Skip to content

We pay for the planning.

Call us:020 3953 5635

Gloucestershire council area

Selling Land in Stroud District

Checked on

Stroud District is working from a plan adopted in November 2015, a review that has sat with inspectors since 2021, and a housing land supply well short of five years. The council has now started again, with a new plan that must find room for 846 homes a year between the Cotswold edge and the Severn.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Stroud District and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Stroud District can show 3.24 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from November 2015, more than five years ago.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Stroud District

  • Fields that sit well against the edge of Stonehouse, Cam, Dursley, Wotton-under-Edge, Berkeley or the larger villages.
  • Former mills, yards and workshops along the Stroud valleys.
  • Land on the Gloucester side of the district that relates properly to Hardwicke or Hunts Grove.
  • Larger holdings that could be put forward to the new plan through its call for sites.

Land on the high Cotswold plateau or the open estuary levels is not ruled out, but the route is narrower. We will tell you plainly what we think, and the first review costs you nothing. Our how it works page sets out each step.

Is Your Land in Stroud District a Good Fit?

You do not need to know the planning rules to sell land for development in Stroud District. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Stroud District

There are three common ways to sell land with development potential in Stroud District. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Stroud District: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Stroud District and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Stroud District

Three things shape the chances of selling land for development in Stroud District: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    85%

    Below 95%: the council must publish an action plan to improve delivery.

  • Five-year housing land supply

    3.24 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2024, measured against the standard method, blending 620 homes a year before December 2024 with 820 a year after it, plus a 5% buffer on the newer figure. Stated by Stroud District Council.

    Checked source
  • Homes built against homes needed

    1,633

    of 1,932 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    November 2015

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    No recent stage listed

    Check the council's website for its timetable.

See how Stroud compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Between the Cotswold Edge and the Severn, Short of Land

Stroud District Council covers the town of Stroud and the valleys around it, the smaller towns of Stonehouse, Nailsworth, Dursley, Wotton-under-Edge and Berkeley, Cam and Slimbridge in the vale, Sharpness on the estuary, and the edge of Gloucester at Hardwicke and Hunts Grove. When the council talks about where growth can go, it names two constraints first: floodplains and the Cotswolds National Landscape.

  • A plan now 10 years old. Because the November 2015 Local Plan is over five years old, housing land is measured against the government's standard method, not the plan's figure.
  • Short of land. The council's January 2025 update put its supply at 3.24 years, measured from 1 April 2024.
  • An action plan, not a crisis. The Housing Delivery Test 2025 gave Stroud 85%: under the 95% level that requires an action plan, but not under 75%.
  • A fresh start. The council must now plan for at least 846 homes a year, and held early engagement from 29 June to 9 August 2026.

The rest of this page explains which of these matters most for your land.

Selling Land in Stroud District: Why the Land Supply Counts for More Than the Delivery Score

At 85%, Stroud is clear of the 75% line that most commentary fixes on. That can make the district look closed to land outside its settlements. It is not, because national policy gives a second way to show unmet need.

The August 2026 NPPF, through its policy S5, lets homes beyond a settlement boundary be approved where unmet need is evidenced, the site relates well to the place beside it, and infrastructure can take the extra homes. A score below 75% is one way need is treated as proven. A shortfall in the five-year supply of deliverable sites is another, and it is the one that applies here.

How the Council's Own Figures Show the Gap

The January 2025 update set a five-year requirement of 4,144 homes, blending the older figure of 620 a year with the newer 820, plus a 5% buffer on the newer figure, and found 2,683 deliverable homes: 3.24 years.

The picture was very different not long ago. The council's November 2023 statement recorded 5.05 years of supply and a 2021 Housing Delivery Test result of 161%. Part of the change is arithmetic: the 2023 statement measured against 641 homes a year, the 2025 update against a blend rising to 820, and the council now quotes 846.

