Skip to content

We pay for the planning.

Call us:020 3953 5635

Staffordshire council area

Selling Land in East Staffordshire

Checked on

East Staffordshire joins the brewing town of Burton upon Trent to the market town of Uttoxeter, with the Needwood villages between them and the National Forest across the south east. On a plan from October 2015, the council's note for September 2025 counts 5.06 years of housing land, a margin of a few dozen homes, and in 2026 it started work on a new plan to 2043.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in East Staffordshire and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

East Staffordshire can show 5.06 years of housing land, more than the five years national policy expects, and built 181% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from October 2015, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in East Staffordshire

  • Fields of 2 acres or more on the edge of Burton upon Trent or Uttoxeter, outside Flood Zones 2 and 3.
  • Land next to Tutbury, Barton under Needwood, Rolleston on Dove or Rocester.
  • Edge-of-village land at Abbots Bromley, Yoxall, Marchington, Mayfield, Denstone or Draycott in the Clay.
  • Yards, works and vacant commercial buildings in Burton and Uttoxeter.
  • Holdings of 20 acres or more, with room for the National Forest planting.

Here, talking to us early is about preparation. We commission the access, drainage, flood, ecology and landscape work the new plan will ask for, at our cost, under an option at a price fixed at the outset and set above the land's current-use value. You keep using it, and if permission is never secured you keep the land and owe nothing. How it works sets out each step.

Is Your Land in East Staffordshire a Good Fit?

You do not need to know the planning rules to sell land for development in East Staffordshire. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in East Staffordshire

There are three common ways to sell land with development potential in East Staffordshire. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in East Staffordshire: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in East Staffordshire and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in East Staffordshire

Three things shape the chances of selling land for development in East Staffordshire: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    181%

    Meeting its housing requirement.

  • Five-year housing land supply

    5.06 years

    Five years or more of deliverable housing land. Position at 1 October 2025, measured against the standard method, 607 homes a year, plus a 5% buffer (637 a year). Stated by East Staffordshire Borough Council, for the five years from 1 October 2025.

    Checked source
  • Homes built against homes needed

    2,334

    of 1,289 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    October 2015

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    Local Plan 2012 to 2031 adopted in October 2015; preparation of a new Local Plan 2025 to 2043 started in 2026 and its scoping consultation ran from 29 July to 27 August 2026; the council's engagement strategy puts consultation on proposed plan content and evidence in May to July 2027 and on the proposed plan in April to June 2028

    Checked source

See how East Staffordshire compares with the other 221 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

A Brewing Town on the Trent and a Market Town on the A50

The Local Plan calls Burton upon Trent "firmly identified as a brewing town", home to Molson Coors and Marston's. Uttoxeter is a smaller market town on the A50 serving a rural population that extends into Stafford, Staffordshire Moorlands and Derbyshire Dales, and JCB has its world headquarters seven miles north at Rocester. The plan places every settlement in a hierarchy that decides where homes may go:

  • Main towns. Burton upon Trent and Uttoxeter, where most growth is directed.
  • Strategic villages. Tutbury, Barton under Needwood, Rolleston on Dove and Rocester.
  • Local service villages. Abbots Bromley, Yoxall, Marchington, Mayfield, Denstone and Draycott in the Clay.
  • Everywhere else. Places such as Bramshall, Hanbury, Newborough and Tatenhill have no settlement boundary and count as open countryside.

The Housing Delivery Test 2025 counted 2,334 homes built against 1,289 required, a result of 181%.

Selling Land in East Staffordshire: Five Years of Supply, by 37 Homes

The council's supply note for 30 September 2025, published in January 2026, covers the five years from 1 October 2025 and finds 5.06 years. As the plan is over five years old, it measures against the government's standard method, with the 5% buffer for a council that has not under-delivered:

Source: East Staffordshire Borough Council, Note on 5 Year Land Supply Methodology, 30 September 2025.
Part of the calculationCouncil's figure
Local housing need607 homes a year (housing stock of 55,249, affordability ratio 6.97), 637 with the buffer
Small sites with permission448 homes, after a 10% lapse rate
Large sites with permission2,063 homes
Large sites awaiting a legal agreement or a decision280 homes, at Upper Outwoods Farm and Churnet Farm, Rocester
Care homes and other specialist accommodation251 homes equivalent
Windfall allowance, years four and five180 homes
Total supply, and result3,222 homes, 5.06 years

Five years at 637 comes to 3,185 homes, so the supply clears the line by 37. Since March 2025 the notes have also counted care homes and extra care, "not previously counted"; they add 251 here. Meanwhile four brownfield sites in Burton, 1,244 homes between them, contribute nothing to the five years.

