The Forest of Dean builds more homes than the government's delivery test asks of it, yet the council's own monitoring finds only 1.93 years of housing land against the higher need set in December 2024. Its core strategy dates from 2012, and in June 2026 councillors withdrew the draft plan meant to replace it and started again on a plan to 2046.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Forest of Dean District and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Forest of Dean District can show 1.93 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from February 2012, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Forest of Dean District
- Fields of 2 acres or more on the edge of Lydney, Newent, Coleford or Cinderford.
- Land beside the major villages, such as Bream, Mitcheldean, Newnham on Severn or Tutshill and Sedbury, at a scale that suits them.
- Larger holdings around the four towns that could help shape the new plan to 2046.
- Former yards, depots and commercial sites within or beside a settlement.
- Land mostly in Flood Zone 1, clear of the Severn flood plain.
Land inside the Wye Valley National Landscape or the Crown Forest is harder, and we will say so plainly. For the rest, we pay for the surveys, the landscape and ecology work and the application, under an option whose price is fixed on signing, above the land's present worth. Farming carries on as normal meanwhile, and should permission not come, the land remains yours with nothing owed to us. Our farmland page explains what we look for in a holding.
Is Your Land in Forest of Dean District a Good Fit?
You do not need to know the planning rules to sell land for development in Forest of Dean District. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Forest of Dean District
There are three common ways to sell land with development potential in Forest of Dean District. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Forest of Dean District: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Forest of Dean District and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Forest of Dean District
Three things shape the chances of selling land for development in Forest of Dean District: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
128%
Meeting its housing requirement.
Five-year housing land supply
1.93 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 600 homes a year. Stated by Forest of Dean District Council in its Authority Monitoring Report 2024 to 2025, which gives a range of 1.81 to 1.93 years; its Housing Delivery Note for the same five years states a minimum of 2.2 years.
Checked sourceHomes built against homes needed
1,270
of 991 needed, April 2022 to March 2025
Most recent strategic plan adopted
February 2012
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
Draft Local Plan 2025 to 2045 set aside June 2026; Local Plan 2046 started 6 July 2026; the draft amended timetable of October 2026 (reviewed 1 October 2026) puts the scoping consultation at 14 January to 28 February 2027, Gateway 1 on 1 March 2027, submission on 2 January 2029 and adoption on 1 September 2029, for Full Council to agree on 22 October 2026
Checked source
See how Forest of Dean compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Four Towns Between the Severn and the Wye
Forest of Dean District Council, based in Coleford, covers about 526 square kilometres of west Gloucestershire and a population of close to 90,000. The district takes its name from the ancient woodland that covers much of it, and in the council's own words the Rivers Severn and Wye form much of the border of its southern part.
- Four towns. Cinderford, Coleford, Lydney and Newent, followed in the council's 2026 draft hierarchy by major villages such as Bream, Drybrook, Mitcheldean, Newnham on Severn and Tutshill and Sedbury.
- Over target on delivery. The Housing Delivery Test 2025 set the district a requirement of 991; it built 1,270, a result of 128%.
- Short of land. The council's monitoring report for 2024 to 2025 puts the five-year supply at 1.93 years from 1 April 2025, and says the housing policies of its Core Strategy are out of date as a result.
- Old plans. The Core Strategy was adopted in February 2012 and the Allocations Plan in June 2018, and the council has tested its supply against the government's standard method since June 2023, five years after the Allocations Plan.
- A plan started again. Full Council withdrew the draft Local Plan 2025 to 2045 on 30 June 2026, and work on a new plan to 2046 began that July.
Ahead on Delivery, Short on Land
The delivery test looks back over April 2022 to March 2025, and the 991 homes it asked of the district sit in line with the older need figure of about 330 a year. The five-year supply looks forward, and since the standard method changed in December 2024 it has been measured against about 600 homes a year, close to double. The council's Housing Delivery Note 2024 to 2025 sets out the sum for the five years from April 2025:
| Part of the calculation | Council's figure |
|---|---|
| Yearly need used | 600 homes, from the standard method as revised in December 2024 |
| Five years of need | 3,000 homes |
| Buffer | 5%, taking the five-year requirement to 3,150 homes |
| Deliverable homes counted | 1,253, described as the minimum available |
| Result stated in the note | A minimum of 2.2 years |
The note's own figures do not quite reach its headline. Worked through, 1,253 homes against 3,150 comes to just under two years, and an earlier paragraph of the same note counts 1,175 deliverable homes, which is less again. The monitoring report settles on 1.93 years, within a range it gives as starting from 1.81 years. On any of these readings the gap to five years is more than 1,800 homes, and the council accepts that it cannot show five years.
Building has also slowed. The note records 517 net completions in 2022/23, 431 in 2023/24 and 327 in 2024/25, when Lydney saw 89, Newent 61, Coleford 35 and Cinderford 28.
