Surrey council area
Selling Land in Woking
Checked on
Woking built 1,272 of the 1,308 homes it needed and passed the delivery test with 97%. Its land supply has been measured against a Core Strategy figure of 292 homes a year from 2012, which the council's 2023 review kept, but that strategy runs to 2027 and a new plan to 2044 is under way.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Woking and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Woking can show 8.1 years of housing land, more than the five years national policy expects, and built 97% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from October 2012, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Woking
- Plots, yards and larger gardens inside Woking, Knaphill, Byfleet, West Byfleet and the other built-up areas.
- Old yards, depots and commercial plots in the Green Belt, with a lawful use on record.
- Green Belt land enclosed by homes, roads, the railway or the canal that may be grey belt.
- Land safeguarded in the Site Allocations DPD for needs beyond 2027.
- Open holdings that could serve as SANG for homes elsewhere.
- Sites more than 400 metres from Horsell Common, Sheets Heath and Brookwood Heath.
We pay for every survey and report, including the heathland assessment, under an option whose price is settled on day one, above the land's present value. You keep using your land until the purchase completes, and if no permission is ever granted, it remains yours with nothing owed to us.
Is Your Land in Woking a Good Fit?
You do not need to know the planning rules to sell land for development in Woking. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Woking
There are three common ways to sell land with development potential in Woking. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Woking: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Woking and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Woking
Three things shape the chances of selling land for development in Woking: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
97%
Meeting its housing requirement.
Five-year housing land supply
8.1 years
Five years or more of deliverable housing land. Position at 1 April 2023, measured against the Core Strategy requirement of 292 homes a year, with the standard method (437) for 2027/28, plus a 5% buffer. Stated by Woking Borough Council, in its AMR 2023 supply supplement (its 2025 statement is published only as a scanned image).
Checked sourceHomes built against homes needed
1,272
of 1,308 needed, April 2022 to March 2025
Most recent strategic plan adopted
October 2012
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
New Local Plan to 2044 started; timetable aims for adoption in April 2029
Checked source
See how Woking compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A Railway Town Ringed by Heath and Green Belt
Woking Borough Council covers the town of Woking with Horsell, Sheerwater, Old Woking, Mayford and St John's, Knaphill and Brookwood to the west, and Byfleet, West Byfleet and Pyrford to the east. It covers about 64 square kilometres and had some 104,000 residents in 2021.
- Green Belt on most of the open land. The inspector who examined the Site Allocations DPD noted that, according to the Core Strategy, some 60% of the borough is Green Belt.
- Heath on the doorstep. Horsell Common, Sheets Heath and the Ash to Brookwood Heaths are part of the Thames Basin Heaths Special Protection Area, and the council's 2026 strategy says all of the borough falls within the zone where new homes need mitigation.
- Well connected. Woking, Brookwood and West Byfleet have stations, junction 11 of the M25 and junction 3 of the M3 are close by, the River Wey follows the south eastern boundary and the Basingstoke Canal crosses from west to east.
- A plan in two parts. The Core Strategy was adopted in October 2012 and looks ahead to 2027. The Site Allocations Development Plan Document followed on 14 October 2021.
- Close to target. Completions of 1,272, set against 1,308 required in the Housing Delivery Test 2025, gave a result of 97%.
Nearly every question about a Woking site comes back to three things: whether it is in the Green Belt, how it will be matched with SANG, and which housing figure the council's supply is measured against.
292 Homes a Year, and What It Means for Land for Sale in Woking
The Core Strategy plans for 4,964 homes over 2010 to 2027, or 292 a year. Reviews in 2018 and 2023 both found no need to change it, and the 2023 review set the figures side by side:
| Measure | Homes a year |
|---|---|
| Core Strategy requirement, 2010 to 2027 | 292 |
| Standard method need, as the 2023 review calculated it | 409 or 437 |
| Unmet need the review accepted | 117 to 144 |
The review kept the lower figure because of three constraints, the Green Belt, the Thames Basin Heaths and flood risk, and pointed to the inspector's acceptance of the Green Belt review when the Site Allocations DPD was examined.
The Council's Supply Calculation, and Three Ways It Has Been Reported
The working sits in the five-year supply supplement to the council's 2023 monitoring report:
| Part of the calculation | Council's figure |
|---|---|
| Base date | 1 April 2023 |
| 2023/24 to 2026/27 | 292 a year, or 1,168 homes |
| 2027/28, after the plan period | 437 homes, the standard method |
| Five-year requirement with a 5% buffer | 1,685 homes |
| Deliverable supply | 2,738 homes |
| Result | 8.1 years |
The same supply has been quoted three ways. The supplement gives 8.1 years with a 5% buffer, and 7.8 years in an illustration with 10%. The 2023 review quoted 7.8 years as the 5% result. The June 2024 action plan, prepared after a delivery result that brought a 20% buffer, put it at 7.1 years. The differences are all about the buffer; on every version the borough had well over five years against its own requirement at 1 April 2023.
