Essex council area
Selling Land in Brentwood
Checked on
Brentwood has one of the highest shares of Green Belt of any council in England, a plan adopted in March 2022 that left part of its housing need unmet, and a review of that plan under way. The council can show just over five years of housing land today, and the way that figure is measured changes as the plan ages.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Brentwood and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Brentwood can show 5.18 years of housing land, more than the five years national policy expects, and built 110% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from March 2022.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Brentwood
- Plots, large gardens and backland inside Brentwood, Shenfield, Hutton and Pilgrims Hatch.
- Yards, depots and former commercial land in the Green Belt with lawful buildings or hardstanding.
- Land within walking distance of Shenfield, Brentwood, Ingatestone or West Horndon station.
- Fields enclosed by existing homes, roads or the railway on the edge of Ingatestone, West Horndon or the main urban area.
- Larger holdings that could contribute to the growth the plan review has to find.
For land that belongs in the review, our work starts well before any application, with access, drainage, ecology, landscape and Green Belt evidence. We pay for all of it, under an option whose price is agreed on day one, above the land's current value. You keep using the land, and if permission is never secured you keep it and owe nothing. Our how it works page sets out the sequence.
Is Your Land in Brentwood a Good Fit?
You do not need to know the planning rules to sell land for development in Brentwood. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Brentwood
There are three common ways to sell land with development potential in Brentwood. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Brentwood: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Brentwood and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Brentwood
Three things shape the chances of selling land for development in Brentwood: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
110%
Meeting its housing requirement.
Five-year housing land supply
5.18 years
Five years or more of deliverable housing land. Position at 1 April 2025, measured against the adopted plan's requirement of 400 homes a year, plus 255 homes of past shortfall and a 5% buffer. Stated by Brentwood Borough Council.
Checked sourceHomes built against homes needed
1,107
of 1,002 needed, April 2022 to March 2025
Most recent strategic plan adopted
March 2022
The plan currently used to decide applications.
New plan progress
No recent stage listed
Check the council's website for its timetable.
See how Brentwood compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A Small Borough on the Elizabeth Line
Brentwood Borough Council covers the town of Brentwood with Shenfield, Hutton, Pilgrims Hatch, Warley and Brook Street, the larger villages of Ingatestone and West Horndon, and a rural north of smaller places such as Blackmore, Doddinghurst, Kelvedon Hatch and Mountnessing. It is compact, at around 153 square kilometres, and home to about 79,000 people.
- Four stations. Brentwood, Shenfield, Ingatestone and West Horndon, served between them by Elizabeth line, Greater Anglia and c2c trains, with the Elizabeth line calling at Brentwood and Shenfield.
- Green Belt almost everywhere. The adopted plan records 89% of the borough as Metropolitan Green Belt, which it describes as the sixth highest share in England.
- A plan that fell short on purpose. The Brentwood Local Plan 2016 to 2033 plans for 7,752 homes, and its own policy MG06 accepts that this is less than the borough's full assessed need.
- Delivery above target. The Housing Delivery Test 2025 measured 1,107 homes built over three years, set against 1,002 required, a result of 110%.
- Woodland and parkland. The plan counts 324 hectares of country park at South Weald and Thorndon, and Thames Chase Community Forest reaches across much of the south west.
Demand is not the question here. Almost every field between the settlements is protected, so what decides a site is which narrow route it fits.
Five Years of Supply, by 84 Homes
The council's latest five-year housing land supply statement, published in January 2026 with a base date of 1 April 2025, finds 5.18 years. The figures behind it are worth setting out, because the margin is slim:
| Part of the calculation | Council's figure |
|---|---|
| Yearly requirement used | 400 homes, the step in the adopted plan for the years to 2029/30 |
| Past shortfall | 409 homes since 2016, spread over the eight years left in the plan (the "Liverpool" approach the plan itself uses), adding 255 to these five years |
| Buffer | 5%, because the council passed the delivery test comfortably |
| Five-year requirement with buffer | 2,368 homes |
| Deliverable supply | 2,452 homes |
| Result | 5.18 years |
The statement uses 400 a year rather than the government's standard method because the plan was then less than five years old. It leaves out any sites that might come through the plan review, as their delivery is not yet established.
