Skip to content

We pay for the planning.

Call us:020 3953 5635

Hampshire council area

Selling Land in Eastleigh

Checked on

Eastleigh adopted its local plan in April 2022, yet the plan began with a shortfall after the inspector struck out its largest proposed site, and the council now reports 4.2 years of housing land. Its new plan to 2044 has only just started. That gives well placed land a real case today.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Eastleigh and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Eastleigh can show 4.2 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from April 2022.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Eastleigh

Between a supply shortfall that supports applications now and a plan review due to publish its preferred sites in 2027, the land we look for here is wider than the four strategic options:

  • Fields on the edge of Fair Oak, West End, Bursledon or Hedge End that sit outside the nine settlement gaps, or at their well contained margins.
  • Land beside the new neighbourhoods at Horton Heath and Boorley Green that could share their access and drainage.
  • Plots and older commercial buildings in the urban areas, where the Issues and Options paper puts potential capacity at around 2,160 homes, including along the Southampton Road corridor it wants transformed in Eastleigh town centre.
  • Land within walking distance of Eastleigh or Southampton Airport Parkway stations on the main line.
  • Small sites of the kind the plan already relies on: it allows for 1,475 homes from windfall over its period, about 116 a year.
  • Larger farm holdings where lower lying land could become the wetland, habitat or open space the council proposed, in its Issues and Options paper, to allocate for environmental mitigation, alongside homes on the better placed part.

Harder land is open countryside that relates to no settlement. The adopted plan's countryside policy allows little housing there beyond conversions, replacements and rural workers' homes, and land deep in the Itchen or Hamble valleys faces flood risk as well. We tell you plainly if your land falls there.

Is Your Land in Eastleigh a Good Fit?

You do not need to know the planning rules to sell land for development in Eastleigh. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Eastleigh

There are three common ways to sell land with development potential in Eastleigh. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Eastleigh: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Eastleigh and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Eastleigh

Three things shape the chances of selling land for development in Eastleigh: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    94%

    Below 95%: the council must publish an action plan to improve delivery.

  • Five-year housing land supply

    4.2 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the adopted local plan requirement of 729 homes a year, plus a 5% buffer. Stated by Eastleigh Borough Council.

    Checked source
  • Homes built against homes needed

    1,854

    of 1,983 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    April 2022

    The plan currently used to decide applications.

  • New plan progress

    Latest step

    New Local Plan to 2044 started June 2026; scoping consultation closed 24 September 2026

    Checked source

See how Eastleigh compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Between Southampton, the Itchen and the Hamble

Eastleigh Borough Council covers a compact, busy stretch of south Hampshire between Southampton, Southampton Water and the River Hamble. Its adopted plan ranks Eastleigh as the main town, Chandler's Ford and Hedge End as large towns, and Bishopstoke, Botley, Bursledon, Fair Oak, Hamble, Netley Abbey and West End as larger villages, with Allbrook, Boorley Green, Butlocks Heath and Horton Heath below them. The council's own issues paper puts the borough at 79.8 square kilometres with about 136,500 people.

  • 94% in the Housing Delivery Test 2025. Clear of the thresholds at 75% and 85% but short of 95%, which means an action plan to raise the rate of building.
  • A plan adopted in April 2022. The Eastleigh Borough Local Plan 2016 to 2036 is 4 years old and still sets the housing figure the council works to.
  • 4.2 years of supply. The council's January 2026 supply statement, counting from 1 April 2025, says it cannot show a five-year supply.
  • Nine settlement gaps. Policy S6 keeps open the land between places such as Eastleigh and Bishopstoke, Fair Oak and Horton Heath, and Hedge End and Botley.
  • Rail and air links. The plan names Eastleigh and Southampton Airport Parkway stations on the main line, and treats Southampton Airport as one of three gateways to the sub-region.

Most owners selling land for development in Eastleigh hold either a field near one of those nine gaps or a plot inside the built-up area, and which of the two it is shapes everything that follows.

A Recent Plan That Started Short, and Why More Land Is Needed

The adopted plan sets a minimum of 14,580 new homes from 2016 to 2036. It was meant to include a large new community north of Bishopstoke and Fair Oak, but the inspector recommended deleting that Strategic Growth Option, leaving a shortfall of 2,614 homes. The plan itself therefore committed the council to begin updating it within a year of adoption.

