West Midlands council area
Selling Land in Birmingham
Checked on
Birmingham built 57% of the homes it needed in the latest Housing Delivery Test, yet the city council counts 6.45 years of housing land, so the two measures point in different directions. Its plan of January 2017 is being replaced by a new Birmingham Local Plan to 2044, and most of the city's Green Belt, which covers about 15% of its area, lies around Sutton Coldfield.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Birmingham and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Birmingham built only 57% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from January 2017, and a new one was published for consultation in August 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Birmingham
- Yards, depots, workshops and older commercial buildings across the city, from Aston and Yardley to Selly Oak and Longbridge.
- Garage courts, backland and big rear gardens that could take a short terrace or a few houses.
- Previously developed land on the city's edge, including in the Green Belt.
- Fields in Sutton Coldfield and Walmley that sit against the built-up area or the Langley extension.
- Land that has come to you through an estate and that you would rather sell than manage.
In a city, the detail of a small site decides it: title, access, contamination, neighbours and the planning history all need settling before the council sees a drawing, and on a Green Belt field the grey belt evidence comes first. We pay for all of that work and every application that follows, under an option whose price we settle with you before any work begins, set higher than the land's value in its present use. The land stays in your hands and in use until completion, and should the council refuse permission, it remains yours with nothing owed to us. Owners dealing with an estate will find the steps on our inherited land page.
Is Your Land in Birmingham a Good Fit?
You do not need to know the planning rules to sell land for development in Birmingham. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Birmingham
There are three common ways to sell land with development potential in Birmingham. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Birmingham: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Birmingham and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Birmingham
Three things shape the chances of selling land for development in Birmingham: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
57%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
6.45 years
Five years or more of deliverable housing land. Position at 1 April 2025, measured against the standard method, 4,513 homes a year, plus a 20% buffer. Stated by Birmingham City Council.
Checked sourceHomes built against homes needed
12,101
of 21,400 needed, April 2022 to March 2025
Most recent strategic plan adopted
January 2017
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The new Birmingham Local Plan to 2044 was published for Regulation 19 consultation from 13 August to 24 September 2026. On 28 July 2026 the cabinet agreed to report the plan to full Council for authority to submit, and its report ties submission to the government's 31 December 2026 deadline for plans prepared under the current system
Checked source
See how Birmingham compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Where the Fields Are in a City of More Than a Million
Birmingham City Council is a metropolitan borough council and the planning authority for the whole city, from Longbridge and Selly Oak in the south to Sutton Coldfield, which the city absorbed in 1974, in the north. The city covers about 268 square kilometres and had an estimated population of 1,183,618 in 2024. Between the centre and the edges lie districts such as Aston, Edgbaston, Erdington, Yardley and Hall Green.
- A small Green Belt, mostly in one place. The Green Belt assessment that Arup prepared for the council in October 2025 puts the Green Belt at "approximately 15% of Birmingham City's land area", and states that the significant areas "are located to the north, around Sutton Coldfield".
- Thin edges elsewhere. The same report records smaller pieces on the boundaries with Sandwell, Walsall and Bromsgrove, and strips along the river valleys of the Cole and the Woodgate.
- Brownfield first. The adopted plan names brownfield and other sites within the built-up area as "the priority", and puts the capacity of the urban area at some 45,000 homes, including empty property brought back into use and industrial land and open space that no longer does its original job.
For most people looking to sell land in Birmingham, then, the site is a plot, a yard or a building inside the city, and only around Sutton Coldfield is it likely to be a field. Which of the two you own decides almost everything that follows on this page.
Enough Land on Paper, Too Few Homes Finished
The council's Housing Land Supply Position Statement of October 2025 reviews sites at a base date of 1 April 2025 and concludes that the city has 6.45 years of deliverable land. Because the 2017 plan is more than five years old, the statement sets its sites against the national formula for local housing need, not the figure written into that plan. Its arithmetic runs as follows:
| Part of the calculation | Council's figure |
|---|---|
| Yearly need, standard method | 4,513 homes |
| Five years of need | 22,565 homes |
| Buffer | 20%, adding 4,513 homes, because the 2023 Housing Delivery Test showed delivery below 85% of the requirement |
| Five-year requirement | 27,078 homes |
| Homes under construction | 19,955 |
| Detailed permission, not started | 10,814 |
| Allocations in the adopted plan | 2,090 |
| Permitted development | 246 |
| Windfall allowance for sites not yet identified | 1,800 |
| Total supply | 34,905 homes |
| Result | 6.45 years |
The council's previous statement, of December 2024 and at a base date of 1 April 2024, used the same local housing need method and the same 20% buffer, set 26,688 homes against a yearly need of 4,448, and found 5.61 years. The yearly need barely moved between the two, so the wider margin came from a larger pipeline: 34,905 homes in 2025 against just under 30,000 a year earlier.
