West Sussex council area
Selling Land in Horsham District
Checked on
Horsham District built fewer than half the homes it needed, has no Green Belt and saw its biggest barrier to building, water neutrality, lifted in October 2025. Its new local plan is now in the final stretch of examination, with a higher housing figure than the one debated at its hearings in April 2026.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Horsham District and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Horsham District built only 44% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 1.7 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from November 2015, and a new one was submitted for examination in July 2024.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Horsham District
- Fields of 2 acres or more on the edge of Horsham, Southwater, Billingshurst, Henfield, Storrington, Pulborough and the larger villages.
- Land that sits well against existing homes, rather than out on its own in open country.
- Sites with a road frontage or a realistic way to reach one.
- Land mostly in Flood Zone 1, outside the National Park and the High Weald.
- Sites where water neutrality stopped an earlier approach.
- Larger holdings that could form part of later phases of growth.
Many of the holdings we see in this rural district are working farms, and an option does not stop the farming. You keep grazing or cropping the fields until permission is secured and we complete at the fixed price agreed at the start, which is set above what the land is worth to you today. Every planning cost falls on us, if the application fails you owe nothing, and we contribute to your own solicitor's and land agent's fees so getting it done properly costs you nothing. How this fits around a farm business is described on our farmland page.
Is Your Land in Horsham District a Good Fit?
You do not need to know the planning rules to sell land for development in Horsham District. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Horsham District
There are three common ways to sell land with development potential in Horsham District. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Horsham District: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Horsham District and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Horsham District
Three things shape the chances of selling land for development in Horsham District: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
44%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
1.7 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 1,338 homes a year, plus a 20% buffer. Stated by Horsham District Council.
Checked sourceHomes built against homes needed
1,217
of 2,776 needed, April 2022 to March 2025
Most recent strategic plan adopted
November 2015
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Submitted for examination
As at July 2024.
See how Horsham compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Selling Land in a Rural District With No Green Belt
The council's submitted Local Plan describes a predominantly rural district of 530 square kilometres, of which 95 square kilometres lie in the South Downs National Park, where Horsham District Council is not the planning authority. It names Horsham as the main town and places Southwater, Billingshurst, Broadbridge Heath, Storrington and Sullington, Steyning, Henfield, Pulborough and Codmore Hill, Kilnwood Vale, Upper Beeding and Bramber in the tier below. The plan identifies two landscapes of national importance in the district, the High Weald and the South Downs.
- Delivery at 44%. In the Housing Delivery Test 2025 the council delivered 1,217 homes where 2,776 were required.
- A strategic plan from 2015. The Horsham District Planning Framework, adopted in November 2015, is still the adopted plan.
- A new plan close to the finish. The Local Plan 2023 to 2040 was submitted on 26 July 2024. Main modifications raising the housing requirement to 18,712 homes were consulted on from 13 July to 24 August 2026.
- No Green Belt. In 2024 councillors explored applying for Green Belt on land between Horsham and Crawley, which local reporting noted would be the first in the district. Countryside policies and built-up area boundaries do the work that Green Belt does elsewhere.
- Water neutrality has gone. Natural England withdrew its position statement on 31 October 2025.
Put together, a delivery result below half, no Green Belt and a pipeline no longer held up by water give well-placed land in Horsham District several routes to planning at once.
Selling Land in Horsham as the Local Plan 2023 to 2040 Nears Adoption
The plan has had a long examination. Its first hearings, in December 2024, were halted, and local reporting records that the inspector at the time raised a number of concerns and suggested the plan be withdrawn. A new inspector, Jonathan Bore, restarted the examination with stage one hearings in April 2026, and his post-hearing letter of 7 May 2026 led to a set of main modifications to make the plan sound.
- 13 July to 24 August 2026. Consultation on the main modifications.
- 13 to 23 October 2026. Stage two hearings, with reserve dates set aside.
- Early 2027. The council's stated aim for adoption, after the inspector's final report.
A Bigger Number, and a New Strategic Site
When the hearings resumed in April 2026, local reporting put the requirement at 17,828 homes, the district's own need plus half of Crawley's, with documents showing a shortfall of 2,398 against it. The modified requirement of 18,712 homes is made up of Horsham's own need of 14,071, half of Crawley's unmet need at 3,757, and 884 homes towards unmet need along the south coast. It is stepped: 499 homes a year in years four and five, 1,100 a year in years six to ten, and 1,601 a year from year eleven.
