Hampshire council area
Selling Land in Basingstoke and Deane
Checked on
Basingstoke and Deane scored 94% in the Housing Delivery Test 2025, clear of the lines that add a buffer or trigger the unmet need test. Yet by its own reckoning it holds 3.1 years of housing land, and in October 2026 it restarted its new plan under the reformed system after water supply stalled the last draft. For land around Basingstoke, Tadley, Overton and Whitchurch, that gap is what counts.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Basingstoke and Deane and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Basingstoke and Deane can show 3.1 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from May 2016, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Basingstoke and Deane
- Fields next to the built edge of Basingstoke, Chineham and the villages the town has grown towards.
- Land beside Overton, Whitchurch, Oakley, Bramley or Kingsclere that reads as part of the village rather than open downland.
- Sites around Tadley and Baughurst that sit outside the Aldermaston emergency planning zone.
- Former farmyards, workshops and commercial land with lawful buildings or hard surfaces.
- Larger holdings where part of the land could carry open space, habitat or drainage for homes on the rest.
- Land with a road frontage, or a realistic way of getting one.
Land deep in the North Wessex Downs is harder, and we will say so. Our page on farmland sets out how we look at agricultural holdings of different sizes.
Is Your Land in Basingstoke and Deane a Good Fit?
You do not need to know the planning rules to sell land for development in Basingstoke and Deane. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Basingstoke and Deane
There are three common ways to sell land with development potential in Basingstoke and Deane. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Basingstoke and Deane: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Basingstoke and Deane and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Basingstoke and Deane
Three things shape the chances of selling land for development in Basingstoke and Deane: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
94%
Below 95%: the council must publish an action plan to improve delivery.
Five-year housing land supply
3.1 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against a five-year requirement of 5,830 homes under the standard method, including a 5% buffer. Stated by Basingstoke and Deane Borough Council, at the Whitchurch appeal inquiry (decision of 15 September 2026).
Checked sourceHomes built against homes needed
2,415
of 2,558 needed, April 2022 to March 2025
Most recent strategic plan adopted
May 2016
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
Draft Local Plan consulted on November 2025 to January 2026, then set aside over water supply; new Local Plan started under the 2026 regulations with notice given on 9 October 2026; scoping consultation and call for sites 9 October to 20 November 2026; the timetable of 9 October 2026 puts Gateway 1 on 12 March 2027, submission on 23 February 2029 and adoption on 20 September 2029
Checked source
See how Basingstoke and Deane compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A Borough That Builds, Yet Runs Short of Land
Basingstoke and Deane Borough Council covers Basingstoke, which has no parish council and is run directly by the borough, the smaller towns of Tadley and Whitchurch, and a wide rural area of chalk downland and villages such as Overton, Kingsclere, Oakley and Bramley. The council's draft plan names Basingstoke its principal service centre.
- A delivery score of 94%. That clears the 75% and 85% thresholds but falls short of 95%, which obliges the council to produce an action plan on speeding up building.
- A plan dating from May 2016. The adopted Local Plan is now 10 years old, so its housing figure has been overtaken by the government's standard method.
- A shortfall in supply. At a planning appeal in August 2026 the council put its housing land supply at 3.1 years from 1 April 2025, slightly below the figure in its own December 2025 monitoring report.
- A draft plan for over 20,000 homes. The latest draft, consulted on between November 2025 and January 2026, plans for at least 20,402 homes from 2024 to 2042.
- A plan restarted over water. In September 2026 the council said water supply capacity and other strategic infrastructure had become significant issues for the plan, and on 9 October 2026 it gave notice of a new Local Plan under the 2026 regulations, with a scoping consultation and call for sites opened the same day and a closing date of 20 November 2026.
The combination is unusual: a borough that clears the delivery test well enough to avoid a buffer, yet is well short on supply. Here it is the supply position, not the headline score, that decides how an application on unallocated land is weighed.
Selling Land in Basingstoke and Deane: Why Supply, Not the Delivery Score, Decides
Policy S5 of the August 2026 National Planning Policy Framework opens a route for homes beyond a settlement boundary when three things line up: need for housing shown by evidence, a site that genuinely belongs with the town or village next to it, and roads, schools and drainage able to absorb the extra homes. A council scoring below 75% is automatically treated as having that need. At 94%, Basingstoke and Deane is not, but national policy also lets a missing five-year supply stand as evidence of need, and the council's own figures show one.
Two Supply Figures, One Conclusion
The monitoring report gives 3.2 years: 3,814 deliverable homes against a five-year requirement of 5,996, built from 1,142 homes a year plus a 5% buffer. At the Whitchurch appeal inquiry in August 2026 the council put 3.1 years, against a requirement of 5,830, and the appellant argued for 2.2. The supply total is the same in both council figures, so the gap lies in how the requirement was worked out for the inquiry. It makes no practical difference: every figure is well below five years, and the Overton inspector called the shortfall persistent and unlikely to be resolved before a new plan is adopted.
