Surrey council area
Selling Land in Runnymede
Checked on
Runnymede's housing delivery result of 94% looks respectable, yet the council's own September 2025 statement found 2.89 years of housing land. In a borough that is about three quarters Green Belt, with the Thames floodplain along its eastern edge, that shortfall is the fact a landowner most needs to know.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Runnymede and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Runnymede can show 2.89 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from July 2020, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Runnymede
The council's Urban Area Capacity Study of May 2026 took 77 sites inside the built-up areas forward for assessment, 17 of them in the Addlestone, Chertsey and Egham town centres and 7 in local centres, and gives a capacity of up to 1,608 more homes. Set against the 6,400 or more homes the new plan is scoping, the urban capacity it quantifies falls well short, which is why the Green Belt review matters so much here. The 2025 land availability assessment, published the same month, considered 189 sites but leaves the question of which are grey belt to later site selection. That test is still open for every field, and we look for:
- Car parks, garage blocks, offices and employment land in or near the Addlestone, Chertsey and Egham centres, the kinds of urban site the study assessed.
- Enclosed land on the edges of Addlestone, Chertsey, Egham, Ottershaw, Englefield Green or Virginia Water, bounded by homes and roads, that the joint Green Belt review could class as grey belt.
- Previously developed land anywhere in the borough, in or out of the Green Belt.
- Land within an easy walk of Egham, Virginia Water, Chertsey or Addlestone station.
- Part or all of an allocated site that has not yet started.
- Sites of 0.25 hectares or five homes upwards, the size the council's assessment records, and smaller paddocks and small sites too.
Land lying wholly in the Thames floodplain in the east of the borough, and open fields well away from any town or village, are harder cases. We still review them, and we will tell you plainly if the evidence points against a scheme.
Is Your Land in Runnymede a Good Fit?
You do not need to know the planning rules to sell land for development in Runnymede. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Runnymede
There are three common ways to sell land with development potential in Runnymede. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Runnymede: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Runnymede and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Runnymede
Three things shape the chances of selling land for development in Runnymede: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
94%
Below 95%: the council must publish an action plan to improve delivery.
Five-year housing land supply
2.89 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 640 homes a year, plus a 5% buffer. Stated by Runnymede Borough Council.
Checked sourceHomes built against homes needed
1,425
of 1,516 needed, April 2022 to March 2025
Most recent strategic plan adopted
July 2020
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
No recent stage listed
Check the council's website for its timetable.
See how Runnymede compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Runnymede, Where the M25 Meets the M3
Runnymede Borough Council covers the towns of Addlestone, Chertsey and Egham, the villages of Englefield Green, Virginia Water, Ottershaw, New Haw, Woodham and Thorpe, and Longcross Garden Village. Its 2030 Local Plan describes a borough twenty miles from central London at the junction of the M25 and M3, served by six railway stations, and names the Thames along its eastern boundary, the Basingstoke Canal to the south east, and the Wey and the Addlestone and Chertsey Bournes running through Addlestone and Chertsey.
- Mostly Green Belt. The council's September 2026 scoping document puts the Green Belt at 74% of the borough.
- Much of it floodplain. The 2030 Local Plan records about 30% of the borough in Flood Zones 2 and 3.
- A delivery result of 94%. In the Housing Delivery Test 2025 that means an action plan, but no buffer and no presumed unmet need.
- Short of housing land. The September 2025 statement calculated 2.89 years of supply.
- A plan from 2020. The Runnymede 2030 Local Plan was adopted in July 2020, and the council accepts its policies are now more than five years old.
- West Surrey from April 2027. Runnymede will join Guildford, Spelthorne, Surrey Heath, Waverley and Woking in one unitary council.
The 2030 Local Plan itself described approximately 79% of the borough as Green Belt. The two figures are six years apart, and the plan went on to release some land from the Green Belt for its own allocations, which is the likeliest reason the current figure is lower. Either way, about three quarters of the open land a landowner might hold here is Green Belt, and that shapes everything below.
Selling Land in Runnymede With a 94% Result and 2.89 Years of Housing Land
Runnymede's delivery result has moved about from one edition to the next. The council's October 2024 action plan answered a result of 87% in the 2022 measurement; its September 2025 land supply statement quotes 114% for the 2023 measurement; and the Housing Delivery Test 2025 gives 94%. At that level the council must again explain how it will improve delivery, but national policy does not treat it as having unmet need on the score alone, and no 20% buffer applies.