On the edge of Lydney and Newent, where most of last year's homes were built, that slowdown means the existing sites are not closing the gap on their own, which is where well placed new land comes in.
What the Shortfall Means for a Field
Policy S5 of the August 2026 framework allows homes beyond a settlement's boundary where unmet need is evidenced, and a five-year supply shortfall is one recognised way of evidencing it. It is not an automatic pass. The land has to sit well against the town or village beside it, and roads, schools and drainage must be able to take the homes. Inside settlement boundaries, policy S4 leans towards approval unless the harm would substantially outweigh the benefits.
The monitoring report, written under the previous framework, is candid about the effect: with the balance tilted towards approval, it says, this "can lead (and has led)" to homes in the open countryside.
Scale still matters. The 2026 draft expected large villages such as Blakeney, Longhope and St Briavels to take schemes of typically fewer than ten homes, and small villages such as Alvington and Aylburton typically one, two or three. That draft has gone, but a scheme far beyond those scales is hard to argue. Our page on paddocks and small sites covers the smaller end.
A Draft for 12,080 Homes, Withdrawn in June 2026
The version of the plan consulted on in summer 2024 ran to 2041. After the December 2024 changes, the revised draft plan, whose consultation ran from January to March 2026, covered 2025 to 2045 and a need of 12,080 homes, or 604 a year. It proposed:
| Location | What the withdrawn draft proposed |
|---|---|
| Lydney | About 1,800 homes, mainly east of the town with about 450 to the west |
| Newent | About 1,000 homes on mixed-use land adjoining the south east of the town |
| Coleford | About 700 homes, around 260 of them on existing sites |
| Cinderford | About 635 homes, including sites already allocated or permitted |
| Beachley Barracks | About 600 homes later in the plan period, noting that the army's decision to leave in 2032 might be reviewed |
| Two new communities | About 4,500 homes later in the plan period, at Glynchbrook in Redmarley parish and west of the Severn in Churcham parish |
| Villages | About 2,325 homes, around 18% of all allocations |
The consultation drew more than 3,600 responses. At Full Council on 30 June 2026, councillors voted to set the plan aside and start a new one under the government's gateway process. The council cited national timetabling constraints, residents' concerns and dated evidence.
What the Withdrawal Changes
All land now waits on a new plan, prepared under the local plan regulations that came into force in March 2026, which the council expects to adopt by late spring 2029. Until then the Core Strategy of 2012 and the 2018 Allocations Plan remain the development plan, with a supply short of five years. The council itself warned that without a current plan the district is more exposed to speculative schemes and appeal decisions.
Selling Land Near the Woodland, the Two Rivers or the Estuary
The Wye Valley National Landscape
The Wye Valley National Landscape partnership names Forest of Dean District Council as one of three councils whose planning policies take account of the need to conserve and enhance the area's natural beauty. The 2026 draft gave priority to conserving the landscape within the National Landscape and the Crown Forest areas. National policy allows major development inside the boundary only in exceptional circumstances.
The Estuary, the Bat Sites and the Wye
The council's habitats assessment, prepared for the 2026 draft, screens six protected sites, from the Severn Estuary and Walmore Common to the River Wye and the Wye Valley and Forest of Dean Bat Sites. It records that the district works with a 6.2 kilometre zone for judging homes that could add visitor pressure on the estuary. Under the council's interim bat guidance of July 2021, land near roosts falls into very sensitive, highly sensitive or sensitive locations, each with its own survey approach. The assessment also records concerns about nutrients in the Wye, especially phosphate. None of this rules a site out, but each calls for surveys, which are part of the planning cost we carry.
Flood Risk Along the Severn
The 2026 draft treated land at risk of flooding as unsuitable for almost all forms of development, with allowances for rising sea levels and more extreme floods. Along the Severn, the flood map is our first check. Our guide to flood risk and development land explains the tests.
When to Sell Land in the Forest of Dean, on the Road to a 2046 Plan
The council gave notice on 6 July 2026 that it had begun the Forest of Dean District Local Plan 2046 and published this local plan timetable:
| Stage | Timetable of 6 July 2026 | Draft amended timetable, October 2026 |
|---|---|---|
| Scoping consultation | 21 September to 12 October 2026, postponed | 14 January to 28 February 2027 |
| Gateway 1 self-assessment published | 6 November 2026 | 1 March 2027 |
| Consultation on plan content and evidence | 1 February to 15 March 2027 | 28 July to 8 September 2027 |
| Gateway 2 | 14 September 2027 | 11 January 2028 |
| Consultation on the proposed plan | 25 February to 22 April 2028 | 22 May to 17 July 2028 |
| Gateway 3 | 26 July 2028 | 2 November 2028 |
| Submission for examination | 6 September 2028 | 2 January 2029 |
| Adoption | 6 May 2029 | 1 September 2029 |
The scoping consultation did not start on 21 September 2026 as planned. The council's timetable page, reviewed on 1 October 2026, published a draft amended timetable that moves the scoping consultation to 14 January to 28 February 2027, Gateway 1 to 1 March 2027 and adoption to 1 September 2029; the page says the draft went to Cabinet on 8 October 2026 and is for Full Council to agree on 22 October 2026, with the next monthly review set for 6 November 2026, so every later date may still shift. The order will not: the consultation on content and evidence is where the council's thinking on locations will first show, and land with its evidence ready by then is best placed. Our local plan guide follows a site from submission to allocation.