What Two Recent Appeals Show
- Overton, allowed in April 2026. An inspector granted up to 130 homes, with 40% affordable housing, on land south west of Sapley Lane that sits just outside Overton's settlement boundary. The shortfall was given significant weight, and the landscape evidence found a negligible effect on the North Wessex Downs, about 1.7km away. The decision predates the new Framework, but its reasoning on supply still applies.
- Whitchurch, dismissed in September 2026. A scheme for 115 homes east of Bere Hill was decided after the new Framework came into force, and the inspector applied policy S5. Despite the shortfall, the harm from a layout described as hard, heavy and repetitive, and the effect on the setting of the North Wessex Downs, were found to substantially outweigh the benefits.
Together they show that the shortfall gets a well placed site through the door, but design, landscape and the way the homes meet the existing edge decide the outcome. That is where we spend on the planning case.
The Draft Plan to 2042, and the Land It Leaves Out
The council consulted on a full draft plan in early 2024, then had to rework it when the December 2024 changes to national policy raised its housing figure from about 830 homes a year to roughly 1,150. The November 2025 draft answers that with a stepped target: at least 900 homes a year for the first five years after adoption, then at least 1,287 a year to 2042. Its main proposals are:
| Area | What the November 2025 draft proposes |
|---|---|
| Basingstoke town | 500 homes in the town centre and 1,000 at Basing View, plus Northern Manydown (already permitted for up to 3,500 homes), Southern Manydown (2,750 in the plan period), Whitmarsh Lane extended by 600 homes at Lodge Farm, and about 300 north of Pack Lane. |
| Popham Garden Village | Enlarged from 3,000 to about 4,250 homes on the Popham Airfield site, with about 1,800 expected by 2042. |
| Upper Swallick Garden Village | About 2,500 homes in total and 1,200 by 2042, near Cliddesden and Ellisfield with access from the A339 and B3046, a new primary school and a village centre. |
| Tadley and the north | About 235 homes at Skates Lane, Tadley, and about 350 at West End Farm, Mortimer. |
| Rural towns and villages | About 500 homes at Oakley Farm, Wash Water, and housing figures of 410 for Overton, 185 for Whitchurch and 165 for Kingsclere. |
The draft gives Oakley, Bramley and several smaller villages little or no new housing, to avoid cumulative harm to their character. Land there is more likely to come forward through an application, a neighbourhood plan or a later review. Our guide to local plans and how land is put forward explains how omitted land can still be argued at examination.
If you own land near one of those villages and are thinking of selling it for development, being left out of the draft is not the end of the matter, but the case then rests on the supply shortfall and on a site that sits well against the village.
Selling Land Near the Downs or Aldermaston, and the Water Question
- Water supply. Local reporting in July 2026 explained that South East Water cannot yet guarantee enough water for the planned homes, after a transfer pipeline missed its delivery date and the Environment Agency refused to let the company keep drawing from one source.
- The North Wessex Downs. The council's draft strategy singles out Whitchurch and Kingsclere as constrained by their closeness to the National Landscape, which keeps their housing figures modest. The Whitchurch appeal shows the weight its setting carries outside the boundary.
- AWE Aldermaston. Around Tadley, the council will not support new allocations inside the Detailed Emergency Planning Zone of the Atomic Weapons Establishment, and any future housing sites there must lie outside the defined consultation zone.
- Nutrients. The council's monitoring report records applications approved in 2024/25 using strategic nitrogen mitigation, and notes that no strategic scheme yet existed for phosphorus. Which rule applies depends on where a site's waste water goes, and we check that before anything else.
Outside the emergency planning zone, none of these rules out a field by itself. They decide which evidence we commission first.
For an owner around Tadley or Baughurst thinking of selling land, the emergency planning zone is the first line we check, since it decides whether the rest of the review is needed at all.
When to Sell Land in Basingstoke and Deane, While the Water Question Is Settled
Housing Delivery Test results come out annually. The most recent, the Housing Delivery Test 2025, was released on 17 August 2026 and measures April 2022 to March 2025. In the 2023 measurement, which the council's December 2025 monitoring report still relied on, the borough scored 131%. The next result will drop 2022/23, the strongest of the three years in the council's own figures with 986 net completions, and add 2025/26, for which the council has not yet published completions. The same report shows the yearly target rising from 828 homes to 1,142 under the current standard method. If the next score fell below 85%, a 20% buffer would be added to the supply calculation. Below 75%, unmet need would be treated as established without any argument about supply. At 95% or more, the action plan would fall away, but the supply shortfall would remain unless the council could show otherwise.