What a Small Change in the Count Would Mean

The council's own housing needs assessment of February 2026 works the standard method from a later stock figure, 56,034 homes, and reaches 616 a year, not 607. The note keeps the 55,249 figure first used in March 2025 without saying why; the assessment uses the stock count published in May 2025, the likely reason for the gap. Set the same 3,222 homes against 616 plus 5% and the result is about 4.98 years, on our arithmetic, not the council's. On the same arithmetic, leaving out the specialist accommodation would give about 4.66 years. None of this is a forecast of the next note; it shows how thin the line is.

For an owner selling land in East Staffordshire, that thin line is the reason to have a field surveyed now: if a later note shows less than five years, an application can follow without delay.

From Nearly Nine Years to Just Over Five

The council's notes show the margin narrowing:

Source: the council's supply notes. The 2021 and 2023 figures include a 5% buffer, 2024 none, 2025 607 plus 5%.
Position atMeasured against, a yearSupplyResult
30 September 20214514,0148.90 years
30 September 20234473,3067.39 years
30 September 20244193,0867.37 years
31 March 20256373,2715.13 years
30 September 20256373,2225.06 years

Most of the fall came with the December 2024 framework: its standard method lifted local housing need from 419 a year to 607, and the 5% buffer, not applied in September 2024, came back on top, taking the figure measured against to 637. Building has slowed as well: completions peaked at 935 in 2022/23, then fell to 781 and to 576 in 2024/25, below 607 a year. The delivery test still finds 181% because it measures April 2022 to March 2025 against a lower requirement of 1,289 homes.

The 2015 Plan: Urban Extensions Building Out, Brewery Land Waiting

The plan provides for 11,648 homes from 2012 to 2031, stepped at 466 a year for six years and 682 a year after that. Each strategic village takes an allocation of 90 to 224 homes plus an allowance of 25 or 26, and the six local service villages 20 or 40 each. The September 2025 note shows where the larger allocations stand:

Source: Local Plan Strategic Policy 4 and the council's supply note for 30 September 2025.
Allocation (homes in the plan)Position at September 2025In the five years
Branston Locks, Burton (2,580)Phases 1 and 2 finished, 3 to 5 under construction440
Beamhill and Outwoods, Burton (950)All 950 approved, phases under way; 190 more beyond the allocation had a resolution to approve in January 2026400, plus 190
Uttoxeter West (750)143 homes left in phase 2; phase 3, 162 homes, has outline permission305
Hazelwalls, Uttoxeter (400)Permission for 429, 58 left to build58
Molson Coors High Street and Middle Yard, BurtonNo live applicationNone
Derby Road, Burton (250)Site still occupied; talks with landownersNone
Branston Depot, Burton (483)Application withdrawn in January 2024; sold for continuing commercial useNone

A Plan the Council Keeps Finding Up to Date

In October 2020 a report to full council recommended putting off an update for up to five years, with a yearly review, and set its own test: "Were an Authority's land supply identified as being below 5 years it is reasonable to conclude that an update is necessary." The reviews of October 2023 and October 2024 each found the plan "in date and is fully effective for decision making", though at 10 years old its housing figure gives way to the standard method for supply. The 20% buffer applied to some decisions since 1 July 2026 reaches only a housing requirement adopted in the last five years, examined under a framework older than December 2024 and 80% or less of the standard method figure, so it cannot apply to a plan from 2015.

