Essex council area
Selling Land in Castle Point
Checked on
Castle Point scored 11% in the latest Housing Delivery Test, still relies on a local plan from 1998 and is now defending a new one before two inspectors. Its 45 square kilometres hold nearly 100,000 people, split between the mainland towns and Canvey Island.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Castle Point and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Castle Point built only 11% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 0.91 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Castle Point
- Fields and paddocks on the mainland that sit against existing homes in Benfleet, Thundersley or Hadleigh.
- Land within walking distance of Benfleet station.
- Yards, workshops and other previously developed land, on the mainland or on Canvey.
- Sites with a safe road access that does not rely on a single narrow lane.
- Land outside the functional floodplain, with room for drainage on site.
On a Castle Point site the costly early work is usually the flood risk assessment and, near the creeks, the bird and habitat surveys. We commission and pay for those, and for everything after them, under a price fixed at the start and set above what the land is worth to you today. Your land stays yours, and in your use, until permission is secured and we complete. If the council or an inspector says no, you owe us nothing. We also contribute to your own solicitor and land agent fees, so it costs you nothing to get the agreement done properly.
Is Your Land in Castle Point a Good Fit?
You do not need to know the planning rules to sell land for development in Castle Point. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Castle Point
There are three common ways to sell land with development potential in Castle Point. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Castle Point: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Castle Point and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Castle Point
Three things shape the chances of selling land for development in Castle Point: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
11%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
0.91 years
Short of five years: national policy treats this as evidence of unmet housing need. Stated by Castle Point Borough Council, which acknowledged it and agreed it with the appellant at the Daws Heath Road, Thundersley appeal (6007184, decided 14 September 2026).
Checked sourceHomes built against homes needed
119
of 1,052 needed, April 2022 to March 2025
Most recent strategic plan adopted
None listed
The plan currently used to decide applications.
New plan progress
Submitted for examination
As at January 2026.
See how Castle Point compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Selling Land in Castle Point: An Island, Three Towns and a 1998 Plan
Only three main road routes lead in and out of the borough. The council's Green Belt evidence lists the only areas outside the Green Belt as the urban areas of Canvey Island, Benfleet, Thundersley, Hadleigh and Daws Heath. Everything else, including the fields and marshes between them, is Green Belt.
- A delivery score of 11%. That is the council's result in the Housing Delivery Test 2025, far below the 75% line in national policy.
- An old plan and a new one at examination. The adopted local plan dates from 1998, which is also when the Green Belt boundary was last changed. The new Castle Point Plan, covering 2026 to 2043, was submitted on 31 January 2026.
- Just over half Green Belt. The council's own figure is 53% of the borough, about 2,500 hectares, excluding land beyond the sea defences.
- An island below the tide. Canvey sits about two metres below high tide level and relies on 14 miles (23km) of tidal defences.
- A c2c station at Benfleet. Benfleet is on the c2c line between London Fenchurch Street and Shoeburyness.
With so little open land outside the Green Belt, the examination now under way matters to anyone holding land here.
What the Examination Means for Selling Land in Castle Point
The council has taken what it calls a brownfield-first approach, focusing new homes on land already in urban use. The plan was published for consultation from 1 August to 26 September 2025 and submitted on 31 January 2026. Two inspectors, M Worden and C Carpenter, were appointed on 20 February.
The central issue is numbers. As reported by Planning Geek, the government's standard method gives a need of 11,662 homes for 2026 to 2043, while the plan provides for 6,196, about 53% of it and a shortfall of 5,466. The inspectors said they had significant concerns about soundness on housing requirement and supply, and held initial hearings on 8 to 10 September 2026 to explore them before going further.
You may see a slightly different shortfall quoted. When the plan was published in August 2025, the borough's MP, Dame Rebecca Harris, put it at approximately 5,446 homes, also 53% of the target. The gap of 20 homes most likely reflects supply figures refreshed between publication and examination; the council issued a Housing Position Update Note in July 2026. Either way the plan meets only about half of the need, and that is the gap the inspectors are testing.
- The question being tested. Whether the council has shown that meeting its full need would cause harm that significantly and demonstrably outweighs the benefits.
- What the plan does with the Green Belt. Its only proposed boundary changes remove two existing Traveller sites, at Janda Fields and Orchard Place, exclude the River Thames and add 11 hectares at the Canvey Wick SSSI. The plan makes no allocations in the Green Belt.
- Possible outcomes. The examination could continue on the council's approach, the council could be asked to find more land, or the plan could struggle to be found sound. None of these has been decided.