The large allocations that did survive are still being built, and the council's supply statement shows how they have moved on since the plan was written:

SiteIn the 2022 planIn the January 2026 supply statement
Horton HeathAbout 1,500 homesFull permission for 381 homes, then outline permission in October 2025 for 2,119 more
Stoneham ParkAbout 1,150 homesA scheme of 1,074, with 151 left to build at April 2025 and the final phase due in 2026/27
Boorley GreenAbout 2,080 homes across two allocationsThree linked sites totalling 2,077, with most of the remainder at Boorley Gardens
Botley375 homesOutline permission from March 2022, with first homes possible from 2027/28

Why Horton Heath Looks Bigger Than the Plan

The plan shows Horton Heath at about 1,500 homes; the supply statement adds up to about 2,500. The first is what the council allocated in 2022, the second the permissions since granted, which is what now counts towards supply. For a neighbouring landowner the later figure matters more, because it sets the roads, school places and drainage that will exist around the site.

For an owner selling land elsewhere in the borough, the deleted growth option matters as much as the sites that survived: a plan that began thousands of homes short leaves room for land it never allocated.

Selling Land Near Eastleigh's Settlement Gaps While Supply Is Short

Under the August 2026 National Planning Policy Framework, policy S5 supports homes beyond a settlement where unmet housing need is evidenced, the land is physically well related to the place beside it, and the infrastructure can cope. Eastleigh's delivery score alone does not establish that need, because it is above 75%. Its supply does. The January 2026 statement measures 3,181 deliverable homes against 3,827 needed over five years, a gap of 646, using the adopted plan's 729 homes a year plus a 5% buffer. National policy accepts a shortfall of that kind as evidence of unmet need.

The Buffer Rule Since 1 July 2026

The January statement uses a 5% buffer, and it was published before a newer rule took effect. Since 1 July 2026, when deciding applications though not when making plans, national policy looks for a 20% buffer wherever a plan figure adopted within five years, and tested against national policy that predates December 2024, comes to no more than 80% of today's standard method need. Eastleigh's plan, examined before its adoption in 2022, sets 729 homes a year, about 79% of the 921 that Turley's May 2026 standard method tables give for the borough. On the face of it the rule applies until the plan turns five. With a 20% buffer, the council's own supply of 3,181 homes would be set against 4,374 needed, roughly 3.6 years. The council has not yet published a figure on that basis.

The settlement gaps are the main counterweight. They are a local plan policy, not Green Belt, so any harm to one is set in the balance against the homes the borough lacks, instead of counting as an outright bar.

How We Test an Eastleigh Field

  1. Which gap, if any. We map the land against the nine gaps in policy S6 and judge how much openness would remain between the two places.
  2. The edge it meets. A site has to read as part of Fair Oak, Bursledon or West End, not as a separate outpost, with safe access onto a road that can take it.
  3. The river it drains to. That decides whether nitrogen, phosphorus or both need mitigating, and how much land the solution takes.
  4. Flooding. We check the Itchen, Hamble and Monks Brook valleys and any surface water routes across the site, as the flood risk guide explains.

Selling Land That Drains to the Itchen or the Solent

  • Phosphorus for the Itchen. The council's interim strategy of July 2022 applies phosphorus neutrality in the River Itchen catchment, covering parts of Eastleigh, Bishopstoke and Fair Oak and reaching out to Horton Heath and West End, and to homes in Chandler's Ford and Eastleigh served by the Chickenhall treatment works, which discharges to the river.
  • Nitrogen for the Solent. The council has run a nitrogen neutrality scheme since 2020 for the Solent's protected waterways and coast.
  • Council credits. The 2022 strategy offered phosphate credits from council-owned land taken out of farming, alongside mitigation designed into a site's own drainage.
  • Recreational pressure. The issues paper lists visitor disturbance of the Solent's protected sites among the borough's constraints.

These costs come out of the value of a scheme. They are part of the planning work we commission and pay for, and on a larger holding some of the land can supply the mitigation for homes on the rest.

Where the Next Homes Could Go

The Issues and Options paper, consulted on from 4 December 2024 to 29 January 2025, put the new plan's housing need at 645 homes a year under the old standard method or 902 under the proposed new one, about 12,900 to 18,040 homes over twenty years. Around 6,308 were already accounted for by permissions and allocations, leaving 6,590 to 11,730 to find. It also asked whether Eastleigh should help meet needs from the wider Southampton housing market that are unlikely to be met where they arise. Four strategic options were set out:

OptionHomes if fully builtWhat the paper noted
A: north east of Fair OakAbout 4,600Close to the village centre, on lower grade farmland
B: south of BishopstokeAbout 2,800Only around half the landowners in support
C: north of West EndAbout 4,600Poor public transport, medium grade farmland
D: north of Hedge EndAbout 1,300The best rail access, on higher grade farmland

Alongside them sit more than 50 small and medium site options. The council has stressed that all of these were put forward by landowners and developers and are not its own proposals. Its June 2026 consultation report records around 670 responses, the most objections to option A, and concern about cumulative growth in Fair Oak, Horton Heath and Boorley Green. It also records smaller sites as important for delivery. What makes a modest plot work is covered on our paddocks and small sites page.