Around Stonehouse, Cam and Dursley, the reasons for the fall matter less to a landowner than its effect: the council's own figures now supply the evidence of unmet need that S5 asks for.

Land Inside the Towns and Villages

Policy S4 covers sites within settlements, where homes should be approved unless the harm would substantially outweigh what the scheme brings. Here that covers old mills and yards along the valleys as well as gardens and paddocks inside villages, and the council says it will look to brownfield land first. Our page on brownfield sites and yards explains how we assess them, and the wider policy change is set out in our guide to the 2026 NPPF.

The Review That Stalled at the M5

The last attempt at a new plan shows how the next one will be judged. The Local Plan Review was submitted in October 2021 and hearings began in March 2023. The inspectors then raised three soundness concerns: capacity at junctions 12 and 14 of the M5, public transport for the proposed development at Sharpness (site PS36), and a walking and cycling bridge over the M5 at Wisloe (site PS37).

The council asked for a pause and sent a joint action plan with its partners in November 2023. The council's June 2025 Local Development Scheme records that the inspectors wrote in February 2024 and again in April 2025 advising that the review should be withdrawn. In November 2025 they declined to consider fresh evidence from National Highways on the two junctions and repeated that withdrawal was the most appropriate way forward. The council leader said the council fundamentally disagreed.

Two Readings of Where the Review Now Stands

The council's April 2026 report says the submitted review remains under examination, while its planning pages now lead with the new plan and a 2026 call for sites. We have seen no document formally closing the review, but the council has plainly moved its effort to the new plan, and for a landowner the answer is the same either way. Decisions are made under the 2015 plan and national policy, and the sites that matter for the future are the ones put forward to the new plan.

The lesson is that very large schemes here can stand or fall on motorway capacity, and the April 2026 report says the junctions need early strategic consideration this time. Smaller sites that do not depend on new junction capacity largely avoid that question.

Where Stroud's Recent Homes Have Come From

Sites counted in the council's November 2023 supply statement, with the homes it expected each to deliver in the five years from April 2023.

SiteHomes countedWhat it tells a landowner
Land west of Stonehouse (Nastend Lane)544The largest single entry, on the western edge of Stonehouse.
Hunts Grove (Colethrop Farm) and its extension388 and 150Two of the larger entries sit on the Gloucester fringe at Hardwicke.
North east of Draycott, Cam264An allocation in the adopted plan on the edge of Cam.
Stanley Mills, Wimberley Mill and Dudbridge Industrial Estate146, 104 and 124Former mills and industrial land in the valleys.
Sharpness DocksNone in the five yearsAn allocation in the adopted plan that the council did not expect to deliver within that period.

Much of the supply rests on a few large sites, so slippage on one shows at once in the five-year figure.

For an owner of a smaller site, that dependence is part of the case, because homes that can be built without waiting on a large scheme add to the supply directly.

What Shapes a Sale of Land in Stroud District

A small number of issues decide most cases here, and we check each before giving you a view.

  • The Cotswolds National Landscape. The council lists it among the main limits on growth. Land within it faces a much higher bar, and land in its setting is judged partly on how it is seen from higher ground.
  • Floodplain. Many sites near the Severn and its tributaries can still work by keeping homes on the drier ground, as our flood risk guide explains.
  • Motorway and local roads. After the review, any sizeable scheme needs a clear answer on junctions 12 and 14.
  • Neighbourhood plans. The council's timetable lists plans in progress for Bisley-with-Lypiatt, Chalford, Standish and Wotton-under-Edge.
  • Contributions. The council's Community Infrastructure Levy schedule dates from 2017 and is being updated alongside the new plan, so the charges a scheme carries may change.

None of these costs fall on you. We pay for the surveys, highway work and applications, and the price we agree at the start already allows for the contributions.

