast, the North Pennines and the National Park

  • Solway Coast National Landscape. One of the two Areas of Outstanding Natural Beauty, now called National Landscapes, that the Carlisle plan names in its district.
  • North Pennines National Landscape. The other, which the plan notes is also a European Geopark.
  • Hadrian's Wall World Heritage Site. The Carlisle plan describes it crossing the district "from Gilsland in the east to Burgh by Sands in the west".
  • The Lake District National Park. Land inside the Park, around Keswick and Derwentwater, is decided by the National Park Authority under its own plan.

Selling farm land to developers near the coast, the Wall or the Park boundary is not ruled out, but the tests are stricter, so that is where a review gathers its landscape evidence first.

Timing a Sale of Land Before the Cumberland Local Plan

The single Cumberland Local Plan, prepared under the 2026 local planning regulations, will cover Cumberland outside the National Park, including minerals and waste, and replace the three former plans. Its published timetable, last amended on 2 November 2026, sets out the stages:

From the Cumberland Local Plan timetable (amended November 2026). Dates are the council's and may move.
StageCouncil's timetable
Notice of intention to prepare the plan30 June 2026
Scoping consultation14 September to 23 October 2026
Gateway 1 self-assessment31 October 2026
Consultation on plan content and evidence18 October to 26 November 2027
Proposed plan consultation12 June to 4 September 2028
Submission for examination3 November 2028
Adoption24 April 2029

The amendment of 2 November 2026 moved the content and evidence consultation from August to October 2027, the next public consultation after scoping, so land meant for the new plan is best prepared before then. Our guide to the call for sites explains how land enters a plan and is assessed.

Each September 2026 supply statement is a snapshot at 31 March 2026, and because the Carlisle one expects 3,026 more homes once the nutrient approvals are resolved, its next figure may look quite different; we do not predict it. Whether the delivery result after the Housing Delivery Test 2025 keeps the three former boroughs apart is for the government to decide.

Allerdale and Carlisle Now, Copeland Through the Plan

  • Near Workington, Maryport, Wigton, Brampton and Longtown, land can be looked at now, while supply there is short.
  • Near Whitehaven, Egremont and Millom, land outside the towns is best prepared for the plan content and evidence consultation that the timetable puts from 18 October 2027, ahead of the proposed plan in June 2028.
  • South of Carlisle, the garden village plan and its modifications come first.

Questions About Selling Land in Cumberland

My field is near Wigton. Does the Allerdale plan still apply to it?

Yes. Part 1 of 2014 and the sites plan of 2020 remain the plans for the former Allerdale area, and the Cumberland Local Plan that replaces them is not timetabled for adoption before April 2029. As both are more than five years old, the land supply is measured against the standard method, and on that basis the former Allerdale area is short of five years.

Why does Copeland have more than five years of land when Allerdale and Carlisle do not?

Copeland is measured against its 2024 plan's requirement of 146 homes a year, Allerdale and Carlisle against their shares of the far higher standard method figure for Cumberland.

Is land in Carlisle still held up by nutrient neutrality?

Not in the city. The revised River Eden catchment of February 2026 leaves the whole of Carlisle, Brampton and Wetheral outside it, though the rest of the Eden catchment and the Derwent and Bassenthwaite catchment still need mitigation.

I own land south of Carlisle near the garden village. Should I wait for its plan?

Inside the garden village boundary, its plan will shape what happens to the land. Outside it, the Carlisle plan and national policy apply as elsewhere, and we can look at the land now.

My land is in Keswick. Can Cumberland Council give it planning permission?

No. Keswick lies within the Lake District National Park, where the National Park Authority decides planning applications under its own local plan. A site there faces the Park's policies rather than Cumberland's, and we say at the outset if we think it is not worth taking forward.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Cumberland Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Cumberland stands on housing shapes which matter most here.

Selling Land in Cumberland? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Cumbria

  • County overview

    Selling Land in Cumbria

    Sell land for development in Cumbria: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 307% of need

    Selling Land in Westmorland and Furness

    Selling land in Westmorland and Furness? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.