A Strip of Green Belt, Two River Valleys and a Forest in the Making

Most of the borough has no Green Belt. The plan records "a small portion of the Burton upon Trent/Swadlincote Green Belt", there to stop the two towns merging, and notes that the same land lies in the coal consultation area, "considered to be a constraint on development". It adds local Strategic Green Gaps where building is allowed only if it keeps the landscape open.

Flood risk follows the Trent and Dove valleys. The plan admits that much of Burton's built-up area is at risk, which "severely curtails the options" for growth there and at Uttoxeter. The Environment Agency says the whole investment in Burton's defences, over £30 million, reduces the risk of flooding to over 4,600 homes and 1,000 businesses, but the plan still asks for a flood risk assessment in Flood Zones 2 and 3, and homes there face the sequential test, as our flood risk guide explains.

The National Forest covers Burton and the rural south east, and Strategic Policy 26 asks schemes to add to it. Housing sites over half a hectare give 20% of the development area to woodland, and sites over 10 hectares 30%, with a payment for planting elsewhere only in exceptional circumstances. The National Forest Company adds that this comes "in addition to the statutory requirement to demonstrate Biodiversity Net Gain".

Selling land for development in Burton or the south east of the borough therefore means planning for the woodland share from the start, since on a holding over 10 hectares 30% of the development area goes to planting.

Routes to Selling Land When the Council Shows Five Years

With five years of land and a delivery result of 181%, neither usual sign of unmet need is present. The new plan is the main route for most open fields, but not the only one:

  1. Inside a settlement boundary. Plots in Burton, Uttoxeter and the ten villages in the top two tiers fall under policy S4, which approves homes unless the harm would substantially outweigh the benefits.
  2. Brownfield in the towns. Burton's supply includes conversions such as the Cross Street Business Centre and former Benefits Agency offices. See our brownfield and yards page.
  3. Exception sites. Strategic Policy 18 allows a small affordable scheme within or on the edge of a settlement, with a minority of market homes. In February 2026 an inspector allowed up to 40 affordable homes beside Tutbury Road, just outside Burton's boundary, as a First Homes exception site, 28 of them First Homes.
  4. Neighbourhood plans. Strategic Policy 8 allows homes outside boundaries where a made neighbourhood plan provides for them.
  5. Policy S5, if the numbers move. Outside the Green Belt, land well related to a settlement and served by infrastructure can be approved where unmet need is evidenced. Delivery below 75% treats that need as evidenced; supply under five years is evidence to weigh, not an automatic finding. Neither applies today.
  6. Grey belt. Possible only in the strip towards Swadlincote, and its need test, usually a supply short of five years or delivery below 75%, is not met at present.

Selling Land Into the New Plan to 2043

In June 2026 a cabinet paper proposed a new plan to 2043, warning, as Place Midlands reported, that keeping five years of land "will be increasingly difficult as the plan ages further". The council's engagement strategy put a scoping consultation, asking what the plan should contain, in July to August 2026, and sets the later stages, with adoption "all within 34 months":

From the council's Engagement Strategy (2026), which says it will keep these dates under review, and Place Midlands.
StageCouncil's timetable
Scoping consultationJuly to August 2026
Proposed plan content and evidenceMay to July 2027
The proposed planApril to June 2028
SubmissionBy the end of 2028, as reported in June 2026

The February 2026 needs assessment puts need at 616 homes a year, 11,088 over 2025 to 2043, with 153 a year affordable, and suggests 30% affordable housing on sites is plausible, subject to viability.

The council's most recent land availability assessment, its 2021 update, looked at 104 sites of about a third of a hectare or more, 712.64 hectares with room for 21,381 homes at its standard 30 homes a hectare. Seventeen, with 1,037 homes, were judged suitable and so developable; three of those were also available and achievable, with 413 homes in its first five years.

The other 87 were judged not developable and put at 15 years or more, the timescale it gives land outside settlement boundaries, as they "would be subject to a Local Plan and/or Neighbourhood plan review". Being listed "should not be taken to imply" that applications will be viewed favourably. The same density gives the two Molson Coors yards and the main Derby Road site 491 homes, where the September 2025 note counts 760. The likely reason is that the plan's allocations expect more homes on these town sites; for an owner, neither figure fixes what a site takes, its design and permission do.

