Skip to content

We pay for the planning.

Call us:020 3953 5635

Surrey council area

Selling Land in Mole Valley

Checked on

Mole Valley adopted a new Local Plan in October 2024, yet its delivery score sits just under the 75% line and the plan itself commits to an early review. For landowners, that makes it a district where both the plan and the next review are worth watching.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Mole Valley and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Mole Valley built only 72% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from October 2024.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Mole Valley

  • Land on the edge of Leatherhead, Ashtead, Bookham, Fetcham or Dorking, outside the National Landscape.
  • Fields next to the inset villages of Beare Green, Brockham, Capel, Charlwood, Hookwood and Westcott.
  • Land in the countryside beyond the Green Belt that relates well to an existing village.
  • Previously developed land, including yards and redundant commercial buildings.
  • Holdings large enough to be considered in the early review of the plan.

A paddock beside Beare Green and a field below the Downs at Fetcham need quite different evidence, but in both cases we pay for every survey, report and application, and any appeal. The stages from our first review to completion are set out on how it works.

Is Your Land in Mole Valley a Good Fit?

You do not need to know the planning rules to sell land for development in Mole Valley. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Mole Valley

There are three common ways to sell land with development potential in Mole Valley. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Mole Valley: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Mole Valley and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Mole Valley

Three things shape the chances of selling land for development in Mole Valley: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    72%

    Below 75%: treated as having evidenced unmet housing need under national policy S5.

  • Five-year housing land supply

    5.3 years

    Five years or more of deliverable housing land. Position at 31 March 2026, measured against the Local Plan requirement of 336 homes a year, with 541 homes of past under-delivery and a 20% buffer. Stated by Mole Valley District Council, in its Five-Year Housing Land Supply Review 2026 to 2031 (August 2026).

    Checked source
  • Homes built against homes needed

    731

    of 1,013 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    October 2024

    The plan currently used to decide applications.

  • New plan progress

    Latest step

    Plan adopted October 2024 commits to an early review

    Checked source

See how Mole Valley compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Three Quarters Green Belt, a Third Surrey Hills

The council's Local Plan describes Mole Valley as covering 25,832 hectares, 16% of Surrey and the third largest of the county's 11 districts. Its settlement hierarchy names Dorking, with North Holmwood, and Leatherhead as the principal towns, Ashtead, Bookham and Fetcham as suburban villages, and six larger villages drawn out of the Green Belt, among them Hookwood, which the plan names as the economic growth point of the Gatwick area. The River Mole and its tributaries, including the Pipp Brook, run through the district, and the Surrey Hills that take in Box Hill and Leith Hill cover much of the high ground.

  • 76% Green Belt. The council's own plan gives that figure. Some countryside in the district lies beyond the Green Belt, where limited infilling in villages is allowed.
  • 37% National Landscape. The plan puts more than a third of the district in the Surrey Hills.
  • A recent plan. The Mole Valley Local Plan 2020 to 2039 was adopted on 15 October 2024.
  • Just below 75%. The Housing Delivery Test 2025 recorded 731 homes built, with 1,013 required over the period, a result of 72%.
  • East Surrey from April 2027. Mole Valley will join Elmbridge, Epsom and Ewell, Reigate and Banstead and Tandridge in the new council.

In practice, the most promising land tends to sit between the big designations: on the edges of the towns, around the villages that have been drawn out of the Green Belt, and in the Gatwick corner. The sections below take each in turn.

Selling Land in Mole Valley Under the 2024 Plan and Its Early Review

The plan took seven years from its first consultation in 2017 to adoption, with the examination paused from December 2022 to January 2024. It provides for at least 6,381 homes from 2020 to 2039, about 336 a year, and released some Green Belt land to get there, though the plan records 99.35% of the district's Green Belt, 19,522 hectares, as retained. Policy S1 spreads the new homes like this:

AreaShare of planned homes
Leatherhead area30%
Dorking area23%
Hookwood area15%
Ashtead area11%
Bookham area7%
Rest of the district14%, including modest growth in the inset villages of Beare Green, Brockham, Capel, Charlwood and Westcott

Why a New Plan Already Has a Review Built In

Policy S1 is candid about the gap. It says 336 homes a year is below the current housing need, and the supporting text gives the government's 2020 calculation for the district as 456 a year, explaining that the lower figure was chosen because housing land is severely constrained by the Green Belt, the National Landscape and the Area of Great Landscape Value. For that reason the plan commits the council to an early review, to be completed before the third anniversary of adoption, to find out whether more housing capacity is deliverable or developable.

