Skip to content

We pay for the planning.

Call us:020 3953 5635

Surrey council area

Selling Land in Tandridge

Checked on

Tandridge says it has more Green Belt than any other district in the country, and its Core Strategy dates from 2008. After a failed plan and a fresh start in 2024, the council is now weighing sites for homes at almost eight times its old annual target.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Tandridge and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Tandridge built only 38% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 2.17 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from October 2008, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Tandridge

  • Paddocks and small fields on the edge of Caterham, Oxted, Warlingham, Lingfield, Smallfield and the other larger settlements, especially where homes wrap around two or more sides.
  • Former nurseries, yards, depots and equestrian sites with lawful buildings or hardstanding, in or outside the Green Belt.
  • Fields a short walk from a station with a regular train service.
  • Sites with a safe access onto a road, or a realistic way of securing one.
  • Larger holdings that could contribute to the growth the new Local Plan has to find.

Small sites count here. Many of the best Tandridge opportunities are an acre or two behind a village street rather than open farmland, as our page on paddocks and small sites explains. Where we take a site on, we pay for every report, application and any appeal, and you keep using the land until completion.

Is Your Land in Tandridge a Good Fit?

You do not need to know the planning rules to sell land for development in Tandridge. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Tandridge

There are three common ways to sell land with development potential in Tandridge. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Tandridge: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Tandridge and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Tandridge

Three things shape the chances of selling land for development in Tandridge: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    38%

    Below 75%: treated as having evidenced unmet housing need under national policy S5.

  • Five-year housing land supply

    2.17 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 October 2025, measured against local housing need by the standard method, 827 homes a year, plus a 20% buffer. Stated by Tandridge District Council, in its interim position at 1 October 2025 (Annual Monitoring Report, December 2025).

    Checked source
  • Homes built against homes needed

    732

    of 1,915 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    October 2008

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    New plan to 2044: spatial strategy consultation summer 2026

    Checked source

See how Tandridge compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Selling Land in a Green Belt District Still on Its 2008 Plan

Tandridge takes in Caterham, Whyteleafe and Warlingham, Oxted and Hurst Green, Godstone and Nutfield, and the villages of Lingfield, Dormansland, Felbridge, Smallfield and Burstow, along with Woldingham, Limpsfield and Tatsfield. The council's summer 2026 consultation held drop-in events in eight places, from Warlingham Library to the Aileen McHugo Building in Tatsfield.

  • The most Green Belt of any district. The council puts its Green Belt at 94% of the district, which it describes as the highest in the country.
  • A 38% delivery result. Over three years the Housing Delivery Test 2025 recorded 732 homes built, with 1,915 needed in the same period.
  • Two National Landscapes. The council names the Surrey Hills and the High Weald as the two protected landscapes in the district.
  • A plan started from scratch. Full Council agreed on 18 April 2024 to begin a new Local Plan for 2024 to 2044, after the withdrawal of Our Local Plan 2033.
  • A new council from April 2027. Tandridge will become part of East Surrey, which the council says will use the new plan for decisions in the former district if it is adopted.

That leaves a long record of under-delivery and almost no land that is not protected in some way, so sites here succeed on careful, site-specific evidence rather than on the housing numbers alone.

Why a 38% Score Works Differently When You Sell Land in Tandridge

In most districts, a delivery result this far below 75% would make a large number of edge-of-village fields worth putting forward under policy S5 of the national framework, which supports homes on land well related to a settlement where housing need is unmet. That route does not apply in the Green Belt. With 94% of Tandridge in the Green Belt, the practical effect of the score is narrower, and it works through three doors:

  1. Land inside settlements drawn out of the Green Belt. Where a town or village is inset, policy S4 says development inside it should be approved unless the harm substantially outweighs the benefits. Long back gardens, garage blocks and underused commercial plots all fall here.
  2. Grey belt. A field that does little to check the spread of London, to keep towns apart or to protect a historic setting can be grey belt. The council's own Local Plan page points to the change in national policy that allows Green Belt to be reclassified as grey belt. Homes on grey belt also need an evidenced unmet need, and with the council's own supply at 2.17 years, the Hurst Green inspector found that need was there. Schemes must then meet the Golden Rules.
  3. Previously developed land. Former nurseries with permanent buildings, haulage and builders' yards, and redundant commercial sites have their own routes in Green Belt policy, provided the buildings or hardstanding have a lawful use.

