Skip to content

We pay for the planning. If it fails, you keep your land.

Call us:07958 351879

Warwickshire council area

Selling Land in North Warwickshire

North Warwickshire delivered 164% of the homes the government's latest delivery test asked for, yet the council's own figures show only 1.5 years of housing land, and the inspector who allowed 110 homes at Warton in February 2026 found the position weaker still. Its plan was adopted on 29 September 2021, so from 29 September 2026 its supply is tested against the standard method instead of the plan's stepped figures, and a replacement plan to 2045 is heading for its final round of comments.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

Atherstone, Coleshill and a Borough Three Fifths Green Belt

North Warwickshire Borough Council governs the rural borough between Tamworth, Nuneaton, Coventry and the eastern edge of Birmingham, from its council house in Atherstone. It covers about 284 square kilometres and roughly 67,000 people. Atherstone and Coleshill are the towns; the larger villages include Polesworth, Dordon, Mancetter, Hartshill, Kingsbury and Water Orton, and there are dozens of smaller places such as Warton, Austrey, Fillongley and Shustoke.

  • Building above the government's line. In the Housing Delivery Test 2025 the borough delivered 831 homes against a requirement of 507, a result of 164%.
  • Short of land all the same. The council's Annual Monitoring Report for 2024/25 puts its five-year supply at 1.5 years, measured at 31 March 2025.
  • Green Belt over most of the land. The council's Green Belt study records 17,240 of the borough's 28,430 hectares as Green Belt, about 60.7%, and the draft plan describes it wrapping around Coleshill.
  • A plan from September 2021. The North Warwickshire Local Plan sets a minimum of 9,598 homes from 2011 to 2033, with a requirement that climbs steeply from April 2025.
  • A road improvement that has not come. The plan allocated sites along the A5 on the basis that its access would be improved, and the Warton appeal decision records that National Highways withdrew the funding in April 2025.

North Warwickshire in Figures

The government's latest figures for the council, its latest five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    164%

    Meeting its housing requirement.

  • Five-year housing land supply

    1.5 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2025, measured against the adopted Local Plan requirement averaged at 479 homes a year, plus a 3,620-home shortfall since 2011 and a 20% buffer. Stated by North Warwickshire Borough Council (Annual Monitoring Report 2024/25); the inspector at the Warton appeal (February 2026) found the supply closest to 0.82 years.

    Checked source
  • Homes built against homes needed

    831

    of 507 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    September 2021

    The plan currently used to decide applications.

  • New plan progress

    Updated

    Draft Local Plan 2025 to 2045 consulted on July to August 2026; final draft expected October 2026, submission December 2026

    Checked source

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

Ahead on Delivery, Short of Land: How Both Are True

The two measures face in opposite directions. The delivery test looks back at homes completed in the three years to March 2025. The five-year supply looks forward, and the 2021 plan asks for far more after 2025 than before it. The inspector who examined the plan built in a stepped requirement: 203 homes a year to 2016, 265 a year to 2024, 390 in 2024/25, then 700, 725 and finally 775 a year from 2027 to 2033. Building has not followed that climb. The monitoring report records 374 completions in 2021/22, 170 in 2022/23, 278 in 2023/24 and 231 in 2024/25.

The council's statement on its five-year supply calculations, presented to its Planning and Development Board on 6 October 2025, does the sums two ways. The appellant's supply witness at the Warton inquiry set out a third:

Sources: the council's supply statement (October 2025) and the appellant's evidence to the Warton inquiry (November 2025). Base date April 2025.
Part of the calculationCouncil, plan averageCouncil, stepped planWarton appellant, stepped plan
Five years at the plan's rate2,395 homes (479 a year)3,750 homes (700, 725, then 775 a year)3,750 homes
Shortfall since 2011, added in full3,620439544
Requirement with a 20% buffer7,2185,0275,154
Deliverable homes counted2,2072,207848
Years of supply1.532.200.82

The monitoring report carries the first column, rounded to 1.5 years, as the council's headline. The 20% buffer is there because the borough scored 81% in the Housing Delivery Test published in December 2024, under the 85% mark at which national policy adds it. And the count of 2,207 deliverable homes was 1,667 lower than a year before, mainly because the council took 1,514 homes on allocated sites out of it.

Warton: 110 Homes Allowed at 0.82 Years

Richborough appealed after the council did not decide its outline application for up to 110 homes on land south of Warton Recreation Ground, off Orton Road. The inquiry opened on 2 December 2025, and on 16 February 2026 the inspector allowed the appeal.