To meet it, the council has proposed a new strategic site at Adversane, near Billingshurst, for about 3,200 homes, of which around 1,425 would be built within the plan period. The modifications say it was chosen partly because it identifies land for a secondary school and is relatively close to Billingshurst station. It is one of 19 new sites, which local reporting puts at around 6,664 homes in all, including 500 north of Horsham, a northern cluster of 450 at Ashington and two sites at Henfield. The existing strategic allocations, Land West of Ifield, Land North West of Southwater and Land East of Billingshurst, remain.
On 16 September 2026 the inspector confirmed that the plan is being examined against the September 2023 version of national policy, because its pre-submission consultation took place before the cut-off for later versions. Once adopted, it will replace the 2015 framework as the basis for decisions.
For an owner selling land near Adversane, Billingshurst or Ashington, the modifications are the document to read, because they show which new sites the inspector is being asked to accept.
Selling Land in Horsham After Water Neutrality
From September 2021, Natural England's position was that new homes supplied from the Sussex North water supply zone must not add to the water taken from the Arun Valley. The sites it protects are designated three times over, as a Special Area of Conservation, a Special Protection Area and a Ramsar site, and include Pulborough Brooks, Waltham Brooks and Amberley Wild Brooks.
Natural England withdrew that position on 31 October 2025, after Southern Water committed to cut its licence to take groundwater at Hardham from 16.44 to 13 million litres a day, a change expected to be completed by March 2026. The council has confirmed:
- Water neutrality statements are no longer required with applications.
- The planned Sussex North water certification scheme will not be launched.
- Where permission was granted with water neutrality conditions, it will consider applications under section 73 to remove them, replacing them with a standard water efficiency condition.
- New homes must still meet the optional water standard of 110 litres per person per day, under Policy 37 of the 2015 framework.
Why the Modifications Say October 2024
The covering text of the schedule of modifications refers to a legacy effect from the period "between September 2021 and October 2024" when water neutrality was in place, during which very few planning permissions were granted. Natural England's own withdrawal statement is dated 31 October 2025, and the council's water neutrality page gives the same date, so the earlier year looks like a slip in the covering text rather than a different end date. The point it makes holds either way: the neutrality years produced few permissions, which is why the new requirement starts low and rises later. For a landowner, that means the council has a strong interest in sites that can deliver homes in the next few years. If your land was looked at in those years and set aside because of water, the reason has now gone.
Unmet Need in a District Without Green Belt
A 44% result and a land supply of 1.7 years put Horsham firmly in the group of councils whose housing shortfall counts in favour of edge-of-settlement schemes under policy S5 of the August 2026 framework. Where Green Belt covers the countryside, that route is closed to most fields; here it is not, so a paddock behind Partridge Green or a field on the edge of Billingshurst can be judged on its merits. The questions are whether the land sits hard against the village rather than out in open country, whether its roads, schools and surgery can take the numbers, and whether the homes would be built in time to help meet that need.
| Settlement | What the plan and its modifications propose |
|---|---|
| Horsham and Broadbridge Heath | Horsham is the main town in the plan's hierarchy, with Broadbridge Heath in the tier below. About 500 more homes are proposed on land north of Horsham. |
| Southwater | A second-tier settlement, with Land North West of Southwater already allocated as a strategic site. |
| Billingshurst | Land East of Billingshurst is an existing strategic allocation, and Adversane, close to Billingshurst station, is the new proposal. |
| Henfield | Two new sites totalling around 641 homes are proposed. |
| Ashington | A northern cluster of around 450 homes is proposed. |
Scale is where many edge-of-village schemes succeed or fail. A few dozen homes on the edge of a larger village is judged very differently from several hundred, and school places are a live issue here, as the choice of Adversane shows. The wording of S5, and how it applies in a district without Green Belt, is unpacked in the 2026 national planning framework guide.
Selling Land Near the Downs, the Weald or a River Valley
Inside the South Downs National Park, applications go to the National Park Authority under its own local plan, and major development faces the strictest test in national policy. Land just outside the park is often judged on how it looks from the Downs above. The High Weald, the district's other nationally important landscape, sets a similarly high bar for major schemes inside it.
The Arun Valley sites are the reason water neutrality existed, and their protection still shapes ecology work on land that drains towards them. A field that runs down to a river's floodplain is not ruled out, but the houses belong on its upper part, with the wet ground kept for drainage and wildlife, as the flood risk guide describes.
