Skip to content

We pay for the planning.

Call us:020 3953 5635

Hampshire council area

Selling Land in Southampton

Checked on

Southampton built 30% of the homes it needed in the Housing Delivery Test 2025, and its housing strategy, adopted in 2010 and amended in March 2015, plans only as far as 2026. A new plan under the government's new system reached its first gateway in October 2026. With no farmland inside the city, almost every opportunity here is a site that is already in use: a yard, a workshop, an older commercial building or a large garden.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Southampton and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Southampton built only 30% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from March 2015, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Southampton

  • Yards, depots, workshops and small commercial premises in Shirley, Portswood, Northam, Woolston and the other districts, especially where the business is moving on.
  • Garage courts, backland and large rear gardens in Bassett Green, Swaythling, Weston or Thornhill with a realistic access of their own.
  • Church halls, social clubs and low-rise shop parades with a yard or car park behind them.
  • Sites within walking distance of Southampton Central or one of the city's local stations.
  • Land with an old permission that was never built, or inherited property with space for more homes.

On a city site the first checks are flood level near the rivers and the water, any contamination from a previous use, the access, and the nitrogen budget, and our desktop review covers them before anyone visits. Where we take a site on, every report and application after that is at our cost, under an option at a price fixed before any work begins and higher than the land's value in its present use. The yard or garden stays in your use until completion, and if permission is refused it remains yours with nothing owed. Owners who have inherited land or property in the city can read how that works for executors and families.

Is Your Land in Southampton a Good Fit?

You do not need to know the planning rules to sell land for development in Southampton. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Southampton

There are three common ways to sell land with development potential in Southampton. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Southampton: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Southampton and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Southampton

Three things shape the chances of selling land for development in Southampton: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    30%

    Below 75%: treated as having evidenced unmet housing need under national policy S5.

  • Five-year housing land supply

    Not published

    No current figure published. Stated by Southampton City Council, which publishes no current five-year supply figure: its housing land supply page says an updated position statement will follow its land availability assessment and that the buffer is set at 20%, and its last published figure (4.53 years for 2021/22, in its Housing Delivery Test action plan) was measured against the older standard method with the 35% city uplift.

    Checked source
  • Homes built against homes needed

    1,342

    of 4,440 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    March 2015

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    Southampton City Council began a new Southampton Local Plan under the new plan-making system on 26 June 2026, replacing the City Vision Local Plan, which had reached a draft plan with options in October 2022. Scoping and a call for sites ran from 7 September to 11 October 2026, and the council completed Gateway 1 on 30 October 2026. Its timetable (last updated 15 July 2026) gives consultation on plan content from 1 March to 18 April 2027, submission on 11 September 2028 and adoption on 21 March 2029

    Checked source

See how Southampton compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

A City Built Up to Its Boundary, Between the Test and the Itchen

A unitary authority since 1 April 1997, Southampton City Council decides every planning application in the city and writes its local plan. The River Test runs along the western edge and the Itchen through the middle, splitting the city into east and west before the two rivers meet at the head of Southampton Water. The 2021 census counted 248,922 people in the city.

  • No room to spread. The council's Core Strategy states that "for the most part Southampton has developed up to its administrative boundary", and expects the vast majority of future development to be the redevelopment of previously developed land.
  • No farmland at all. The council's nitrogen position statement records that "there is no farmland in the city".
  • A port city on the main line. The port is the largest freight port on the Channel coast, and Southampton Central has trains towards London, Bournemouth, Portsmouth and Bristol.

If you are thinking of selling land in Southampton, you are almost certainly selling a plot inside the city, and it will be judged as a town site rather than a field.

Why the Delivery Result Fell, and the Lower Yardstick That Follows

Southampton passed the delivery test comfortably for years, at 149% in 2019 and 138% in 2021, the council's action plan records. Then two things changed. Completions fell sharply from 2021/22, and the target rose, because the older standard method added a 35% uplift for the largest cities and urban centres, Southampton among them. The council's Authority Monitoring Report for 2024/25 gives the net completions behind the latest result:

Completions from Southampton City Council, Authority Monitoring Report 2024 to 2025, Table 6 and paragraph 29. Government figures from the Housing Delivery Test 2025.
YearNet new homes in the cityWhat the council's documents say
2021/22538Outside the latest test, and well below the Core Strategy's 815 a year.
2022/23296The lowest year in a table running back to 2006/07.
2023/24301The second lowest year in the same table.
2024/25744Including 125 on small sites and 173 counted as student accommodation.
Three years in the test1,342 counted by the government against 4,440A result of 30%.

The Housing Delivery Test action plan written after the previous result names the Covid-19 lockdowns, the delays while developments had to demonstrate nutrient neutrality, and viability, which is harder on the brownfield land where most city sites lie. It also found that 636 homes with permission were not delivered because their permissions lapsed, while 4,903 were granted in the three years to 2022/23, almost three times the number completed.

A Smaller Figure From 2025/26

The standard method revised in December 2024 "removed the 35% uplift for the largest cities and urban centres such as Southampton", and from the 2025/26 monitoring year it sets the city a figure of 1,208 homes a year, down from 1,473. No year since 2018/19, when 1,776 homes were completed, has come close to it.