On supply, the inspector accepted the stepped requirement and the 20% buffer but not the council's count. The council had produced no evidence from developers or landowners that its allocated sites would start within five years, and the decision concludes that supply was "closest to the Appellant's calculations of 0.82 years rather than the Council's position". The council also conceded at the inquiry that the plan's reserve sites would not deliver homes within five years either.

Why a Category 4 Village Took 110 Homes

Warton is a Category 4 settlement under policy LP2 of the 2021 plan, where the plan usually looks for schemes of no more than ten homes. The inspector gave that conflict very limited weight, finding that "the very severe shortfall in the Housing Land Supply means that L2 is fundamentally not delivering the necessary houses in the Borough". On the other side of the scales sat 44 affordable homes, in a borough the decision records as needing 133 affordable homes a year while only 17 were built in 2023/24, and 74 applicants on the housing waiting list who had asked to live in Warton.

The National Policy That Applies Now

The same shortfall now feeds policy S5 of the August 2026 framework, which counts a supply of less than five years as a sign that the need for homes is not being met and supports housing beyond a settlement's limits to meet it. The council's own questions and answers on the new plan accept as much, saying that without a five-year supply, applications on sites not allocated in a local plan "are more likely to receive permission". Nothing about that is automatic. The land has to sit properly against a town or village rather than out in open country, and the roads, school places and drainage must be able to take the extra households. Inside the built-up areas, policy S4 sets the presumption the other way, so a scheme there should be refused only if its harm clearly and substantially exceeds its benefits.

Where the Green Belt Changes the Question

The Green Belt study that LUC completed for the council in December 2025 describes a belt of farmland crossed by major roads and railways, with villages, industrial estates and the historic town of Coleshill, set between Birmingham, Coventry, Nuneaton and Tamworth. Policy S5 does not apply inside it. What the shortfall does there is meet the need test for grey belt: land that does not strongly serve the Green Belt's purposes can take homes where the need for them is shown, and a supply of 1.5 years shows it. Bigger schemes there also carry the Golden Rules, which cover affordable homes, the infrastructure a scheme needs and public green space, as explained in our grey belt guide.

The draft plan adds a local grey belt policy, LP3. It says the Green Belt review has defined some parcels broadly as grey belt, to be shown indicatively on the policies map, and supports development there only where all of four tests are met: a sustainable location in the settlement hierarchy, at least 50% affordable housing, no fundamental harm to the purposes of the remaining Green Belt taken together, and the Golden Rules. Half the homes as affordable is a demanding share that shapes what such land can support. The draft says a second, more detailed stage of the study, looking at the effect of removing specific sites, has also been carried out, and the council expects to publish it with the next consultation.

A local policy of strategic gaps sits on top. Policy LP4 of the draft names five: between Tamworth and Polesworth with Dordon, between Dordon and Baddesley with Grendon, between Grendon and Atherstone, the Coleshill corridor, and between Atherstone with Mancetter and Caldecote towards Nuneaton. A further study may add gaps along the A5. Inside a gap, schemes that significantly harm the separate character of the settlements are refused.

How a site is judged depends on where it sits:

  1. Against a settlement outside the Green Belt. Land like the Warton field, sharing a boundary with a village and outside the belt, is tested under policy S5 while the shortfall lasts.
  2. In the Green Belt, but weak against its purposes. Around Coleshill and wherever else the belt runs, the question is whether a parcel counts as grey belt. The housing need is already shown.
  3. Previously developed land. Yards, depots and former works with lawful buildings or hardstanding have their own route in Green Belt policy. Our page on brownfield and yards covers what we look for.
  4. Beside a neighbouring town. The draft plan's Category 2 covers settlements adjoining the outer boundary of the borough, where homes can be supported if the land is outside the Green Belt and the Strategic Gap and clearly integrates with the wider built-up area.

The a5 Sites and a Plan to 2045 With a Lower Figure

The council's Issues and Options report of October 2025 accepted, as the Warton decision records, that the sites along the A5 were allocated on the basis of access improvements whose funding was then withdrawn as costs rose. The draft plan explains that the 2021 requirement included provision for unmet need from Coventry, Tamworth and Birmingham, with a trajectory that assumed the A5 works, and says that this delivery "is now in doubt". It keeps the allocations all the same, on the basis that the improvements can still be developer led while bids for grant support continue. At Warton, the appellant's evidence disputed the council's count on allocations including 250 homes north west of Atherstone, 100 east of Polesworth and Dordon, and 300 west of Robey's Lane, which had outline permission from June 2025 but no reserved matters application.