When to Sell Land in Eastleigh, Before Its Plan Turns Five

The government publishes the Housing Delivery Test each year. The Housing Delivery Test 2025, out since 17 August 2026, covers April 2022 to March 2025. In the 2023 measurement, which the council's January 2026 statement quoted, Eastleigh scored 122%, so the action plan is new territory for it. A fall below 85% in the next result would require a 20% buffer on delivery grounds too. A fall below 75% would treat unmet need as established outright. Reaching 95% would remove the need for an action plan, though on its own it would leave the supply shortfall untouched.

April 2027 is the date that matters for supply. The January 2026 statement measures supply against the adopted plan's 729 homes a year. National policy switches to the government's standard method once a plan is more than five years old, and Eastleigh's reaches that point in April 2027, two years before the new plan is due. The standard method now gives 921 homes a year, so the bar would rise. We are not predicting the next supply figure.

A Plan Restarted in June 2026, and the Southampton Merger Withdrawn

The council restarted its plan under the new national system in June 2026, describing it as a change of process rather than a fresh start. Its published timetable shows:

  • A scoping consultation, which ran from 20 August to 24 September 2026.
  • A Gateway 1 self-assessment on 29 October 2026.
  • Consultation on the proposed plan content, including preferred sites, from 3 June to 15 July 2027.
  • Consultation on the full plan from 1 June to 27 July 2028, submission on 26 October 2028 and adoption on 26 April 2029.

A government decision of 25 March 2026 would have combined Eastleigh and Southampton in a South West Hampshire unitary council from 1 April 2028. That decision was withdrawn on 7 September 2026 while ministers review the process. The plan is being prepared for the current borough, Eastleigh still decides applications, and the May 2027 local elections take place on existing boundaries.

An Application Now, the Plan in Parallel

Preferred sites will not be published until mid 2027, and adoption is set for 2029. Land that already works on its own merits is usually better put forward by application now, while the supply shortfall stands, with the plan as a parallel route. Our agreements continue while any application or appeal is being decided, and option and promotion agreements compared sets out how the two models differ.

Questions About Selling Land in Eastleigh

The plan is only from 2022. Can an application on unallocated land really succeed?

It can, where the site is right. The council's own statement shows 4.2 years of supply, and national policy treats that shortfall as evidence of unmet need. The plan being recent does not change that, although the gaps and the river rules still have to be met.

Should land in one of the strategic options wait for the council to choose?

Not necessarily. Preferred sites are not due for consultation until mid 2027. Depending on the field, an application now or a submission to the plan may be the better route, and we will say which we recommend.

Does phosphorus neutrality apply to my land?

Only if its waste water would reach the River Itchen, which covers parts of Eastleigh, Bishopstoke, Fair Oak, Horton Heath and West End and homes served by Chickenhall. Nitrogen for the Solent applies more widely. We identify both in our first review.

Is my field in a settlement gap worth looking at?

Sometimes. A gap is weighed against housing need rather than treated as a ban, and a field already contained by roads or housing can keep the gap working. Land at the narrowest point between two places is much harder.

Is Eastleigh still merging with Southampton?

Not on the current timetable. The government withdrew the merger decision in September 2026 and is reviewing reorganisation, so Eastleigh keeps deciding applications and its plan is still being written for the current area. You keep using the land throughout. Our Hampshire page shows how the other councils in the county compare.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Eastleigh Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Eastleigh stands on housing shapes which matter most here.

Selling Land in Eastleigh? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Hampshire

  • County overview

    Selling Land in Hampshire

    Sell land for development in Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 60% of need

    Selling Land in Fareham

    Sell land for development in Fareham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 64% of need

    Selling Land in Test Valley

    Sell land for development in Test Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 174% of need

    Selling Land in Winchester

    Sell land for development in Winchester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 30% of need

    Selling Land in Southampton

    Sell land for development in Southampton: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 25% of need

    Selling Land in Gosport

    Sell land for development in Gosport: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 48% of need

    Selling Land in New Forest District

    Sell land in New Forest, near Totton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Basingstoke and Deane

    Selling land in Basingstoke and Deane? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 79% of need

    Selling Land in East Hampshire

    Sell land for development in East Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 80% of need

    Selling Land in Havant

    Sell land for development in Havant: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in Hart

    Sell land in Hart, near Fleet. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 176% of need

    Selling Land in Rushmoor

    Sell land for development in Rushmoor: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 11% of need

    Selling Land in Portsmouth

    Sell land for development in Portsmouth: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.