The Golden Rules require a higher share of affordable housing than normal, plus the infrastructure and public green space a scheme needs. On a paddock behind Lingfield or Smallfield they can take a noticeable share of the land, so layout and costings are worked out together. Our grey belt guide explains the tests in full.

For the owner of a long garden, garage block or underused commercial plot inside an inset town or village, the first of those doors is usually the most direct route to a sale, because the Green Belt tests do not apply there.

Selling Land Into the Tandridge Plan for 2024 to 2044

Why the Last Plan Failed

Our Local Plan 2033 would have provided about 6,000 homes, 4,000 of them in a garden village at South Godstone. As reported by Surrey Live in 2023, the inspector, Philip Lewis, wrote in May that year that the plan as submitted was unsound and that he had not been able to see how it could be made sound. His concerns included the changes the garden village would need at junction 6 of the M25 and the huge costs of those works, and he described the plan and its evidence as increasingly dated. The plan was withdrawn, and the council started again in April 2024.

The Scale of the New Plan

The council says the government's figure for the district is currently 983 homes a year, against 125 a year in the 2008 Core Strategy, and that around 2,000 homes already have planning permission. A figure of that size gives landowners across the district a real stake in the plan.

Why the Council Quotes Both 12,300 and 983 a Year

The same council page gives the district's target as around 12,300 homes over 15 years and, a line later, as 983 homes a year. Multiplied out, 983 a year over 15 years is nearer 14,700, and the page does not explain the difference. Deducting the 2,000 homes with permission does not close the gap exactly, and because the standard method is recalculated as new data are published, the two numbers may have been written at different times. For a landowner it changes little: either figure is many times what the district has been building, and the draft plan will set the number the inspector tests.

Where the Plan Has Reached

The council's announcement of its summer 2026 consultation on the spatial development strategy gave dates of 6 July to 17 August, with drop-in events from Warlingham to Burstow and South Godstone. Its Local Plan page later says paper surveys had to be back by 2 September 2026, which suggests paper responses were given longer. Its Housing and Employment Land Availability Assessment, published in June 2026, includes a separate assessment for each parish, so owners can see how any site already put forward has been judged.

If your land was left out of the June 2026 assessment, or its parish assessment marks it down on access or landscape, the strategy stage is still early enough for new evidence to change that verdict. What each later stage asks of a site is set out in our guide to how sites move through a local plan.

Selling Land Near the Downs, the Weald or Ashdown Forest

Inside the Surrey Hills and High Weald National Landscapes, major development faces the highest bar in national policy, and land just outside them is often judged on how it would look from the protected landscape. In the High Weald the concern is often small fields, hedges and historic lanes, and a well-designed scheme that keeps those features has a far better chance than one that ignores them.

The Surrey Hills boundary may be redrawn. The boundary variation order Natural England submitted on 7 September 2026 includes proposed additions named the Woldingham Valleys and Limpsfield. It has no effect until the government confirms it, but landscape evidence there will be read with it in mind.

The Ashdown Forest Zone

Part of the district lies within the 7 kilometre zone around the Ashdown Forest Special Protection Area. Dormansland's neighbourhood plan group has written the requirement into its policy DNP10: residential schemes in the zone must avoid and mitigate their impact, through a bespoke area of natural green space, a contribution to strategic access management and monitoring, or other measures agreed with the council and Natural England. That plan is not among those the council lists as made, but the requirement stands regardless. It is a cost to plan for, not a reason to rule a site out, and on a large enough holding part of the land can provide the green space itself.

Roads, Rivers and Neighbourhood Plans

Local factorWhat it means for a site
M25 junction 6The cost of changes at this junction was one of the inspector's concerns with the last plan. Traffic evidence will matter again for any larger scheme that relies on it.
Rivers and streamsSurrey County Council names the River Mole and its tributaries and the River Eden among the main watercourses, along with the Eden Brook, Gibbs Brook, Burstow Stream and Salfords Stream. Homes can usually be kept to the drier ground. See our flood risk guide.
The 2013 to 2014 floodsThe county's investigation recorded flooding that winter in Lingfield, Smallfield, Oxted, Godstone, Caterham, Felbridge, Burstow, Horne, Nutfield, Outwood, Warlingham and Whyteleafe.
Wealden geologyThe same report describes the upper catchments as Wealden Group rock that is typically very impermeable, so rivers respond rapidly to rain and drainage design needs close attention.
Neighbourhood plansThe council lists four as made: Caterham, Chaldon and Whyteleafe (June 2026), Tatsfield (2024), Limpsfield (2019) and Woldingham (2016). In those parishes their policies sit alongside the council's own.