Measured on the Older Need, and a Single Council on Hold
The Housing Delivery Test 2025, published on 17 August 2026, measured the district against the older, lower need, and at 128% none of its consequences applies. Under 95% the council would owe an action plan, under 85% its supply sum would carry a 20% buffer, and under 75% policy S5 would treat unmet need as evidenced even if supply recovered.
Reorganisation is paused. On 16 July 2026 the government decided on a single unitary council for Gloucestershire, replacing the county, city, borough and district councils from 1 April 2028. On 7 September it paused the Gloucestershire proposals as part of a national review, with the May 2027 polls to be fought on the present council map. For now the district council remains the planning authority and plan-maker.
Edge Land Now, Larger Holdings for Early 2027
- Land on a town or village edge that meets the S5 tests can be looked at now, while supply is short and no new plan carries weight.
- Larger holdings around Lydney, Newent, Coleford or Cinderford belong in the new plan, with evidence ready for the consultation on content in early 2027.
- Land near Beachley or the two sites once proposed for new communities is a longer game that depends on what the new plan chooses.
Questions About Selling Land in Forest of Dean District
The district built more homes than it had to. Why would the council approve more?
Because the delivery test and the land supply measure different things. The test looks back at the older, lower need, while the supply looks ahead at about 600 homes a year, and on that measure the council's monitoring report finds 1.93 years. National policy treats that shortfall as evidence of unmet need.
A field near Newent was proposed in the draft plan. Does that still count for anything?
No. The proposed allocations fell with the draft when councillors withdrew it in June 2026. It can be put forward to the new plan, and if it meets the S5 tests it may not need to wait.
The council withdrew its plan. Is that good or bad for my land?
It depends where the land is. Sites the draft chose have lost that support for now, while land it left out is no longer competing with a fixed list. Meanwhile supply is short and no new plan carries weight, which gives a well placed application room.
Can anything be built in the Wye Valley National Landscape?
Small, well designed schemes in or beside villages can be possible. Major development inside the boundary needs exceptional circumstances, so a large field there is rarely a strong case. We tell you which applies after our review.
Do the bat and estuary rules mean my land cannot be developed?
No. They mean surveys, and sometimes a contribution or a change of layout, depending on how close the land is to the protected sites. We commission and pay for that work as part of the planning.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Forest of Dean District Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Forest of Dean District stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Forest of Dean District? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Gloucestershire
County overview
Selling Land in Gloucestershire
Sell land in Gloucestershire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 85% of need
Selling Land in Stroud District
Sell land in Stroud, near Stonehouse. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 219% of need
Selling Land in Tewkesbury Borough
Sell land in Tewkesbury Borough. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 56% of need
Selling Land in Cheltenham
Sell land for development in Cheltenham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 68% of need
Selling Land in Cotswold District
Sell land for development in Cotswold: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 63% of need
Selling Land in Gloucester
Sell land for development in Gloucester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 138% of need
Selling Land in South Gloucestershire
Selling land in South Gloucestershire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Gloucestershire
- HerefordshireHerefordshire · 2.81 years of housing land
- Malvern HillsWorcestershire · 5.48 years of housing land
Sources
- Forest of Dean District Council: Annual Authorities Monitoring Report 2024 to 2025
- Forest of Dean District Council: Housing Delivery Note 2024 to 2025
- Forest of Dean District Council: Revised Draft Local Plan 2025 to 2045, Regulation 18 consultation version (February 2026)
- The Forester: Forest of Dean council adopts new gateway plan after revising local plan approach (July 2026)
- Forest of Dean District Council: Council revises local plan approach and agrees move to new Government gateway system (July 2026)
- Forest of Dean District Council: Forest of Dean District Local Plan 2046 (July 2026)
- Forest of Dean District Council: Local Plan 2046 timetable (July 2026, draft amended timetable October 2026)
- Forest of Dean District Council: Habitats Regulations Assessment of the Revised Draft Local Plan 2025 to 2045 (January 2026)
- Wye Valley National Landscape: Planning
- Tewkesbury Borough Council: Government announces decision on local government reorganisation in Gloucestershire (July 2026)
- Tewkesbury Borough Council: Government announcement on local government reorganisation (September 2026)
- Wikipedia: Forest of Dean District
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.