Why a City With Spare Land Still Counts as Short of Homes
More than half of the supply in the table, 19,955 of 34,905 homes, was already being built at the base date. The supply counts homes that are permitted or under way, while the Housing Delivery Test counts only homes finished, which is why the two measures disagree.
Under the national framework of August 2026, because Birmingham sits under 75%, policy S5 counts its unmet need as evidenced, however many years of land the council can show, and under 85% the 20% buffer the council already applies stays in place. A supply above five years does not cancel either consequence.
If you are thinking of selling land in Birmingham, the low delivery result is the figure that carries weight for you, while the supply above five years means a shortfall argument is not open to you today.
The 2017 Plan, Langley and the Homes It Sent Elsewhere
The Birmingham Development Plan was adopted by the city council on 10 January 2017 and runs to 2031. It found a need for 89,000 homes between 2011 and 2031 but planned for 51,100 in policy PG1, and committed the council to work with its neighbours on the shortfall of 37,900 homes, about 14,400 of them affordable. Growth on that scale needed land taken out of the Green Belt in the north east of the city:
- Langley, policy GA5. Land west of the A38 at Langley was removed from the Green Belt for "a sustainable urban extension of approximately 6,000 new homes", with a supplementary planning document to guide its design, phasing and access.
- Peddimore, policy GA6. A 71 hectare employment site for research, light industry, general industry and warehousing, served by a new junction with the A38.
- The urban area. The remaining homes, some 45,000, were to come from land already inside the city. Add the 6,000 at Langley and the total matches the 51,100 in policy PG1.
Langley Since Adoption
Birmingham City Council's planning committee voted unanimously in December 2022 to approve the Langley scheme, on land neighbouring Walmley, which local reporting described as 5,500 homes, including 2,000 affordable homes, with a secondary school and up to three primary schools. That is around 500 fewer homes than the 2017 plan's approximate figure. The council's Publication Plan of July 2026 carries the scheme forward under its supplementary planning document and outline planning permission 2021/10567/PA, with a new local centre and community hubs.
For owners in Walmley and the north east of Sutton Coldfield, Langley matters beyond its own boundary: it has already moved the Green Belt boundary, and fields that once sat well inside open countryside now sit beside land released and approved for a new neighbourhood of thousands of homes.
Selling Land in Birmingham: Policy S4 in the City, Grey Belt at the Edge
Because the countryside inside the city boundary is almost all Green Belt, the routes that work in a shire district apply only in part here. Where your land sits decides which test it meets:
- Inside the built-up area. Plots, yards, workshops, garage courts and backland fall under policy S4, which leans towards permission and lets the council refuse only where the harm would substantially outweigh what the scheme brings. This is the test for yards and plots across the city, from Erdington to Selly Oak.
- Previously developed land, including in the Green Belt. Green Belt policy treats yards, depots and plots with lawful buildings other than farm buildings differently from open fields, so brownfield land on the city's edge has a route of its own.
- Open Green Belt land around Sutton Coldfield. Policy S5 does not apply in the Green Belt. Grey belt housing needs evidence that the homes are needed, which is normally shown either by a delivery result under 75% or by less than five years of supply. Birmingham's 57% meets the first of those today, so a field that genuinely qualifies as grey belt has the need test behind it. Larger schemes then follow the Golden Rules, including the higher affordable housing contribution.
- Not through a boundary change. The new Birmingham Local Plan proposes no release of Green Belt land at all, so a field that would only work if the boundary were redrawn has no route in this plan, which runs to 2044.
