Skip to content

We pay for the planning.

Call us:020 3953 5635

Staffordshire council area

Selling Land in Tamworth

Checked on

Tamworth is a borough of twelve square miles whose boundary hugs the town, so it has relied on Lichfield and North Warwickshire to take part of its housing need since its plan was adopted in February 2016. It builds far above its target yet cannot show five years of land, and its new plan to 2043 looks to its neighbours and the wider region for more than half of what it needs.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Tamworth and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Tamworth can show 1.6 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from February 2016, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Tamworth

  • Fields and paddocks in the Green Belt on the southern edge towards Wilnecote, inside the parcels the 2026 assessment found to be potential grey belt.
  • Greenfield land on the town's edges outside the Green Belt, towards Coton Lane, Ashby Road and Dunstall Lane, where S5 reaches.
  • Yards, depots, garages and former commercial sites inside the town, the kind of land the draft plan allocates at Aldergate and Croft Street.
  • Land on the Lichfield and North Warwickshire sides of the boundary that adjoins Tamworth's built edge, where the borough's unmet need is the argument.

Where we take a site on, we pay for the access, drainage, ecology, landscape and grey belt evidence and run the application or plan submission at our own cost. The option price is agreed at the start, above the land's value in its current use; you keep using the land, and should permission never be secured, you keep the land and owe us nothing. Each stage is on our how it works page, and our brownfield and yards page covers the urban sites the draft plan favours.

Is Your Land in Tamworth a Good Fit?

You do not need to know the planning rules to sell land for development in Tamworth. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Tamworth

There are three common ways to sell land with development potential in Tamworth. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Tamworth: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Tamworth and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Tamworth

Three things shape the chances of selling land for development in Tamworth: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    220%

    Meeting its housing requirement.

  • Five-year housing land supply

    1.6 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 445 homes a year, plus a 5% buffer. Stated by Tamworth Borough Council.

    Checked source
  • Homes built against homes needed

    861

    of 391 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    February 2016

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    Pre-submission (Regulation 19) consultation on the Local Plan 2022 to 2043 ran from 24 August to 5 October 2026; the Cabinet report of 20 August 2026 puts the request to submit before full Council in December 2026, ahead of the 31 December 2026 deadline, and the Local Development Scheme 2026 to 2029 puts adoption by April 2028 at the latest

    Checked source

See how Tamworth compares with the other 221 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Twelve Square Miles, One Town and Two Neighbours

Tamworth Borough Council covers the town of Tamworth and nothing else, from Amington and Glascote in the east to Wilnecote and Dosthill in the south. It sits within the Greater Birmingham and Black Country housing market area, so its housing arithmetic is never only its own.

  • One of the smallest districts in England. The adopted plan calls the borough "only 12 square miles in size", with a boundary the draft plan says is "drawn tightly around the urban area".
  • Green Belt on the edges only. The adopted plan records that 7% of the borough lies within the Green Belt, to the south; the 2026 assessment below also finds a parcel on the eastern edge. Beyond the boundary is Lichfield district to the north and west and North Warwickshire to the east and south.
  • Delivery well above target. The Housing Delivery Test 2025 measured 861 homes built against 391 required, a result of 220%.
  • Land supply the other way. The council's latest statement finds 1.6 years, measured against the government's figure rather than its own.

So for anyone selling land in Tamworth, the boundary is the first fact to check: a field just outside it is judged by Lichfield or North Warwickshire, under their plans rather than Tamworth's.