What the Draft Plan Proposes

Consulted on from 9 July to 19 August 2026, the draft plan runs from 2025 to 2045 and plans for 7,280 homes, 364 a year, the government's standard method figure. It records about 4,952 homes from the 2021 plan still to be built, and notes that no council has yet told it of a housing shortfall this plan must take on, while accepting that may change as neighbouring plans progress. Its settlement hierarchy is the map most landowners will want:

  • Market towns: Atherstone with Mancetter, Polesworth with Dordon, and Coleshill, where the draft expects smaller growth because the Green Belt wraps around the town.
  • Local service centres: Baddesley with Grendon, Hartshill with Ansley Common, New and Old Arley, Kingsbury and Water Orton.
  • Smaller villages: among them Ansley, Austrey, Curdworth, Fillongley, Hurley, Newton Regis, Shustoke, Warton, Whitacre Heath and Wood End.
  • Everywhere else: development not generally acceptable, save in special cases such as rural workers' homes or rural exception sites.

Two changes in the draft matter at the edge of a village. Policy LP2 supports development inside the boundaries of settlements in Categories 1 to 4 in principle, and says development directly next to those boundaries may also be acceptable where it is proportionate to the settlement and complies with the plan and national policy, Green Belt protection included. And policy LP9 asks major schemes for at least 30% affordable housing, rising to 40% on greenfield sites previously in farming use, a figure that comes off what a field can support.

Where the Draft Puts the Homes

Chapter 14 of the draft shows how the 7,280 homes would be found, counting from 1 April 2025:

North Warwickshire Borough Council, Regulation 18 Draft Local Plan (June 2026), table 7 and paragraph 14.7.
Part of the supplyHomes
Requirement 2025 to 2045, with a 5% buffer7,644
Planning permissions at April 2025, less 3% for lapses1,092
Windfall sites, 60 a year from 2028/291,020
2021 plan allocations carried forward3,925
2021 plan sites moved to reserve status706
New allocations, at 35 homes a hectare1,014
Supply if every site came forward7,757
Contingent sites, only if the A5 cannot cope836 more

That leaves a margin of just 113 homes over the requirement with its buffer. The largest sites are carried forward from 2021: 1,675 homes east of Polesworth and Dordon within the plan period, at least 1,280 north west of Atherstone off Whittington Lane, 450 south of Coleshill Road at Ansley Common and 388 on land north of Ansley Common. Among the new allocations are up to 283 homes west of Tamworth Road in Kingsbury, which already had a resolution to grant permission, 239 east of Packington Lane in Coleshill, a Green Belt release the study did not class as grey belt, 95 on the edge of Tamworth off Overwoods Road, and the Warton appeal site, allocated for its 110 homes. At Hurley, a small field south of Knowle Hill is released because the study found it to be grey belt.

Two back-up lists follow. Reserve sites, including phase 3 at Dairy House Farm beside the A5, are released only if forecast supply falls below 5.5 years and their access, infrastructure or flooding issues are solved. Seventeen contingent sites for 836 homes, from the edges of Atherstone and Coleshill to villages such as Austrey and Wood End, come forward only if the strategic transport assessment shows a shortfall caused by the A5's capacity, with no prospect of improvements within ten years.

Parish plans matter too. The monitoring report lists neighbourhood plans made for Arley, Austrey, Coleshill, Fillongley, Hartshill, Mancetter, Water Orton, Dordon and Nether Whitacre, and Polesworth's went to referendum in March 2025. The Warwickshire page sets the borough beside its neighbours.

The Land We Look for in North Warwickshire

  • Fields outside the Green Belt that share a boundary with the houses of a town or village, as the Warton site did.
  • Green Belt land, around Coleshill or elsewhere, that is hemmed in by roads, the railway or existing buildings.
  • Former yards, depots, works and other land with lawful buildings or hardstanding.
  • Land beside towns over the borough boundary, outside the Green Belt and the Strategic Gap.
  • Larger holdings that could be allocated as the plan to 2045 reaches its final stages.

What wins permission here is evidence: proof that homes can be built within five years, a safe access onto roads that are already busy, drainage, and highway capacity near the A5. We commission and fund every part of it, under an option agreement at a price settled at the start, pitched above the land's present value. Farming or other use of the land continues as normal until completion, and should permission never come, the land is still yours and there is nothing to pay. Our how it works page takes you through the stages in order.

A Plan at Five and Its Successor at the Final Stage

From 29 September 2026, a Different Yardstick

A plan's own housing figure is the test for supply only while the plan is less than five years old, which is why both sides at Warton used the 2021 requirement. After that, local housing need under the government's standard method takes over. The plan was adopted on 29 September 2021, so from 29 September 2026 the stepped figures of 700, 725 and 775 a year stop being the measure. The draft plan puts local housing need at 364 a year. The 20% buffer came from the 2023 delivery test; a result of 164% in the Housing Delivery Test 2025 is far clear of the 85% mark, so the next calculation should carry the ordinary 5% instead.