A Supply Position the Council Has Yet to Publish

Southampton has not published a current five-year housing land supply figure. Its housing land supply page says that an updated position statement will follow its new land availability assessment, and confirms that the buffer "is currently set at 20%" because of the delivery result. The latest figure the council has given, in its action plan, is 4.53 years for 2021/22, measured against the older method with the city uplift, a yardstick that no longer applies. The action plan itself concedes that the council "has not recorded a five year housing land supply position on an annual basis" in recent years.

On our own working, 1,208 homes a year for five years is 6,040, and the 20% buffer takes the requirement to 7,248, or about 1,450 a year. The monitoring report records 5,705 homes with permission but not yet built, 536 of them student homes, though not every permission counts as deliverable within five years. Against 744 homes built in 2024/25, that is a large task.

How the National Policies Apply in the City

In the August 2026 framework, policy S4 governs building inside a settlement, and a scheme there is to be approved unless its harm would substantially outweigh its benefits. It is the test for almost every site in Southampton. Policy S5 looks outward, to land that relates well to a settlement and can be served by its roads, drainage and schools, where unmet need is evidenced, and a result below 75% counts as that evidence; in a city built up to its boundary, S5 has little ground to work on. When the council publishes a supply figure, a shortfall would be evidence of unmet need to be weighed, not an automatic finding. Our guide to the 2026 framework sets out both policies.

So, for most owners selling land for development in Southampton, the S4 test carries the case, and the delivery result adds weight to it.

From the 2010 Core Strategy to a Plan Under the New System

Policy CS 4 of the Core Strategy plans for "an additional 16,300 homes" between 2006 and 2026, which the monitoring report treats as 815 a year, and it records 15,131 built by 31 March 2025, leaving 1,169 for the final year. At 11 years old, the plan has very nearly run its course, and the standard method has replaced its housing figure.

The City Vision Plan and Its Gap

The council's first replacement, the City Vision Local Plan, was approved for consultation as a "Draft Plan with Options" by cabinet on 18 October 2022. The cabinet report put the city's need at 26,500 homes from 2022 to 2040, including the 35% uplift, and found capacity for about 16,600 within the city, accepting an under supply to be addressed with the Partnership for South Hampshire. On those figures the draft left close to 10,000 homes without a place, our arithmetic rather than the council's.

A Fresh Start in June 2026

On 26 June 2026 the council began a new Southampton Local Plan under the new plan-making system, and its Gateway 1 self-assessment summary, published on 30 October 2026, records that the City Vision plan "was under the old plan-making system". The scoping consultation ran from 7 September to 11 October 2026 and drew around 365 responses, and a call for sites ran alongside it and received six submissions, which are now to be assessed for their suitability, availability and achievability. The summary notes strong local support for protecting existing open space, so a scheme on green land in the city starts at a disadvantage, and records that completing Gateway 1 starts the 30-month period in which the plan must be prepared and adopted.

Six submissions is a small response for a city of this size, so an owner who brings a sound site forward at the next stage will find few others alongside it.

Selling Land Beside the Solent Sites: Nitrogen and the Bird Payment

The council's nitrogen mitigation position statement names the Solent Maritime Special Area of Conservation, the Solent and Southampton Water Special Protection Area and Ramsar site, and the Solent and Dorset Coast Special Protection Area. It applies to any scheme that adds a home or a hotel room, including houses in multiple occupation and prior approvals, and the council's Solent mitigation page requires every new residential permission "across the city" to mitigate its effect on the bird areas as well.

Sources: Southampton City Council nitrogen mitigation position statement and Solent recreation mitigation page; Bird Aware Solent developer contributions.
RequirementHow it works in Southampton
Nitrogen neutralityThe extra nitrogen from a scheme, with a 20% precautionary buffer, must be offset. As the city has no farmland, credits come from schemes in the Test, Itchen or Bartley Water catchments. The council and housing associations can also count water efficiency retrofits in their own homes towards their own schemes, at 2.1 retrofitted homes for each new one.
TimingMitigation must be in place before anyone moves in, and the council uses Grampian conditions where needed to secure that. It must last for the life of the development, generally taken as 80 to 125 years.
Bird Aware SolentA payment per new home, for applications decided from 1 April 2026, of £501 for one bedroom, £723 for two, £942 for three, £1,108 for four and £1,299 for five or more, updated each year in line with the Retail Price Index.

The statement also shapes the homes themselves. The council conditions water use at 100 litres per person per day and works out a scheme's nitrogen from its bedrooms, assuming 1.41 people in a one-bedroom home and 4.09 in a home of five bedrooms or more, so smaller flats carry a lighter nitrogen bill than family houses on the same plot.

Neither payment rules a site out; both are known costs of building, met by the developer, and we allow for them in our appraisal before any price is agreed.