The Number That Carries More Weight
The five-year supply is a different story. The September 2025 statement, based at 1 April 2025, measured supply against the standard method figure of 640 homes a year, because the plan is more than five years old, and added a 5% buffer. It found 1,943 deliverable homes, equal to 2.89 years. The scoping document explains the jump behind it: the figure the council plans for has risen from 500 to 640 homes a year.
Under the August 2026 National Planning Policy Framework a shortfall in the five-year supply is evidence of unmet housing need, to be weighed with everything else rather than an automatic finding. In Runnymede that evidence matters twice over. It supports the unmet need route in policy S5 on land outside the Green Belt, and it helps meet the need test that grey belt land has to pass before homes can be approved.
Routes to Permission If You Are Selling Land in Runnymede
- Inside the towns and villages. Policy S4 favours homes within settlements unless the harm substantially outweighs the benefits. The scoping document identifies Addlestone, Chertsey and Egham as the main town centres, where yards, car parks and tired commercial buildings start from a strong position.
- Settlement edges outside the Green Belt. Where a field on the edge of a settlement is not itself Green Belt, the supply shortfall can support an application under S5, provided the land is physically well related to the place and the roads, schools and drainage can cope.
- Grey belt. The council is carrying out a Green Belt review jointly with Elmbridge and Spelthorne, which will identify potential grey belt land. Parcels that do little to check sprawl or keep towns apart can qualify, provided the scheme meets the Golden Rules, which cover affordable homes, new infrastructure and access to green space. Our grey belt guide sets out each test.
- Previously developed land. Former yards, depots and sites with lawful non-agricultural buildings have their own routes within Green Belt policy.
- Near the stations. National policy now favours homes within reasonable walking distance of well-connected stations, which is worth testing on land close to Egham, Virginia Water, Chertsey or Addlestone.
Most Runnymede sites fall under more than one of these, and the order we test them in depends on where the Green Belt boundary runs across the land. A paddock that straddles the boundary, for example, is assessed in two parts.
Selling Land Near the Heaths or the Floodplain, and What a Permission Costs
Two local constraints add cost rather than ruling land out, and both are allowed for from the start.
| Requirement | What the council asks for |
|---|---|
| Thames Basin Heaths | New homes within about 5km of Chobham Common need mitigation. The council's rates are £903.50 per occupant towards its greenspace (SANG) and, for 2026/27, £457.29 per occupant for access management (SAMM), up from £443.11. On-site SANG is typically viable only from around 60 homes. |
| Chobham Common itself | The 2030 Local Plan notes that a small part of the borough on its western side lies within 400 metres of Chobham Common, part of the protected heaths. |
| Affordable housing | Policy SL20 expects 35% affordable homes on schemes of 10 or more net new homes, split 70% rented and 30% other tenures, as set out in the April 2025 guidance. |
| Wider infrastructure | The scoping document says developer contributions do not fully meet the funding gap, and names the M25 Junction 11 improvements and the A320 corridor. |
These costs come out of the value of a scheme, not out of your pocket, and our guide to section 106 and CIL explains how they are worked out.
The Floodplain
The scoping document notes the higher flood risk in the east of the borough from the Thames and its tributaries, and refers to the River Thames Scheme as a nationally significant infrastructure project. Land partly in Flood Zones 2 or 3 is not automatically ruled out, since homes can often be kept to the drier part, but it needs flood evidence early.
For the owner of a paddock near Egham or Chertsey with a dry corner, that early flood evidence is often what turns a doubtful field into one worth taking forward.
Selling Allocated Land That Has Not Come Forward
The council's October 2024 action plan is unusually frank about why homes have been slow. Among the reasons it gives:
- Changes in developers' intentions for sites they own or control.
- Fractured ownership, with several landowners inside a single allocation.
- Housing associations taking on fewer section 106 homes.
- Higher construction costs and limits on infrastructure and utilities.
It also says a handful of allocated sites have still not come forward and that the council will contact their owners about the barriers. Longcross Garden Village has outline permission for 1,700 homes, and the action plan recorded 186 completed on the northern site. If you own part of an allocation, or land next to one that could help it work, that is a conversation worth having.
When to Sell Land in Runnymede, With a New Plan and a New Council
The council gave notice in June 2026 that it would prepare a new local plan under the reformed system, and its scoping consultation ran from 7 September 2026 to 11.59pm on Monday 12 October 2026. Landowners were invited to put sites forward as part of it. The council's timetable, approved by its planning committee on 25 February 2026 and updated on 24 September 2026, then shows the Gateway 1 self-assessment running from 1 to 30 October 2026, consultation on the vision and strategy in June and July 2027, consultation on the proposed plan in April and May 2028, submission in September 2028, examination from October 2028 to March 2029 and adoption in April 2029. The scoping document proposes a plan period of ten years from adoption, which at 640 homes a year means about 6,400 homes, rising to 9,600 over fifteen.