That deadline falls in October 2027, six months after East Surrey takes over, so the review is likely to be carried forward by the new council. For sites left out in 2024, the review is the next realistic chance through the plan. How a submitted site is scored, and when to put evidence in, is covered in our call for sites and local plans guide.

Owners of land allocated in 2024, whether in the Hookwood area near the airport or on the fringes of Leatherhead and Dorking, still face a full application before anything can be built. Flood modelling near the Mole and its brooks, highway capacity, and design that answers the Surrey Hills views are the usual pieces of that work here, and we fund each of them.

What Sitting Just Under 75% Means for a Sale of Land

The Housing Delivery Test looks back over three years, so a plan adopted in late 2024 has not yet had time to lift the result. At 72%, the district is treated as having evidenced unmet housing need, and that opens routes that would otherwise be closed:

  1. Countryside beyond the Green Belt. Here policy S5 can apply. Land that is physically well related to an existing village, with the infrastructure to cope, can be supported for homes because the need is unmet.
  2. Inside the towns and inset villages. Within the built-up areas of the towns and suburban villages, and inside Beare Green, Brockham (with Strood Green), Capel, Charlwood, Hookwood and Westcott, which the plan draws out of the Green Belt, policy S4 supports development unless the harm substantially outweighs the benefits.
  3. Grey belt. In the Green Belt itself, S5 does not apply, but land that does little for the Green Belt's purposes can be grey belt. The plan's own reason for releasing land around Hookwood, that the sites were modest contributors to the objectives of the Green Belt, is close to the grey belt test.
  4. Previously developed land. Yards, former commercial sites and redundant buildings with a lawful use have their own routes in Green Belt policy.

The position can change quickly. If completions from the new allocations lift the next result above 75%, the automatic finding of unmet need falls away, and while the council can show five years of supply, no second measure would take its place. See our guide to the 2026 national framework for how S4 and S5 work.

Selling Land Near Box Hill, the Surrey Hills or the Heaths

Inside the Surrey Hills National Landscape, a major housing scheme has to show, among other tests, why it could not be built outside the designation. The council gives similar attention to the adjoining Areas of Great Landscape Value, and it notes that permission is needed in the National Landscape for some works that would not need an application elsewhere.

One Third or 37%?

The council's planning constraints page says the National Landscape and the Area of Great Landscape Value together make up about one third of the district, principally the chalk slopes of the North Downs and the Greensand Hills. The adopted plan puts the National Landscape alone at 37%. The web page reads as a rounded general description, while the plan gives the measured figure and is the document that decides applications. Either way, for an owner the practical point is that roughly a third or more of the district carries a landscape designation.

The boundary may also grow. The Surrey Hills National Landscape says the area could become 30% bigger, and on 7 September 2026 Natural England submitted a variation order to government whose proposed additions include areas named the Headley Hills, the Betchworth Hills and Mole Valley, and the Ockley Low Weald. Until ministers confirm it, land in those areas has no new status, but we read the landscape evidence behind each proposed addition before advising on a site there.

The Mole Gap to Reigate Escarpment Special Area of Conservation covers 888 hectares of the North Downs, including Norbury Park, Headley Heath, White Down and Box Hill. The council says development near it needs careful management so that extra recreational pressure does not put its features at risk.

Thames Basin Heaths Near Bookham

A small part of the north west of Bookham and the countryside around it falls between 400 metres and 5 kilometres from the Thames Basin Heaths Special Protection Area. The council is not part of the joint delivery framework for the heaths and has not been required to allocate its own alternative green space, so it advises developers to discuss mitigation with Natural England before applying. On a larger holding, that can mean setting aside part of the land as natural green space.

Selling Land Near Hookwood, Gatwick or the Mole

The plan treats Hookwood as the economic growth point of the Gatwick area, and it released sites that were modest contributors to the Green Belt within and around the village to complement it. That is why the Hookwood area takes around 15% of the district's planned homes, a far larger share than its size would suggest.

Land near any major airport raises its own questions, with aircraft noise and aerodrome safeguarding part of the assessment, and the right layout often keeps homes away from the noisiest edge. Further south and west, around Capel, Beare Green and Ockley, the issues are more about rural roads, drainage and how a scheme sits within the village.

What the 2013 to 2014 Floods Showed

Surrey County Council's investigation into the winter floods of 2013 to 2014, worst around 23 to 25 December, found flooding across Dorking, Leatherhead, Fetcham, Brockham, Charlwood, Bookham, Ockley, Westcott and other villages, from the River Mole and tributaries including the Pipp Brook. It describes the upper Mole catchment as very impermeable, so the river responds rapidly to rain. We keep homes to Flood Zone 1 wherever possible, and our flood risk guide explains how the tests work.