Selling Land in Tamworth: Supply Measured Against 445 Homes a Year, Not 177

The plan adopted in February 2016 set a requirement of 177 homes a year. The council's five-year housing land supply statement for 2025 to 2030 no longer uses it: "As the adopted plan is now more than five years old, the housing requirement used for this calculation is the standard method set out in national planning guidance." That method gives 445 a year, two and a half times the old target:

Rows as printed in Tamworth Borough Council's five-year housing land supply statement 2025 to 2030.
Part of the calculationCouncil's figure
Yearly requirement445 homes, the standard method
Five-year requirement2,225 homes
Shortfall from earlier yearsNone: a surplus so far
Buffer5%, or 111 homes
Requirement with buffer2,336 homes, or 467 a year
Homes with permission, started166
Homes with permission, not started445
Historic lapse rate13%
Plan allocations without permission yet37
Windfall allowance70, counted for two years only
Deliverable supply730 homes
Net supply against the requirementminus 1,606 homes
Result1.6 years

The statement's method is cautious. It measured lapsed permissions from 2006 to 2022 at about 6% over the period as a whole or about 13% as an average of yearly rates, and chose 13% "to avoid underestimating the number", for sites not yet started only. Small windfall sites, averaging 40 homes a year, are cut by the same 13% to 35 and count only in years four and five, by when current permissions will have started or lapsed. Against the old plan's 177 a year, 4,310 homes were built from 2006 to March 2025 where 3,186 were required, so no past shortfall is added, and the 2022 delivery test result it cites, 623%, and the Housing Delivery Test 2025 result of 220% both keep the buffer at 5%.

The parts reconcile only so far. Taking 13% off the 445 homes not yet started gives 166 + 387 + 37 + 70 = 660; with no lapse rate the parts make 718. The printed 730 is exactly 70 more than 660, what the parts give with windfall counted for four years rather than two; that is the likeliest reason, though no working is shown. The stated method divides by a fifth of the buffered requirement, 467 a year, giving 1.56 years; the printed line divides by 445, giving 1.64. Both round to the council's 1.6 years; on the parts as described the result would be about 1.4 years. For a landowner nothing turns on it: every reading is under a third of the five years required.

What the Shortfall Does for a Field

Outside the Green Belt, policy S5 of the August 2026 framework backs homes on land that relates well to a settlement, is served by infrastructure and where unmet need is evidenced. A supply under five years counts as such evidence, to be weighed rather than treated as an automatic finding, and the council already treats its housing policies as out of date: under the framework then in force, when the planning committee resolved to approve up to 200 homes at Ashlands Farm on Ashby Road on 14 April 2026, a 9.66 hectare greenfield site the adopted plan did not allocate, the officer report recorded that the council "currently has an insufficient housing land supply" and that "the presumption in favour of sustainable development is applied".

The 1,825 Homes Placed Next Door Since 2016

The Tamworth Local Plan 2006 to 2031 found an objectively assessed need of 6,250 homes but set the borough's own target at a minimum of 4,425, with the remaining 1,825 to be built in neighbouring areas. Policy SS1 records how that was arranged under the duty to cooperate:

  1. 500 homes each in Lichfield and North Warwickshire. Lichfield District Council "committed to deliver at least 500 dwellings in their Local Plan" and North Warwickshire Borough Council the same "in their Core Strategy", both for Tamworth's needs.
  2. 825 still to place. The three councils agreed "to continue this co-operation on strategic planning issues to deliver the remaining unmet need of 825 dwellings and a minimum of 14 hectares of employment land".

The council's review of the plan in March 2020 records that under the statement of common ground "Lichfield agreed to take 912 dwellings and 6.5Ha of employment land whilst North Warwickshire agreed to take 913 dwellings and 14Ha of employment land", which between them cover the full 1,825. It concluded that "the level of changes required are significant enough to warrant the production of a new plan rather than a partial update". Where Lichfield stands is on our Staffordshire page; North Warwickshire is below.

A Plan to 2043 That Needs 8,608 Homes and Can Place 3,945

The pre-submission local plan takes 177 a year to December 2024 under the old plan and 445 a year from January 2025, which "gives a total housing need for the plan period of 8,608 new homes". Policy SP1 sets out how much of that the borough can take:

From Strategic Policy SP1 and paragraphs 7.10 to 7.16 of the Tamworth Pre-Submission Local Plan 2022 to 2043 (August 2026).
Where the homes come fromDraft plan figure
Built since April 20221,030
Allocated sites (policy SP4)a minimum of 1,920
Town centre regeneration sites (policies TC3 and TC4)at least 400
Windfall, at about 35 a year from April 2026around 595
Total the plan provides in the borougha minimum of 3,945
Unmet need, for neighbouring councils and the wider housing market area4,663

So the new plan meets under half of the need inside the boundary, against about seven tenths under the 2016 plan. The Cabinet report puts it plainly: "Even with the release of land from the Green Belt, the plan is not able to provide enough sites to meet the housing target and will therefore require assistance from our neighbouring councils and others in the wider region to help achieve the target."