A Plan Not Expected Before Autumn 2029, and a Merger Withdrawn
The council's Local Development Scheme of February 2025 showed a final draft in summer 2026, submission in winter 2026, examination in spring 2027 and adoption in winter 2027. That did not hold. The council's own update in September 2026 said it would revise the timetable once it had worked through the water supply issues with its partners, and local reporting in July 2026 recorded that the council had asked the government for more time and did not expect a finished plan before autumn 2029. The answer came on 9 October 2026, when the council gave notice of a new Local Plan under the 2026 regulations, explaining that significant concerns about the capacity and long-term resilience of the water supply network meant it could not carry on under the old system. Its scoping consultation and a fresh call for sites opened the same day with a closing date of 5pm on 20 November 2026, and its timetable of 9 October 2026, which it reviews monthly, puts the Gateway 1 self-assessment on 12 March 2027, consultation on the plan's content and evidence from 2 July to 27 August 2027, consultation on the proposed plan from 30 June to 25 August 2028, submission on 23 February 2029 and adoption on 20 September 2029. The sites the new plan allocates will be drawn from what is put forward from this scoping stage onwards, so land with its evidence ready early starts ahead.
In March 2026 the government decided that Basingstoke and Deane would merge with Hart and Rushmoor into a North Hampshire unitary council from 1 April 2028. On 7 September 2026, after fresh legal advice, it withdrew that decision and began a review. The borough council stays the planning authority, its adopted plan still applies, and the May 2027 elections will be held on the present boundaries.
An Application Under S5 First, the Plan Second
The borough is short of land now, and the plan that would fix that is years away. For a well placed site that points to an application under policy S5, with the plan as a second route. Our agreement stays in force for as long as an application or appeal is under consideration, so a change in the council's position part way through does not leave you exposed. The usual stages are set out in how long planning takes.
Questions About Selling Land in Basingstoke and Deane
The council scored 94% on delivery. Why would it approve homes on my field?
Because the score is only half the picture. The council's own figures show 3.1 years of housing land, and under national policy a shortfall like that is evidence of unmet need, so a site that sits well against a town or village can use policy S5.
Does the Aldermaston zone rule out land near Tadley?
Only if it lies inside the Detailed Emergency Planning Zone, where the council will not support new housing allocations. Land outside the zone is assessed in the normal way, and the draft plan itself proposes homes at Skates Lane on that basis.
Will the water supply problem stop any planning application?
Not automatically. The concern is about the scale of growth in the areas South East Water serves. For a single site we check how it would be supplied before recommending an application.
My village has a neighbourhood plan. Does that close the door?
Not necessarily. The Overton appeal site sat outside the settlement boundary inside a neighbourhood plan area and was still allowed, because of the supply shortfall. A neighbourhood plan that allocates sites can also be a route in its own right, and we can look at both.
Is my application still decided by Basingstoke and Deane?
Yes. The North Hampshire merger planned for April 2028 was withdrawn in September 2026 while the government reviews reorganisation, so the borough council decides applications under its adopted plan and national policy. You keep using your land throughout, and how our agreements work explains what we handle along the way.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Basingstoke and Deane Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Basingstoke and Deane stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Basingstoke and Deane? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Hampshire
County overview
Selling Land in Hampshire
Sell land for development in Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 64% of need
Selling Land in Test Valley
Sell land for development in Test Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 79% of need
Selling Land in East Hampshire
Sell land for development in East Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 137% of need
Selling Land in Hart
Sell land in Hart, near Fleet. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 174% of need
Selling Land in Winchester
Sell land for development in Winchester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 60% of need
Selling Land in Fareham
Sell land for development in Fareham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 25% of need
Selling Land in Gosport
Sell land for development in Gosport: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 48% of need
Selling Land in New Forest District
Sell land in New Forest, near Totton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 94% of need
Selling Land in Eastleigh
Sell land for development in Eastleigh: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 80% of need
Selling Land in Havant
Sell land for development in Havant: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 176% of need
Selling Land in Rushmoor
Sell land for development in Rushmoor: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 11% of need
Selling Land in Portsmouth
Sell land for development in Portsmouth: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 30% of need
Selling Land in Southampton
Sell land for development in Southampton: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Hampshire
- West BerkshireBerkshire · 5.7 years of housing land
- WokinghamBerkshire · 2.5 years of housing land
Sources
- Basingstoke and Deane Borough Council: Local Development Scheme (February 2025)
- Basingstoke and Deane Borough Council: About the draft Local Plan, latest news (September 2026)
- Basingstoke and Deane Borough Council: About the Local Plan update, the new Local Plan (October 2026)
- Basingstoke and Deane Borough Council: Notice to commence the Local Plan and notice of scoping consultation (9 October 2026)
- Basingstoke and Deane Borough Council: Local Plan timetable (9 October 2026)
- Basingstoke and Deane Borough Council: Draft Local Plan policy SPS1, scale and distribution of development (November 2025)
- Basingstoke and Deane Borough Council: Draft updated spatial strategy, chapter 4 (November 2025)
- Basingstoke and Deane Borough Council: Authority Monitoring Report 2024/25 (December 2025)
- Planning Inspectorate: Appeal decision, land south west of Sapley Lane, Overton (April 2026)
- Planning Inspectorate: Appeal decision APP/H1705/W/26/6006893, land east of Bere Hill, Whitchurch (15 September 2026)
- Newbury Today: Water supply fears for Basingstoke and Deane's Local Plan (July 2026)
- Hampshire County Council: Government announces new model for councils across Hampshire and the Solent (March 2026)
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.