The council published its closing remarks, a sequential test note and an update on Green Belt sites with live planning applications straight after the September sessions, and the inspectors' view is still awaited. Where extra land would come from is already argued over. Dame Rebecca Harris objected that the plan puts over 3,300 homes on Canvey Island despite its flood risk, and pointed to land on the mainland, particularly around the Blinking Owl, as an alternative. For owners around Benfleet, Thundersley and Hadleigh, that debate is the one to watch. A site with its access, drainage and landscape evidence ready can be put in front of them quickly, and the call for sites and local plans guide describes how that is done while a plan is being examined.
Selling Land on Canvey Island, Where the Tide Comes First
Canvey Island is the first thing any planning officer in Castle Point thinks about. All of the island's more than 15,000 homes are at risk of tidal flooding, and they are protected by defences put in place after the 1953 flood. The Environment Agency looks after the sea defences and main rivers, and is working on the island's sea wall revetment as part of its long-term programme for the Thames estuary.
The island also floods from heavy rain, because its rainfall has to be carried away by a linked network of surface water sewers, open and culverted ditches, ponds and pumping stations. In August 2013 flash flooding affected about 50 properties around Maurice Avenue, and in July 2014, 100mm of rain fell in four hours and more than 200 properties were affected.
What That Means for a Site on Canvey
Because the whole island is at risk of tidal flooding, new homes there have to pass the sequential test, and usually the exception test as well. In practice, schemes on Canvey need a detailed flood risk assessment, a drainage design that does not add to the strain on the pumped network, and homes designed to stay safe if the defences were ever overtopped. Land classed as functional floodplain is treated as a strong reason to refuse.
Homes are still built on Canvey, but the flood case has to be settled before anything else is designed. How the sequential and exception tests work is set out in our flood risk guide; on Canvey both will almost always apply.
Selling Land on the Mainland: Benfleet, Thundersley and Hadleigh
Most of the borough's open land is on the mainland, and nearly all of it is Green Belt. Each part of it raises a different local question:
| Area | What shapes the planning case |
|---|---|
| Benfleet | Benfleet station and its c2c service. Land within walking distance of the station may fall under policy L3. |
| Thundersley and New Thundersley | Fields between the towns, where the role land plays in keeping settlements apart is often the deciding issue. |
| Hadleigh and Daws Heath | Hadleigh Country Park, an SSSI run by Essex County Council, and the 13th century Hadleigh Castle, with views over the Thames estuary. Heritage setting and landscape views matter here. |
| Edges of the built-up area | Paddocks, yards and small fields hemmed in by housing and roads, where the Green Belt contribution may be limited. |
With the built-up areas already so close together, the open land that remains mostly does one job: keeping them apart and holding the edge of the towns. A field doing that job strongly will not be grey belt. A paddock boxed in by houses on three sides, with no view across to a neighbouring town, may well be. The grey belt guide explains the purposes in full, and the Golden Rules a scheme must then meet.
The Daws Heath Road Appeal and the Supply
That test has now been applied on the mainland. On 14 September 2026 an inspector allowed up to 58 homes on land south of Daws Heath Road, Thundersley, half of them affordable. The decision treats the site as grey belt and the scheme as compliant with the Golden Rules, and it records the council's acknowledgement, agreed by both sides, that it could show only 0.91 years of housing land. The same decision gave the emerging plan very limited weight. With no up-to-date housing target, the council measures its supply against the government's standard method, which its planning FAQ puts at 686 homes a year, a five-year requirement of about 4,116 homes once the buffer is added. A shortfall that deep does not make every field grey belt, but it leaves no doubt that homes are needed, so a mainland site that passes the grey belt test starts with that weight behind it.
Estuary Wildlife and the Costs It Brings
The Benfleet and Southend Marshes Special Protection Area and Ramsar site lies within the borough, and the whole of Castle Point is inside its zone of influence. Every new home in the borough therefore pays towards the Essex Coast recreational disturbance strategy (RAMS). The charge rose to £476 per home from 1 August 2026, up from £175.55. Canvey Wick is a nature reserve and Site of Special Scientific Interest, and Hadleigh Country Park is also an SSSI.
These designations add cost and design work rather than stopping development on their own. A scheme near the marshes may also need a bird survey and buffers to sensitive land, on top of the payment per home. We commission and pay for that work, together with ecology, drainage, access and biodiversity net gain assessments, as part of preparing the planning case.
For an owner selling land near the Benfleet marshes or Canvey Wick, those surveys come early in the work, and they are a cost of preparing the case that never falls on you.