Eighteen Allocations and a Green Belt Release

Policy SP4 lists eighteen housing allocations. Some are urban sites such as the bus depot at Aldergate; the greenfield ones on the edges include Ashlands Farm and land south of Ashby Road, land east of Dunstall Park Primary School, land between Dunstall Lane and the Coventry Canal, two sites on Coton Lane and, in the Green Belt, land at Gorsy Bank Road and off Wigford Road. Policy SP1 says 42.1 hectares "will be removed from the Green Belt to help deliver 856 of those new homes", while paragraph 8.2 of the same document gives 41.4 hectares. The likeliest reason is a boundary adjusted in one place and not the other; examination would settle it, and for land outside the named sites it changes nothing.

What the Neighbours Now Say

Both neighbours are short of land themselves: Lichfield reports 3.5 years and North Warwickshire 1.5 years. North Warwickshire's Regulation 18 draft plan of 2026 acknowledges the growth its previous plan took for Tamworth and then says that "No local authority has indicated a shortfall in housing that must be considered through this Local Plan". That draft is dated June 2026, two months before Tamworth published its figure of 4,663, which is the likely reason the two do not meet. Unless a later version of either plan changes, the 4,663 homes have nowhere to go yet.

For an owner selling land on the Lichfield or North Warwickshire side of the boundary, beside Tamworth's built edge, those 4,663 homes are the figure to watch, as either neighbour's next plan may be asked to take a share.

Selling Green Belt Land: Three Parcels, All Potential Grey Belt

The Staffordshire Green Belt Assessment of April 2026 has a Tamworth appendix whose key finding is this: "All three parcels were identified as potential grey belt, noting the presence of differing levels of footnote 7 constraints."

  • TAM01, the southern edge. Farmland and farm buildings. Moderate against sprawl, weak against merging towns, strong for safeguarding the countryside.
  • TAM02, also the southern edge. Includes the clay pit at the Wilnecote stoneware and pottery works. Moderate, weak and moderate on those purposes.
  • TAM03, the eastern edge. Mostly the Middleton Lakes nature reserve. Moderate, weak and strong, and the parcel where the footnote 7 constraints weigh most: about 80% of it lies in flood zones 2 and 3 or is affected by surface water flooding.

A parcel counted where it did not perform strongly against sprawl, merging or historic towns; the countryside purpose alone does not disqualify it. That matters because policy S5 does not apply in the Green Belt. The grey belt test applies instead: homes can be approved on Green Belt land that does not strongly serve those three purposes where the need for them is shown, usually by either a supply under five years or a delivery result under 75%, with the Golden Rules on affordable homes, infrastructure and green space for larger schemes. With 1.6 years, the need limb is met today. A field inside a parcel is judged on its own contribution, not the parcel average, and land the plan does not release goes by application. Our grey belt guide explains how a site is judged against each purpose.

When to Sell Land in Tamworth, Between a December Vote and an Unsettled Reorganisation

The council's Local Development Scheme for 2026 to 2029 records government grant "for the purposes of getting the new local plan to the point of submission for examination by December 2026". The stages:

The council's and the government's dates; they may move.
StageDate and source
Review of the 2016 plan, concluding a new plan was neededMarch 2020 (Local Plan Review)
Cabinet approval of the pre-submission plan20 August 2026 (decision record)
Pre-submission (Regulation 19) consultation24 August to 5 October 2026 (council announcement of 25 August 2026)
Full Council asked to approve submissionDecember 2026 (Cabinet report)
Government deadline for submission under the current system31 December 2026 (Cabinet report)
Adoption"By April 2028 at the latest" (Local Development Scheme 2026 to 2029)

The pre-submission consultation ran from 24 August 2026 to 11.59pm on 5 October 2026, the closing date the council's announcement of 25 August 2026 had set, and the same announcement puts the final version before full Council for decision in December 2026. It was the last round of comment before an inspector tests legal compliance, including the duty to cooperate, and soundness, and 4,663 homes that no neighbour has yet agreed to take bear on both. Our guide to calls for sites and local plans explains what a Regulation 19 representation is for.