The adopted development plan itself is the Core Strategy of October 2008 and the Local Plan Part 2 detailed policies adopted in July 2014. We commission the drainage and highways work early, at our cost, because on Tandridge's heavy ground and busy junctions those two reports often decide a scheme.

The Year Ahead for Land in Tandridge

The government publishes the Housing Delivery Test once a year, and the latest, the Housing Delivery Test 2025, arrived on 17 August 2026. While the district stays below 75%, national policy treats its need for homes as unmet, and because each result averages three years of building, one good year moves it only part of the way. With almost the whole district in the Green Belt, that finding and the short supply of sites work mainly through the grey belt tests and the weight given to new homes.

What the Hurst Green Appeal Tells Us

On 17 September 2026 an inspector dismissed an appeal for up to 132 homes on land south of Warren Lane, Hurst Green. As Planning Geek reported it, the inspector found the site was grey belt and gave substantial weight to the market and affordable homes. The decision letter records that the council did not dispute its lack of a five-year supply. Its Annual Monitoring Report of December 2025 puts the supply at 2.17 years at 1 October 2025: 2,158 deliverable homes against 4,964 needed, the standard method's 827 a year plus a 20% buffer. The appeal failed because the scheme could not show that residents would be free of unacceptable odour from the Oxted Wastewater Treatment Works. The principle was won and the detail lost, which is why we commission the specialist reports before anything is submitted.

The Plan, and the Handover to East Surrey

The council says the new plan is being prepared under the system brought in by the Levelling-up and Regeneration Act, which aims to cut plan-making to about 30 months, and its Local Plan page now links a revised Local Development Scheme dated June 2026. It also says every existing plan and its evidence will carry over to East Surrey and stay in place until replaced, so the 2008 Core Strategy and the 2014 detailed policies will still govern decisions after April 2027 until the new plan is adopted.

A field that may already be grey belt can be tested through an application while supply stays this short. Land that needs the plan to release it is best put in front of the council before the draft plan that names sites is written.

Questions About Selling Land in Tandridge

Ninety-four per cent of the district is Green Belt. Is there any realistic chance for my field?

For the right field, yes. Grey belt, previously developed land and release through the new Local Plan are all live routes. The key is how your land sits against the purposes of the Green Belt, which we assess before anything else.

I put my land forward for the old Local Plan 2033. Does that still count?

The council started again in 2024 and has published a fresh land assessment. If your site appears in the June 2026 assessment, it is already known to the council. If it does not, it can still be put forward, and we can advise on the best moment.

Will the move to East Surrey in 2027 delay things?

Applications carry on being decided throughout, and the council expects work on the Local Plan to continue under East Surrey. A change of council does not reset the planning status of your land.

What does the Ashdown Forest zone mean for a landowner near Dormansland like me?

New homes there need mitigation, typically a contribution to visitor management or, on bigger schemes, new natural green space. We build that into the scheme and the costings from day one, so it is dealt with rather than discovered late.

Is an old yard just outside a village treated differently from a field?

Often it is. Land with lawful buildings or hardstanding counts as previously developed and has its own routes under Green Belt policy. Glasshouses used for farming are the usual exception. We check the planning history as part of our free review.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Tandridge Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Tandridge stands on housing shapes which matter most here.

Selling Land in Tandridge? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Surrey

  • County overview

    Selling Land in Surrey

    Sell land for development in Surrey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 102% of need

    Selling Land in Reigate and Banstead

    Sell land in Reigate and Banstead. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 102% of need

    Selling Land in Guildford

    Sell land in Guildford, near Ash. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 98% of need

    Selling Land in Surrey Heath

    Sell land for development in Surrey Heath: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 117% of need

    Selling Land in Waverley

    Sell land in Waverley, near Farnham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 97% of need

    Selling Land in Woking

    Sell land in Woking, near Knaphill. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 59% of need

    Selling Land in Elmbridge

    Sell land for development in Elmbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 33% of need

    Selling Land in Epsom and Ewell

    Sell land in Epsom and Ewell. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 72% of need

    Selling Land in Mole Valley

    Sell land for development in Mole Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 33% of need

    Selling Land in Spelthorne

    Sell land for development in Spelthorne: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Runnymede

    Sell land for development in Runnymede: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Surrey

  • CrawleyWest Sussex · no current land supply figure
  • Mid SussexWest Sussex · 3.75 years of housing land
  • SevenoaksKent · 3.59 years of housing land
  • WealdenEast Sussex · 3.65 years of housing land