On 1 April 2027 a West Surrey unitary council replaces Runnymede and the other five borough and district councils in the west of the county. The council expects the new plan still to cover Runnymede's own area, and says the other five councils are taking a similar approach and starting plans of their own. The plan will therefore be finished by the new council, not the one that started it.
A Result That Has Swung, and a Supply Short of Five Years
The delivery test is published each year, and the Housing Delivery Test 2025 was issued on 17 August 2026. A rise to 95% would end the duty to prepare an action plan. A fall below 85% would add a 20% buffer to a supply already short of five years, and a fall below 75% would mean unmet need was treated as existing without further evidence. Given how far the result has moved between editions, we would not read much into any single year, and we have not seen completion figures for 2025/26.
On supply, the September 2025 statement is the latest we have found, and no 2026 statement had been published when we checked. A new statement could move the figure either way.
An Application While Supply Is Short, the Plan at the Same Time
The new plan will not be adopted until 2029 at the earliest, and its sites will be chosen from land put forward from the scoping stage that closed in October 2026 onwards, ahead of the proposed plan the timetable places in April and May 2028. A strong site can go forward by application while the supply is short and be put forward for the plan at the same time. We cover the cost of both, and how it works explains the steps.
Questions About Selling Land in Runnymede
Runnymede scored 94%. Does that help my planning case?
Not much by itself. The score avoids the stronger consequences in national policy. The land supply is what helps: a shortfall is evidence of unmet need, and the council's last statement found 2.89 years.
Is a Green Belt field here worth asking about?
Yes. The joint Green Belt review with Elmbridge and Spelthorne is looking for potential grey belt land, and enclosed or previously developed parcels can qualify now. We assess your land against each Green Belt purpose in our review.
Should I put my land forward in the scoping consultation?
It helps to be in early. The scoping consultation ran to 11.59pm on 12 October 2026 and invited sites, which feed the council's land availability assessment. The next public stage is the consultation on the vision and strategy, which the council's timetable of 24 September 2026 places between 1 June and 13 July 2027, and we can prepare the submission for you in good time for it.
Can land near Chobham Common still take homes?
Usually, with mitigation. Homes within about 5km pay towards greenspace and access management, and larger schemes can provide their own greenspace. Land within 400 metres needs closer thought.
Will West Surrey Council change my prospects?
Not overnight. The new plan is expected to cover Runnymede's area on the timetable already set, and until it is adopted the current plan and national policy guide decisions.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Runnymede Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Runnymede stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Runnymede? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Surrey
County overview
Selling Land in Surrey
Sell land for development in Surrey: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 98% of need
Selling Land in Surrey Heath
Sell land for development in Surrey Heath: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 97% of need
Selling Land in Woking
Sell land in Woking, near Knaphill. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 59% of need
Selling Land in Elmbridge
Sell land for development in Elmbridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 33% of need
Selling Land in Spelthorne
Sell land for development in Spelthorne: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 102% of need
Selling Land in Guildford
Sell land in Guildford, near Ash. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 102% of need
Selling Land in Reigate and Banstead
Sell land in Reigate and Banstead. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 117% of need
Selling Land in Waverley
Sell land in Waverley, near Farnham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 33% of need
Selling Land in Epsom and Ewell
Sell land in Epsom and Ewell. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 72% of need
Selling Land in Mole Valley
Sell land for development in Mole Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 38% of need
Selling Land in Tandridge
Sell land for development in Tandridge: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Surrey
- Windsor and MaidenheadBerkshire · 4.04 years of housing land
Sources
- Runnymede Borough Council: Consultation opens on a new Local Plan for Runnymede (September 2026)
- Runnymede Borough Council: New Local Plan scoping consultation document (September 2026)
- Runnymede Borough Council: Local Plan timetable (February 2026)
- Runnymede Borough Council: Local Plan news and FAQs
- Runnymede Borough Council: Five year housing land supply statement (September 2025)
- Runnymede Borough Council: Strategic Land Availability Assessment 2025 (May 2026)
- Runnymede Borough Council: Urban Area Capacity Study (May 2026)
- Runnymede Borough Council: Housing Delivery Test Action Plan (October 2024)
- Runnymede Borough Council: Runnymede 2030 Local Plan (adopted July 2020)
- Runnymede Borough Council: Planning obligations, local requirements
- Runnymede Borough Council: Affordable Housing Supplementary Planning Document (April 2025)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.