Delivery Far Above the Line, Supply Below It

The Housing Delivery Test 2025 was published on 17 August 2026. At 220%, none of its consequences touches Tamworth: an action plan applies below 95%, a 20% buffer below 85%, and unmet need is treated as evidenced under S5 below 75%. The next supply statement would again measure land against the standard method.

Staffordshire's Reorganisation Decision Withdrawn

Ministers held Staffordshire's reorganisation over for review in September 2026, and the July 2026 choice of two unitary councils was withdrawn by letter on 29 October 2026. That letter leaves all proposals open and expects each area to hear its outcome by early 2027. Until a new structure is settled, Tamworth Borough Council decides applications and takes the plan to submission.

Timing for a Landowner

  • Edge-of-town land outside the Green Belt can be looked at now: the shortfall is on record and the council applied the presumption at Ashlands Farm in April 2026.
  • Green Belt fields on the southern and eastern edges have the 2026 assessment behind them; a grey belt application does not wait for the plan.

Questions About Selling Land in Tamworth

My field is in Lichfield district but it backs onto Tamworth. Does Tamworth's shortage help me?

Not directly: supply is measured council by council, and Lichfield's own position is what counts there. What helps is the 4,663 homes Tamworth's draft plan looks to its neighbours and the wider region to help with: land adjoining Tamworth's edge is the natural place for that need, and we can put it forward in Lichfield's new plan.

Is there really any land left inside a twelve square mile borough?

Less than in most councils. Plots, yards, garages and backland inside the town, and the few greenfield edges at Coton Lane, Ashby Road and Dunstall Lane, are where we look first.

My land is in the Green Belt south of Wilnecote. Is it grey belt?

All three of Tamworth's Green Belt parcels were found to be potential grey belt, the eastern one at Middleton Lakes the most constrained, mainly by flooding. With supply short of five years the need part of the test is met, so the case turns on the land itself and, for larger schemes, the Golden Rules.

Ashlands Farm was approved before the plan was finished. Could I apply now rather than wait for 2028?

It shows the council applying the presumption, under the framework then in force, to an unallocated site on the town's edge. Outside the Green Belt an application under policy S5 can run alongside the plan; whether it suits your land depends on access, drainage and landscape, which our review checks first.

The plan leaves 4,663 homes for the neighbours. What if they refuse?

Then the inspector at Tamworth's examination has to weigh it. The need does not disappear either way: it stays as evidence for applications in Tamworth and as a reason for the neighbours' plans to find sites on its edge.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Tamworth Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Tamworth stands on housing shapes which matter most here.

Selling Land in Tamworth? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Staffordshire

  • County overview

    Selling Land in Staffordshire

    Sell land for development in Staffordshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 232% of need

    Selling Land in Lichfield

    Sell land for development in Lichfield: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 66% of need

    Selling Land in Stoke-on-Trent

    Sell land for development in Stoke-on-Trent: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 160% of need

    Selling Land in Staffordshire Moorlands

    Selling land in Staffordshire Moorlands? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 171% of need

    Selling Land in South Staffordshire

    Sell land in South Staffordshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 149% of need

    Selling Land in Stafford Borough

    Sell land in Stafford Borough. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 115% of need

    Selling Land in Cannock Chase

    Sell land for development in Cannock Chase: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Newcastle-Under-Lyme

    Sell land in Newcastle-under-Lyme. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 181% of need

    Selling Land in East Staffordshire

    Sell land in East Staffordshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Staffordshire