The council has since published a 2025 statement covering April 2025 to March 2030. It is issued as a scanned document whose headline figure has not been reported elsewhere, so we check it directly when reviewing a site.
Over 3,000 Homes Allocated, and at Least 550 From the Green Belt
The Site Allocations DPD, which the inspector found sound in August 2021, identifies land for over 3,000 homes over the rest of the plan period. As the inspector put it, the DPD makes clear that "at least" 550 of them should come on Green Belt sites, including West Hall and Broadoaks, and it safeguards further land to meet needs beyond 2027.
The council's June 2024 delivery action plan records uneven completions:
| Year | Homes completed |
|---|---|
| 2019/20 | 303 |
| 2020/21 | 147 |
| 2021/22 | 386 |
| 2022/23 | 650 |
The plan blames the dip in 2020/21 on the pandemic and Brexit rather than a lack of land, and notes that viability on previously developed urban land limits the affordable housing such schemes can provide.
The Council's Finances and Sheerwater
The council issued a Section 114 notice in June 2023. The same action plan says the most notable effect on housing has been at Sheerwater, where the phases that had not started, with outline permission only, are no longer being taken forward by the council, and some empty homes will be brought back into use instead.
Routes to Permission If You Are Selling Land in a 60% Green Belt Borough
Where supply is measured against 292 homes a year, as in the 2023 review, the routes that do not depend on a shortfall carry most weight:
- Inside the town and villages. New homes within a settlement are judged under national policy S4, which weighs heavily in their favour: they should be approved unless the harm would substantially outweigh the benefits. Plots, backland and yards in Woking, Knaphill, Byfleet and West Byfleet come first.
- Brownfield land in the Green Belt. A former builder's yard, a lorry park or a site carrying lawful commercial buildings is treated on its own terms by Green Belt policy, although former farm buildings do not qualify. Our brownfield and yards page explains how they are judged.
- Grey belt. Green Belt land that plays only a weak part in the Green Belt's purposes can be grey belt, but homes on it need evidenced unmet need. The usual evidence is a supply short of five years, and against 292 homes a year the council's calculation shows 8.1 years at 1 April 2023, so a housing case on grey belt here is hard today and would strengthen only if the supply position changed. The purposes test and the Golden Rules that follow it are covered in our grey belt guide.
- Through the new plan. Safeguarded land and larger Green Belt holdings will in most cases come forward through the Local Plan to 2044 rather than an application.
Policy S5, which supports well related land beyond a settlement's edge where unmet need is shown, does not apply in the Green Belt, so it has limited reach in Woking.
For most owners selling land in Woking the result is a split: a plot or an old yard can be taken forward now, while a larger Green Belt holding is prepared for the 2044 plan.
Zone B Everywhere: SANG as the First Check on Any Land for Sale
The council adopted its latest Thames Basin Heaths avoidance strategy in January 2026. Within 400 metres of the heath there is a presumption against new homes. Between 400 metres and 5 kilometres, which the strategy says covers the whole borough, every scheme needs an appropriate assessment, SANG and a payment towards managing visitors on the heaths (SAMM).
| SANG | Status | Homes it can support |
|---|---|---|
| Horsell Common | Existing | 1,451 |
| Heather Farm | Existing | 1,275 |
| Brookwood Country Park | Existing | 1,036 |
| White Rose Lane | Existing | 425 |
| Brookwood Farm | Proposed in the Site Allocations DPD | 987 |
| Land south of Parvis Road, Byfleet | Proposed | 799 |
| Westfield Common | Proposed | 570 |
| Gresham Mill (two parts) | Proposed | 425 and 493 |
SANG is sized at 8 hectares per 1,000 residents, and the council sets aside 39.5% of all Community Infrastructure Levy receipts to pay for it. Schemes that pay no CIL contribute the same share of a notional CIL bill through a section 106 agreement, and SAMM is always secured that way. Our guide to section 106 and CIL explains how these costs come off a scheme's value, and we build them in from the start.
The strategy says enough SANG has been identified for the Core Strategy period. A plan to 2044 that provides for more homes will need more of it, so larger open holdings may have a role as greenspace in the next plan.
Woking as Its Core Strategy Runs Out in 2027: When to Sell Land
The 2023 review asked for the Core Strategy to be updated in time to adopt a replacement before its plan period ends in 2027, but the council's timetable now points to adoption in April 2029, and the next review of the strategy is due by October 2028. The 2023 calculation already switched to the standard method for 2027/28. From a base date of April 2027 every year of a five-year calculation falls after the plan period, so the figure the council then applies will shape the result. That figure is the council's to set, and we do not guess at it.