When to Sell Land in Castle Point, After the September Hearings
The next step in Castle Point is the inspectors' response to the September sessions, and each of the three outcomes described earlier carries its own timescale:
| If the inspectors | What it would mean for timing |
|---|---|
| let the examination carry on as submitted | Further hearings on the rest of the plan would follow, and adoption would still be some months away. |
| ask the council to find more homes | New sites would have to be identified, assessed and consulted on before hearings resume, which normally adds many months. This is the stage at which mainland land could come into the plan. |
| conclude the plan cannot be made sound | A fresh plan would be needed, and the 1998 plan and national policy would go on deciding applications for longer. |
The Housing Delivery Test is unlikely to change that picture in its next few editions. It is republished yearly but counts three years at a time, and a council at 11% is a very long way from the 75% line, so under policy S5 unmet need will go on being treated as evidenced. What the inspectors decide about supply matters far more than the next edition.
A Stepped Target Averaging 231 a Year After Adoption
The same FAQ explains that once the Castle Point Plan is adopted, its own stepped target replaces the standard method in the supply calculation, averaging 231 homes a year over the first ten years and 555 a year after that. Measured against the lower figure, the supply would look very different, so the weight a shortfall carries in an application today may not outlast adoption.
A Larger Council, Withdrawn
In March 2026 the government confirmed a South East Essex Council for Castle Point, Rochford and Southend-on-Sea, which was to take on planning and every other service in April 2028. On 7 September 2026 ministers withdrew that decision and opened a review. Castle Point Borough Council therefore stays the planning authority through the examination, and the May 2027 elections go ahead on today's council boundaries.
For owners of mainland fields, the weeks after the inspectors' letter are the ones to be ready for. On Canvey the flood tests apply whichever way the examination goes, so waiting brings no advantage there.
Questions About Selling Land in Castle Point
Castle Point is at 11%. Why is my Green Belt field not an easy win?
The shortfall route in national policy stops at the Green Belt boundary, and the submitted Castle Point Plan releases no Green Belt for general housing. So a mainland field has to be shown to be grey belt, or to have been built on before, unless the inspectors push the council to allocate more. In either case the 11% result is strong background evidence that homes are needed.
What happens if the inspectors decide the plan needs more homes?
Councils in that position are often asked to look for further sites. We cannot say how the Castle Point examination will end, but if more land is sought, sites with ready evidence on access, flooding and landscape are the ones that can be considered quickly.
Is land on Canvey Island worth looking at, given the flood risk?
It can be, particularly previously developed land. Flood risk is the first thing we test, and we will tell you plainly whether we think a scheme could pass the sequential and exception tests.
Is land next to Hadleigh Castle Country Park ruled out?
Not automatically. Views from the country park and the setting of the castle, which was begun around 1215, would shape any scheme, and on some land they may be decisive. We look at that early, before any money is spent on detailed design.
Who pays for the flood and ecology reports?
We do. Every survey, report and application fee is paid by us, including any appeal. You keep using your land while the work is done.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Castle Point Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Castle Point stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Castle Point? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Essex
County overview
Selling Land in Essex
Sell land for development in Essex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 23% of need
Selling Land in Basildon
Sell land for development in Basildon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 111% of need
Selling Land in Rochford District
Sell land in Rochford, near Rayleigh. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 20% of need
Selling Land in Southend-on-Sea
Sell land in Southend-on-Sea. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 66% of need
Selling Land in Epping Forest
Sell land for development in Epping Forest: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 150% of need
Selling Land in Braintree District
Sell land in Braintree, near Witham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 110% of need
Selling Land in Brentwood
Sell land for development in Brentwood: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 110% of need
Selling Land in Chelmsford
Sell land for development in Chelmsford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 109% of need
Selling Land in Colchester
Sell land for development in Colchester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 91% of need
Selling Land in Harlow
Sell land for development in Harlow: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 143% of need
Selling Land in Maldon District
Sell land in Maldon, near Heybridge. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 152% of need
Selling Land in Tendring
Sell land for development in Tendring: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 108% of need
Selling Land in Uttlesford
Sell land for development in Uttlesford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 29% of need
Selling Land in Thurrock
Sell land in Thurrock, near Grays. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- Castle Point Borough Council: Castle Point Plan latest news
- Castle Point Borough Council: Amendments to Green Belt boundaries topic paper, January 2026
- Castle Point Borough Council: Flood risks on Canvey Island
- Planning Geek: Castle Point Local Plan faces early examination test over housing shortfall
- Dame Rebecca Harris MP: New draft Local Plan
- Planning Inspectorate: Appeal decision 6007184, land south of Daws Heath Road, Thundersley (14 September 2026)
- Castle Point Borough Council: Castle Point Plan frequently asked questions (December 2025)
- Castle Point Borough Council: Recreational Disturbance Avoidance and Mitigation Strategy
- Explore Essex (Essex County Council): Hadleigh Country Park
- c2c: Our routes and stations
- UK Parliament: Written statement on local government reorganisation, including Greater Essex (March 2026)
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.