Heritage is the other thread. The plan counts 26 conservation areas and 1,017 listed buildings in the district, so a site on the edge of an older village centre usually needs a heritage assessment alongside the landscape work.

For a field beside Hookwood, noise and safeguarding come first, and for land near an older centre such as Dorking it is heritage, so the first report we commission depends on where in the district the land lies.

When to Sell Land in Mole Valley, Before Its Review Falls Due in October 2027

The delivery result is the first signal. The government publishes the test annually; this page draws on Housing Delivery Test 2025, published on 17 August 2026, and each edition looks back over three financial years. At 72%, the district is near enough to the line that the first full years of building on the 2024 allocations could move it either way. We do not guess the next figure. We plan for both outcomes instead, so a site in the countryside beyond the Green Belt that leans on policy S5 is also given its own evidence of local need, which still counts if the automatic finding goes.

The supply position is why that matters. The council's Five-Year Housing Land Supply Review, published on 13 August 2026, finds 5.3 years, and the council says it can therefore demonstrate a five-year supply for decision-making purposes. A supply short of five years is the other usual way of showing unmet need, and here it is not available, so the delivery result is the only one of the two that supports S5, or the need test for grey belt housing, in Mole Valley today. The review came out four days before the Housing Delivery Test 2025, and a delivery result under 85% requires a 20% buffer in any later count, so a margin this modest deserves as close a reading as the next delivery result.

The second is the Surrey Hills. Natural England's proposed extension now waits on the Secretary of State, who can confirm, amend or refuse it. If it is confirmed, land in the Headley Hills, the Betchworth Hills and Mole Valley, and the Ockley Low Weald would meet the major development test described above, and the early review would have to plan around a larger protected area. If it is amended or refused, those areas keep the status they have now.

The third is who runs the review. East Surrey's councillors, elected in May 2026, inherit it, and their choices about its scope, and about whether to open a fresh call for sites, will shape which land gets tested.

None of the three has a date we can promise. What we can do is have the survey, access and landscape evidence for a site in hand before each one arrives, so that a change in the rules becomes a prompt to act rather than a reason to begin.

Questions About Selling Land in Mole Valley

The council has a new plan. Why would it approve anything outside it?

Because national policy still applies alongside the plan. With delivery below 75%, well-located land outside the Green Belt can be supported under S5, and grey belt and previously developed land have their own routes. The plan is the main route, not the only one.

Is land that was rejected for the 2024 plan worth another look now?

Often. The plan itself says its housing figure is below need, and the early review exists to test whether more capacity can be found. Evidence that was missing last time can be prepared now.

Is my land in the Green Belt or beyond it?

The council's interactive policies map shows the boundary. We check it, along with the Surrey Hills boundary and flood zones, as part of our free review.

Does aircraft noise rule out land that lies close to Gatwick?

Not usually. Noise affects where homes go on a site and how they are built. The plan itself directs a large share of new homes to the Hookwood area.

What happens when East Surrey takes over?

The 2024 Local Plan stays in force, and applications continue to be decided. The new council will take on the early review and, in time, a plan of its own.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Mole Valley Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Mole Valley stands on housing shapes which matter most here.

Selling Land in Mole Valley? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Surrey

  • County overview

    Selling Land in Surrey

    Sell land for development in Surrey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 102% of need

    Selling Land in Guildford

    Sell land in Guildford, near Ash. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 102% of need

    Selling Land in Reigate and Banstead

    Sell land in Reigate and Banstead. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 117% of need

    Selling Land in Waverley

    Sell land in Waverley, near Farnham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 59% of need

    Selling Land in Elmbridge

    Sell land for development in Elmbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 33% of need

    Selling Land in Epsom and Ewell

    Sell land in Epsom and Ewell. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 98% of need

    Selling Land in Surrey Heath

    Sell land for development in Surrey Heath: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 97% of need

    Selling Land in Woking

    Sell land in Woking, near Knaphill. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 33% of need

    Selling Land in Spelthorne

    Sell land for development in Spelthorne: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 38% of need

    Selling Land in Tandridge

    Sell land for development in Tandridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Runnymede

    Sell land for development in Runnymede: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Surrey

  • CrawleyWest Sussex · no current land supply figure
  • HorshamWest Sussex · 1.7 years of housing land

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.