Routes That Suit a City of Yards, Flats and Student Halls

With no fields inside the boundary, every route here is an urban one:

  1. A direct application under S4. Yards, depots, garage courts and deep gardens with their own access are development within a settlement, where delivery at 30% gives the need for homes real weight.
  2. Higher density near the stations and the centre. Policy CS 5 sets densities from 35 to 50 homes per hectare where public transport is weakest to more than 100 where it is best, and 22% of the city's completions in 2024/25 were in the city centre.
  3. Student housing. The council counts student rooms towards its completions, a studio as one home and other rooms at 2.4 to one, so a suitable site can be planned for students as well as ordinary homes.
  4. A permission that lapsed. Land with an expired consent has already been through the council once, and the earlier work is a useful starting point.
  5. The next plan. Larger or more complex sites, and any that need an allocation, are best brought forward for the council's plan content consultation, with evidence prepared in advance.

Our page on brownfield and yards shows the land already in use that we take on, and the call for sites guide explains how a site enters a new plan.

If you own a yard, a workshop or a large garden in Southampton and want to sell, the route is usually a direct application under S4 now, with the new plan as the path for anything larger.

What the Timetable Means for Landowners in Southampton

The New Plan, Stage by Stage

The council's local plan timetable, last updated on 15 July 2026 and reviewed monthly, gives these stages after the first gateway.

Source: Southampton City Council, Local Plan timetable (last updated 15 July 2026).
StageDate in the council's timetable
Consultation on plan content and evidence1 March 2027 to 18 April 2027
Gateway two, advice from the Planning Inspectorate6 December 2027
Consultation on the proposed plan3 April 2028 to 4 June 2028
Gateway three31 July 2028
Submission for examination11 September 2028
Adoption21 March 2029

The self-assessment summary of 30 October 2026 said a summary of the scoping results would follow in November or December 2026, and the content consultation of March and April 2027 is the first stage at which the council sets out its choices about sites. Until a new plan is adopted, the Core Strategy remains the development plan, with its housing figure replaced by the standard method.

The Supply Statement and the Next Delivery Test

The council links its next supply statement to its land availability assessment and gives no date for either. The Housing Delivery Test 2025, published on 17 August 2026, covers April 2022 to March 2025; the next edition drops 2022/23 and adds 2025/26, the first year measured against the 1,208 home figure. That result is the government's to publish, and we do not predict it.

Southampton Stays a City Council for Now

Ministers withdrew their decisions on reorganising Hampshire on 7 September 2026 and began a review, confirming that the May 2027 elections would go ahead on existing boundaries. The city council remains the planning authority, preparing its plan for the city as it stands.

None of this calls for waiting on a site inside the city, where the S4 case and the delivery result are on the record already. Land just outside the boundary falls to Eastleigh, Test Valley or the New Forest, which our Hampshire page compares council by council.

Questions About Selling Land in Southampton

There are no fields in Southampton. Is my small yard in Northam really of interest?

Yes. Nearly every new home in the city is built on land already in use, and a yard is judged under policy S4. The usual questions are access, flood level, neighbours and the loss of the business use, and we look at those first.

Who pays the nitrogen credits and the Bird Aware Solent charge on land I sell?

They are costs of the development, not bills for you, and we allow for both in our appraisal before we agree a price. A family house carries a larger charge than a one-bedroom flat under each of them.

My planning permission for a few flats in Shirley expired. Is the site still worth selling?

Often it is. The council has considered the principle once, and much of the earlier survey work can be updated, though the nitrogen rules and other policies have moved on since. We check what has changed before any new application.

Should I have entered my site in the call for sites that closed in October 2026?

It would have helped a larger site, but it is not the only way in. The council's timetable of July 2026 sets a consultation on the plan's content for 1 March to 18 April 2027, and a site that works under today's policies can go straight to an application.

Is my land near the Test at Redbridge too close to the protected waters to build on?

Not necessarily. The bird payment and the nitrogen offset apply to new homes across the whole city, not only beside the water, so being near the estuary adds no extra charge. Land beside the rivers does need a flood check, and which part of your land is on dry ground, and how a safe access reaches it, usually decides the case.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Southampton Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Southampton stands on housing shapes which matter most here.

Selling Land in Southampton? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Hampshire

  • County overview

    Selling Land in Hampshire

    Sell land for development in Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 64% of need

    Selling Land in Test Valley

    Sell land for development in Test Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 94% of need

    Selling Land in Eastleigh

    Sell land for development in Eastleigh: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 60% of need

    Selling Land in Fareham

    Sell land for development in Fareham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 25% of need

    Selling Land in Gosport

    Sell land for development in Gosport: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 48% of need

    Selling Land in New Forest District

    Sell land in New Forest, near Totton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 94% of need

    Selling Land in Basingstoke and Deane

    Selling land in Basingstoke and Deane? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 79% of need

    Selling Land in East Hampshire

    Sell land for development in East Hampshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 80% of need

    Selling Land in Havant

    Sell land for development in Havant: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 137% of need

    Selling Land in Hart

    Sell land in Hart, near Fleet. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 176% of need

    Selling Land in Rushmoor

    Sell land for development in Rushmoor: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 174% of need

    Selling Land in Winchester

    Sell land for development in Winchester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 11% of need

    Selling Land in Portsmouth

    Sell land for development in Portsmouth: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.