Before Its First Gateway: When to Sell Land in Stroud District

The Housing Delivery Test is published yearly, and the Housing Delivery Test 2025, covering April 2022 to March 2025, was issued on 17 August 2026. Stroud's 85% puts it in the band that needs an action plan and nothing more. If the next result fell below 85%, a 20% buffer would be added to the five-year requirement, widening a supply gap that is already large. Under 75%, the score itself would count as proof of unmet need for S5 purposes. Reaching 95% would end the action plan, yet leave the supply gap untouched. We have not found a published 2025/26 completions figure, so we would not guess at the next result.

A January 2025 Supply Figure and a Plan for 2028

The January 2025 update, at 3.24 years, is the latest statement the council has published, and it does not say when the next is due. Any new one will be measured wholly against the higher annual figure, with none of the older 620 blended in. The council's own April 2026 report on the new plan warns that without an updated plan it is unlikely to maintain a five-year supply, so for well placed land outside the settlements the shortfall is likely to remain the main argument until the new plan is adopted.

The council's April 2026 report sets out the new plan under the government's 30 month process: the first gateway self-assessment by 31 October 2026, the Planning Inspectorate's second gateway check in early to mid 2027, an examination readiness check in late 2027, and submission, examination and adoption in 2028. The next public consultation is due in 2027. The June 2025 Local Development Scheme pointed to adoption in 2029, but it predates the council's decision to follow the faster national timetable, so the April 2026 dates are the ones to work to.

On 16 July 2026 the government chose a single unitary council, to be called Gloucestershire Council, with shadow elections on 6 May 2027 and the new council taking over on 1 April 2028. On 7 September 2026 the government indicated that reorganisation is being paused and reviewed, and the councils' joint website says the May 2027 elections will go ahead on existing boundaries meanwhile. The April 2026 report says reorganisation is no reason to delay the plan, as plan-making would pass to any new authority.

An Application Now, the New Plan for Larger Land

Two routes are open at once: an application for land that meets the S5 tests while supply is short, and the new plan for larger land during 2026 and 2027. Neither waits on reorganisation. Our note on how land gets into a local plan walks through each stage.

Questions About Selling Land in Stroud District

Stroud is above 75%. Does that mean my field outside the village has no chance?

No. The unmet need route in policy S5 can also rest on a shortfall in the five-year supply, and the council's last update put supply at 3.24 years. Your field still has to relate well to the village and pass the usual tests on access, flooding and landscape.

I put land forward to the old Local Plan Review. Do I need to do it again?

The council has run a fresh call for sites and published a map of the land submitted. If your land is not on it, we can prepare and submit the information for you.

Is being near junction 12 or 14 of the M5 a problem for my land?

Not necessarily. The concern at examination was the combined effect of the plan's large allocations. A modest site raises a much smaller question, though we still look at traffic carefully.

Will the new Gloucestershire council change what happens to my application?

In the short term, no. Stroud District Council decides applications until any new authority takes over, and the government is now reviewing the programme. The adopted plan and national policy carry on applying whatever happens.

Is an old mill building down in one of the valleys the kind of site you have in mind?

It can be. Former mills and industrial sites were counted on for hundreds of homes in the council's 2023 supply, and the council says it will look to brownfield land first. Heritage, flooding from the streams and access often decide how many homes fit, and we check each of those.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Stroud District Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Stroud District stands on housing shapes which matter most here.

Selling Land in Stroud District? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Gloucestershire

  • County overview

    Selling Land in Gloucestershire

    Sell land in Gloucestershire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 68% of need

    Selling Land in Cotswold District

    Sell land for development in Cotswold: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 63% of need

    Selling Land in Gloucester

    Sell land for development in Gloucester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 128% of need

    Selling Land in Forest of Dean District

    Sell land for development in Forest of Dean: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 219% of need

    Selling Land in Tewkesbury Borough

    Sell land in Tewkesbury Borough. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 138% of need

    Selling Land in South Gloucestershire

    Selling land in South Gloucestershire? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 56% of need

    Selling Land in Cheltenham

    Sell land for development in Cheltenham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.