Comments outside the three consultation windows "will not be accepted", the strategy says, yet it wants to hear from anyone with "land which you would like to build on" "at any stage in the preparation of the plan, but the earlier the better". Fifteen sites were put forward between the 2017 and 2021 reviews, and sites whose owners had not replied were dropped. The council's call for sites form takes sites "at any time", asks especially for brownfield land, and warns that information sent after 31 March, when its monitoring year ends, "may not be included until the following year". Each step is walked through in our guide to calls for sites and local plans.

East Staffordshire Between Two Supply Notes: When to Sell Land

A later note will replace the figure on this page. Which side of five years it lands on turns on the standard method figure used (607 in the September 2025 note, 616 in the needs assessment, or a later update), on whether Burton's stalled brownfield homes stay out of the count, and on whether new permissions replace what the urban extensions build.

A Delivery Result Clear of Every Threshold

The Housing Delivery Test 2025 was published on 17 August 2026 and is refreshed each year. At 181%, nothing follows. The lines that matter sit lower: an action plan under 95%, a 20% buffer added under 85%, and need treated as evidenced under 75%.

A Southern Staffordshire Council, Decision Withdrawn

The government had chosen two unitary councils for Staffordshire and Stoke-on-Trent from April 2028, with East Staffordshire in the southern one. Ministers put that choice into a review on 7 September 2026 and, in a letter of 29 October 2026, took the July 2026 decision back, leaving every Staffordshire proposal open and pledging an answer for each area by early 2027. Elections due in May 2027 will be for the existing councils, which leaves applications in Burton and Uttoxeter with East Staffordshire Borough Council as planning authority. Our Staffordshire page compares its neighbours.

  • Ahead of the 2027 consultation. Open land is best surveyed and put forward before the council's May to July 2027 stage.
  • If a note falls under five years. Surveyed land could then go by application.

Questions About Selling Land in East Staffordshire

My field is on the edge of Uttoxeter. What changes if the council's supply slips under five years?

Policy S5 would then count the shortfall as evidence of unmet need, to be weighed, but it would not grant permission by itself. A well related field could then make its case by application as well as through the new plan.

Part of my land near Burton is in the Trent floodplain. Is it ruled out?

Not the whole holding. Homes go on the parts in Flood Zone 1, and any in Zones 2 or 3 face the sequential test. We map the zones first.

Will the National Forest planting take a fifth of my site?

On a housing site over half a hectare, 20% of the development area is expected to be woodland, 30% over 10 hectares. Open space associated with woodland can count towards it. We allow for it in our costs.

I own a paddock by a hamlet with no settlement boundary, such as Hanbury. Can anything be built?

Open market homes are unlikely under the current plan. An affordable exception scheme, a neighbourhood plan allocation or reusing rural buildings can work, and the new plan is where a village's growth is argued.

My land is in the Green Belt towards Swadlincote. Is grey belt an option?

Only if the land does little for Green Belt purposes, and even then the need test is unmet while the council shows five years and its delivery result stays above 75%. The new plan is the other way in.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in East Staffordshire Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in East Staffordshire, these are the ones that matter most here.

Selling Land in East Staffordshire? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Staffordshire

  • County overview

    Selling Land in Staffordshire

    Sell land for development in Staffordshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 160% of need

    Selling Land in Staffordshire Moorlands

    Selling land in Staffordshire Moorlands? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 149% of need

    Selling Land in Stafford Borough

    Sell land in Stafford Borough. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 232% of need

    Selling Land in Lichfield

    Sell land for development in Lichfield: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 66% of need

    Selling Land in Stoke-on-Trent

    Sell land for development in Stoke-on-Trent: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 171% of need

    Selling Land in South Staffordshire

    Sell land in South Staffordshire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Homes built: 220% of need

    Selling Land in Tamworth

    Sell land in Tamworth, near Amington. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 115% of need

    Selling Land in Cannock Chase

    Sell land for development in Cannock Chase: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Newcastle-Under-Lyme

    Sell land in Newcastle-under-Lyme. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Staffordshire

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.