What the 2025 Green Belt Assessment Found
Arup's assessment looked first at 35 broad parcels and then at 26 Green Belt sites that had been put forward through the council's call for sites. Of the parcels, 29 were identified as potential grey belt. Of the sites, 24 were identified as potential grey belt, and the report notes that the two sites making a strong contribution to Green Belt purposes, and the two making a weak one, were all in Sutton Coldfield. The report stresses that an assessment of this kind can only identify grey belt provisionally.
The council then decided not to use that evidence to move the boundary. Its Publication Plan states that the sites it proposes to allocate give "enough supply alongside a significant buffer" to meet the city's need, so "exceptional circumstances have not been demonstrated to justify the alteration of the Green Belt boundary", and that the Green Belt will continue to be protected to 2044. Grey belt land is therefore decided application by application under national policy, not allocated.
The assessment does not settle the question for any one field, but most of the Green Belt land it looked at came out as potential grey belt. Our grey belt guide explains the purposes a site is judged against. For yards and commercial land, our page on brownfield and yards shows the kind of site we take on.
An owner selling greenfield land in Sutton Coldfield therefore starts with the need test already met by the delivery result, and the work lies in showing that the field itself qualifies.
How the New Plan to 2044 Took Shape
The council has prepared its new Birmingham Local Plan in four consultation stages. Once adopted, it will replace the Birmingham Development Plan and three area action plans, for Aston, Newtown and Lozells, for Bordesley Park and for Longbridge, as the council's notice of publication of the final consultation records.
| Stage | Dates | What it showed |
|---|---|---|
| Issues and options | 24 October to 5 December 2022 | 115 respondents and 595 formal comments; 150 new sites put forward by landowners, developers and agents, mostly brownfield |
| Preferred options | 8 July to 27 August 2024 | A first draft of policies and growth zones, with a call for sites run alongside |
| Focused preferred options | 23 October to 4 December 2025 | A revised approach after the national framework changed in December 2024, consulted on again because the changes were too significant to make at the final stage |
| Publication (Regulation 19) | 13 August to 24 September 2026 | The plan the council intends to submit: at least 87,700 homes from 2026 to 2044, a supply of 92,768 identified, and no Green Belt release |
A Requirement Met Inside the City, With No Shortfall Passed On
Place Midlands reported on 28 July 2026 that a previously identified shortfall of around 46,000 homes, which neighbouring councils had been expected to meet, had been dropped, because the government's December 2024 changes reduced the city's estimated need. The Publication Plan itself sets the requirement for 2026 to 2044 at 87,700 homes, built from a local housing need of 4,639 homes a year, a little above the 4,513 in the October 2025 supply statement, with a 5% buffer added for market flexibility. Against that it identifies 92,768 homes from existing permissions, allocations, other suitable sites in the land availability assessment and windfalls, after a 12% lapse rate on the allocations, a margin of 5,068. The cabinet report of 28 July 2026 says growth zones are expected to take the majority of the new housing, employment and regeneration.
Dropping the shortfall means the new plan sets out to meet the city's need within its own boundary, a change from the 2017 plan, which looked to its neighbours for 37,900 homes. For a seller, that makes the built-up area the place the plan looks for its homes: a yard, workshop or garage court that can add to that supply is the kind of site the plan depends on, while a Green Belt field has to make its own case as grey belt.
What the Timetable Means for Landowners in Birmingham
The council's Local Development Scheme for 2025 to 2028 set publication for June and July 2026, submission for October 2026, examination from January 2027, the inspector's report in July 2027 and adoption in September 2027. Publication in fact opened on 13 August 2026. On 28 July 2026 the cabinet approved the plan for publication and agreed that, after the consultation, it would go to full Council for authority to submit it for examination. The cabinet report ties this to the government's deadline of 31 December 2026 for submitting plans of the current kind, and warns that missing it would mean starting again in the new plan-making system, with no new plan in place for at least another three years. The later dates in the timetable were set before the delay to publication.
Until adoption, applications are judged against the 2017 plan, the October 2025 supply statement and national policy. Supply statements came out in December 2024 and October 2025, each with a 1 April base date, so the next one is worth watching, though a change in it will matter less than the delivery result.