If you are thinking of selling land near Pulborough, ecology work for the Arun Valley sites is usually among the first surveys we commission, and we pay for it.
When to Sell Land in Horsham, Between the October Hearings and Adoption
Most of what happens next depends on the October hearings and the inspector's report that follows them. Three other things deserve a place on the watch list.
Supply and Completions
The council's monitoring report for 2024/25 puts its housing land supply at 1.7 years at 1 April 2025. It measures against the government's standard method, 1,338 homes a year, with a 20% buffer because of its delivery record, so it needs 8,028 homes over five years and can count 2,742. The same report shows net completions falling from 769 in 2020/21 to 328 in 2024/25, with only a brief rise in 2023/24, and says water neutrality had a significant impact on the ability of development to come forward from September 2021.
How the Delivery Test Will Move
The test trails those completions. It is published once a year, the latest being the Housing Delivery Test 2025 on 17 August 2026, and each edition averages three years, so the next one will still be made up largely of years when neutrality held building back. While the result stays under 75%, policy S5 treats the district's need as unmet. After adoption, the test's rules measure delivery against the plan's own requirement where that is lower than the government's figure, and because the modified requirement starts low and steps up, later results could look quite different. That is a reason not to leave a well related site until the plan is in place.
Reorganisation is on hold. The same monitoring report expected Horsham District Council to be replaced by a new unitary authority by April 2028. A government announcement on 7 September 2026 paused the West Sussex proposals pending a wider review, and the May 2027 elections will use the existing council areas. Horsham remains the planning authority, and an adopted plan would stay in force whatever structure eventually follows.
For a field outside the proposed allocations, the case can be made now, while supply is short. For land inside them, the October sessions are where boundaries and numbers are settled, and we can have the survey work under way at our cost before then.
Questions About Selling Land in Horsham District
Should I wait for the new plan to be adopted?
Not necessarily. With delivery at 44% and no Green Belt, a well-related site can already be put forward under national policy. The new plan matters too, and we can pursue both at once where that makes sense.
Does the proposed strategic site help land that lies near Adversane?
Land next to a large proposed allocation can gain from new roads, schools and services, but it can also be judged against the new site's boundaries. We look at how your land relates to the proposal on the ground.
I have a planning permission with a water neutrality condition. What now?
The council will consider applications to remove those conditions and replace them with a standard water efficiency condition. That can make a stalled permission workable again.
Does it matter whether my land is in the South Downs National Park?
Yes. Inside the park, decisions are made by the National Park Authority under its own plan, and the bar for new housing is much higher.
Why does Horsham take some of Crawley's housing?
Crawley is tightly bounded and cannot meet its own need. The modified Horsham plan includes half of Crawley's unmet need, 3,757 homes, within its total of 18,712.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Horsham District Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Horsham District stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Horsham District? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in West Sussex
County overview
Selling Land in West Sussex
Sell land for development in West Sussex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 48% of need
Selling Land in Adur
Sell land for development in Adur: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 36% of need
Selling Land in Crawley
Sell land for development in Crawley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 84% of need
Selling Land in Arun
Sell land in Arun, near Bognor Regis. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 124% of need
Selling Land in Chichester
Sell land in Chichester, near Selsey. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 104% of need
Selling Land in Mid Sussex
Sell land for development in Mid Sussex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 142% of need
Selling Land in Worthing
Sell land for development in Worthing: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond West Sussex
- Brighton and HoveEast Sussex · 1.5 years of housing land
- Mole ValleySurrey · 5.3 years of housing land
- WaverleySurrey · 1.28 years of housing land
Sources
- Horsham District Council: Latest news from the Local Plan examination
- Horsham District Council: Schedule of proposed main modifications
- Horsham District Council: Local Plan 2023 to 2040, Regulation 19 version (December 2023)
- Horsham District Council: Water neutrality
- Natural England: Arun Valley water neutrality withdrawal statement, 31 October 2025
- Sussex Express: 3,200 homes at Adversane included in Horsham's Local Plan (July 2026)
- Sussex Express: Examination of Horsham's Local Plan under way for the second time (April 2026)
- Sussex Express: Green Belt between Horsham and Crawley being explored (February 2024)
- Horsham District Council: Authority Monitoring Report 2024/25
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.