A lower yardstick does not settle the answer by itself: at Warton the inspector found much of the council's count unsupported, and any new statement will be tested the same way. We make no forecast. The practical point is that well placed land is worth looking at while the present shortfall holds, and other land belongs in the review.

The Plan Review Timetable

From the council's questions and answers on the new plan (2026). Dates are the council's and can move.
StageCouncil's expected date
Second draft plan consultation (Regulation 18)Held, 9 July to 19 August 2026
Final draft published for comment (Regulation 19)October 2026
Submission for examinationDecember 2026
ExaminationFrom January 2027
AdoptionBy the end of 2027

The council's Local Development Scheme had the final draft going to a council sub-committee in September 2026 and submission in November 2026. The Warton inspector called a December 2026 submission "very ambitious", as there was then no sustainability appraisal, no strategic transport assessment and no published outcome from the call for sites. The council has since published a July 2026 sustainability appraisal and its 2026 land availability assessment, and says the transport assessment and the second stage of the Green Belt study will come with the final draft consultation, which it expects in October 2026. What a site needs at each of these stages is covered in call for sites and local plans.

The Next Delivery Test

At 164%, the borough faces none of the yearly test's consequences. A future result below 85% would bring the 20% buffer back, and one below 75% would make unmet need a given under policy S5 whatever the supply figure.

Reorganisation, on Hold

In July 2026 the government confirmed plans for a new North Warwickshire Council, covering this borough with Nuneaton and Bedworth and Rugby, from 1 April 2028, as the borough council's reorganisation page sets out. That has since been paused while the government reviews whether the process would stand up in law, and Warwickshire County Council has confirmed that voters will elect members of the existing councils in May 2027. The borough council remains the body writing the plan.

What This Means for Timing

  • Land against a settlement outside the Green Belt is worth reviewing now, while the shortfall and the Warton decision carry their full weight.
  • Green Belt land turns on whether it is grey belt; we can assess a parcel before the council's second-stage study appears.
  • Larger or less well placed land is best aimed at the final draft plan and its examination in 2027.

Questions About Land in North Warwickshire

Why is a borough that builds above its target short of land?

Because the council's current figure was worked out against the 2021 plan's requirement, which steps up sharply from 2025 to 775 homes a year, while recent years have seen between 170 and 374 completions. The council also carried a 20% buffer from its 2023 delivery result and took 1,514 homes on allocated sites out of its count.

Does the Warton decision mean a field next to my village will get permission?

Not by itself. Warton adjoined the village and offered 44 affordable homes where local need was plain, and the inspector still weighed its harms before allowing it. Each site is judged on its own merits, and a field set apart from the village would face a much harder case. We look at yours on that basis before recommending anything.

My land is in the Green Belt near Coleshill. Is there any route?

Possibly, through grey belt. The shortfall shows the housing need, so the question is whether your parcel strongly serves the Green Belt's purposes. The draft plan says land around Coleshill generally performs well against them, and the Coleshill corridor is a proposed strategic gap, so the evidence has to be good. Larger schemes would also carry the Golden Rules, and the draft asks for at least 50% affordable homes on grey belt land.

My field is allocated along the A5 in the 2021 plan. Is it still allocated?

Most are. The draft plan to 2045 carries the main allocations forward and moves a few, such as phase 3 at Dairy House Farm, to reserve status, while accepting that delivery is in doubt without the road works. Showing that access and highway capacity can be solved is what moves such a site on, and that is work we fund.

The new plan asks for 364 homes a year. Does that mean fewer sites will be needed?

It still needs 7,280 homes to 2045, and the draft counts on 3,925 of them coming from allocations carried forward from the 2021 plan, some along the A5 where delivery is in doubt. Its identified supply exceeds the requirement with its buffer by only 113 homes, which is why it also names contingent sites, so new, deliverable land remains in demand.

Tell Us About Your Land in North Warwickshire

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly. We reply within 2 working days, in confidence.

About your land

Own land in more than one area? Choose one here and tell us about the others below.

About 4.0 hectares. Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Warwickshire

  • County overview

    Selling Land in Warwickshire

    Selling land across Warwickshire? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.

  • Housing Delivery Test: 221%

    Selling Land in Nuneaton and Bedworth

    Selling land in Nuneaton and Bedworth? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.

  • Housing Delivery Test: 187%

    Selling Land in Rugby

    Selling land in Rugby? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.

  • Housing Delivery Test: 202%

    Selling Land in Stratford-on-Avon

    Selling land in Stratford-on-Avon? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.

  • Housing Delivery Test: 128%

    Selling Land in Warwick District

    Selling land in Warwick? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.