A Delivery Result Far Below 75%
The Housing Delivery Test 2025, published on 17 August 2026, counted 12,101 homes built over three years against 21,400 needed, giving Birmingham 57% and a shortfall of 9,299 homes. Results are refreshed once a year. The 19,955 homes under construction at April 2025 count towards the test only as they are finished within the years measured, and we make no forecast of the result.
City plots under policy S4 and grey belt fields in Sutton Coldfield need not wait for the new plan, and a Green Belt field gains nothing by waiting for it, because the plan keeps the boundary where it is. Urban land that the plan does not allocate can still come forward as a windfall site; our guide to local plan stages explains how allocations and examinations work.
For anyone thinking of selling land for development in Birmingham, submission of the new plan and then its examination are the next milestones, and while the delivery result stays below 75% the need test for grey belt housing is met.
Questions About Selling Land in Birmingham
My field near Walmley is in the Green Belt. Does Birmingham's low delivery result help it?
Policy S5 cannot help, because Green Belt land falls outside it. Grey belt policy can, where a delivery result below 75% is one of the usual ways of showing the need for homes. The field must still qualify as grey belt, which depends on the part it plays in serving the purposes Green Belt exists for.
The council says it has more than five years of land. Does that count against my yard in Erdington?
Not much. Inside the city the deciding test is policy S4, where refusal needs harm that substantially outweighs a scheme's benefits, so a yard is judged mainly on its own merits: its access, its neighbours, its lawful use and what new homes would replace.
The Langley extension is planned right next to my land. Does that change anything?
It can. Langley moved the Green Belt boundary when it was taken out of the Green Belt in 2017, and land beside a new neighbourhood may do less for Green Belt purposes than it did before. That is a judgement made field by field, and it is one of the first things we look at.
I put land into the call for sites in 2022 or 2024. Is it in the new plan?
The Publication Plan shows which sites the council has chosen to allocate. The council's 2025 Green Belt assessment tested 26 Green Belt sites from the call for sites, but the plan allocates no Green Belt land. If yours is not allocated, it is not the end of the matter: a sound urban site can still be taken forward under policy S4, and a grey belt field under national policy.
Is a single garage court in Yardley too small to be worth your time?
No. The council's supply includes an allowance of 1,800 homes from windfall sites, land that no plan or list has yet identified, and a garage court with a sound case is that kind of site. The kind of site we mean is on our paddocks and small sites page.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Birmingham Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Birmingham stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Birmingham? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in West Midlands
County overview
Selling Land in the West Midlands
Sell land in the West Midlands. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 92% of need
Selling Land in Dudley
Sell land for development in Dudley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 34% of need
Selling Land in Sandwell
Sell land for development in Sandwell: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 53% of need
Selling Land in Solihull
Sell land in Solihull, near Shirley. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 56% of need
Selling Land in Walsall
Sell land for development in Walsall: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 47% of need
Selling Land in Coventry
Sell land in Coventry, near Keresley. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 59% of need
Selling Land in Wolverhampton
Sell land for development in Wolverhampton: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond the West Midlands
- BromsgroveWorcestershire · 2.24 years of housing land
- LichfieldStaffordshire · 3.5 years of housing land
- North WarwickshireWarwickshire · 1.5 years of housing land
Sources
- Birmingham City Council: Birmingham Development Plan 2031 (adopted January 2017)
- Birmingham City Council: Housing Land Supply Position Statement 2025 (October 2025)
- Birmingham City Council: Housing Land Supply Position Statement 2024 (December 2024)
- Birmingham City Council: Birmingham Local Development Scheme 2025 to 2028 (January 2025)
- Birmingham City Council: New Local Plan for Birmingham (October 2025)
- Birmingham City Council: Notice of the publication of the Birmingham Local Plan, Regulation 19 consultation (August 2026)
- Birmingham City Council: Birmingham Local Plan preferred options consultation statement (summer 2024)
- Arup for Birmingham City Council: Birmingham Green Belt Assessment, final report (October 2025)
- Birmingham City Council: Cabinet decision and report, Birmingham Local Plan: Publication and Submission, with the Publication Plan (July 2026)
- Place Midlands: Birmingham launches final consultation on 87,700-home local plan (July 2026)
- Express and Star: Thousands of new homes, shops, schools and facilities given go-ahead for site (December 2022)
- Wikipedia: Birmingham
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.