The New Local Plan to 2044
The council gave notice on 22 May 2026 that it had begun a new plan for 2027 to 2044 under the government's new plan-making approach, and consulted on its scope from 13 July 2026. Its timetable sets out the stages still to come:
| Stage | Council's date |
|---|---|
| Gateway 1 self-assessment | 25 September 2026 |
| Consultation on proposed content | 6 January to 19 February 2027 |
| Gateway 2 assessment | 26 April 2027 |
| Consultation on the draft plan | 14 January to 13 March 2028 |
| Submission for examination | 29 September 2028 |
| Adoption | April 2029 |
The January 2027 consultation is the first point at which land is likely to be weighed, so evidence for a site is best prepared by the end of 2026. Those stages are explained in our local plan guide.
The government's review of reorganisation, launched on 7 September 2026, leaves Surrey unaffected, so West Surrey Council still starts in April 2027. A report to the council's Executive in March 2026 noted that any new West Surrey local plan is unlikely to be prepared for some time, which is why Woking is pressing on with its own.
Delivery is close to the line. The Housing Delivery Test 2025 appeared on 17 August 2026, with a new edition each year. At 97%, Woking built 36 fewer homes than required but still cleared the 95% line. A result under 95% would bring back an action plan, like the one prepared in June 2024; under 85% the supply calculation would carry a 20% buffer; and under 75% policy S5 would regard unmet need as shown.
Settlement Sites Now, Safeguarded Land for January 2027
- Sites inside the settlements and previously developed land can be reviewed straight away.
- Safeguarded and larger Green Belt land is best readied for the January 2027 consultation.
- Any site needs its SANG route settled early.
Questions About Selling Land in Woking
Which housing figure is Woking's land supply measured against?
For the years to 2027, the Core Strategy's 292 homes a year, which the 2023 review found still up to date. Later years are the ones to watch, because the margin above five years depends on the figure used for them.
What happens now to land safeguarded in the Site Allocations DPD?
Safeguarded land was set aside for needs beyond 2027, and the new plan to 2044 is where that need will be decided. It does not carry permission today, but it is a strong starting point, and preparing its evidence before the January 2027 consultation is the most useful step.
All of Woking is within 5 kilometres of the heaths. Does that rule my site out?
No. Outside the 400 metre zone, homes can be made acceptable with SANG and a SAMM payment. For most schemes the SANG is funded through CIL, and larger holdings may provide their own.
Does the council's Section 114 notice affect my planning application?
The council says its most notable effect on housing has been at Sheerwater, its own regeneration project. Applications on private land are still decided against the development plan and national policy.
Could a field in the Green Belt near Mayford count as grey belt land?
It may. Grey belt turns on how much a parcel does for the Green Belt's purposes, and a field hemmed in by homes or roads often does less than open country. Housing on grey belt land also needs evidenced unmet need, which is hard to show against 292 homes a year, so we assess both before advising.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Woking Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in Woking, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in Woking? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Surrey
County overview
Selling Land in Surrey
Sell land for development in Surrey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 102% of need
Selling Land in Guildford
Sell land in Guildford, near Ash. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 98% of need
Selling Land in Surrey Heath
Sell land for development in Surrey Heath: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 59% of need
Selling Land in Elmbridge
Sell land for development in Elmbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 94% of need
Selling Land in Runnymede
Sell land for development in Runnymede: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 102% of need
Selling Land in Reigate and Banstead
Sell land in Reigate and Banstead. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 117% of need
Selling Land in Waverley
Sell land in Waverley, near Farnham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 33% of need
Selling Land in Epsom and Ewell
Sell land in Epsom and Ewell. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 72% of need
Selling Land in Mole Valley
Sell land for development in Mole Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 33% of need
Selling Land in Spelthorne
Sell land for development in Spelthorne: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 38% of need
Selling Land in Tandridge
Sell land for development in Tandridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Sources
- Woking Borough Council: Core Strategy Review 2023 (September 2023)
- Woking Borough Council: AMR 2023 Five Year Housing Land Supply supplement, base date 1 April 2023
- Woking Borough Council: Housing Delivery Test Action Plan (June 2024)
- Woking Borough Council: Five Year Housing Land Supply Position Statements
- Woking Borough Council: Site Allocations Development Plan Document (adopted October 2021)
- Planning Inspectorate: Report on the examination of the Woking Site Allocations DPD (August 2021)
- Woking Borough Council: Thames Basin Heaths SPA Avoidance Strategy (January 2026)
- Woking Borough Council: Help shape the next stage of Woking's new Local Plan (July 2026)
- Woking Borough Council: Timetable for our new Local Plan (May 2026)
- Woking Borough Council: New Local Plan for Woking, next steps and timetable, Executive (March 2026)
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
- Wikipedia: Borough of Woking
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.