What a Supply Above Five Years Means for a Field
Policy S5 of the August 2026 framework, the route for homes beyond a settlement's limits where unmet need is evidenced, does not apply in the Green Belt, and the adopted plan records that all of the borough's countryside lies within it. So S5 has little reach in Brentwood whatever the numbers say. Grey belt is where the numbers bite. National policy only allows homes on grey belt land where the need for them is evidenced, and the usual ways of showing that are a delivery result below 75% or a supply short of five years. With a result of 110% and a supply above five years, neither applies here today. A grey belt case for housing is therefore hard to make at present, and for most fields it will wait on a change in the supply position or on the plan review.
If you are selling a field in Brentwood today, that is the plain position, and it is why previously developed land, sites inside the towns and the plan review, each covered below, are where most opportunities lie.
Selling Land in Brentwood Under the 2022 Plan's Stepped Target
The adopted plan does not ask for the same number of homes every year. It steps the requirement up as its large sites come on stream: 300 homes a year to 2023/24, 400 a year to 2029/30, and then 984 a year for the final three years to 2032/33. Most of the late growth depends on the strategic allocations the plan removed from the Green Belt:
- Dunton Hills Garden Village (policy R01), east of the A128 and south of the A127 near West Horndon.
- West Horndon Industrial Estate (policy R02), where the supply statement already counts homes in its five years.
- Land north of Shenfield (policy R03), close to Shenfield station.
Dunton Hills
The council's planning committee resolved in November 2023 to grant outline permission for up to 3,700 homes at Dunton Hills, with schools and a village centre, subject to conditions and a legal agreement. The terms went back to committee in July 2025, when the report set out 30% affordable housing from the start, with viability reviews at 1,000 and 2,300 occupied homes that could raise it to the plan's 35%. The January 2026 supply statement lists the application as pending a decision and counts 844 homes from the garden village in its five years, starting with 25 in 2025/26.
The Promise the Plan Made
Policy MG06 committed the council to a partial update of the plan, aimed at meeting its full assessed need, to start as soon as the plan was adopted and to be submitted for examination within 28 months. In September 2023 councillors agreed to take it forward with a stronger focus on climate change. The review has since moved onto the longer timetable described below, and it is where most new land in the borough will be decided.
For owners near West Horndon or north of Shenfield, the pace of these large sites matters more than it might seem, because it decides how comfortably the borough's supply holds up as the steps rise.
Ways to Sell Land in an 89% Green Belt Borough
The plan puts the main urban area of Brentwood, Shenfield, Hutton, Pilgrims Hatch, Warley and Brook Street at the top of its settlement order, then Ingatestone and West Horndon, then the smaller villages and hamlets. Where your land sits in that order goes a long way to deciding its route:
- Inside the main urban area. Plots within the built-up area are judged under policy S4, which leans towards approval and allows refusal only where the harm would substantially outweigh the benefits.
- Previously developed land in the Green Belt. Green Belt policy treats yards, depots, old commercial sites and plots carrying lawful buildings other than farm buildings differently from open fields, whatever the housing numbers say.
- Near the stations. Policy L3 favours denser homes within an easy walk of a station with a good service, and it can reach some Green Belt land. With Elizabeth line trains at Brentwood and Shenfield, the walk to the platform matters more here than in most of Essex.
- Through the plan review. Open fields that need a Green Belt boundary redrawn will, in most cases, come forward through the review rather than an application.
Our brownfield and yards page covers the second route, and the grey belt guide explains how Green Belt purposes are judged and the Golden Rules that follow.
Putting Land Forward in Brentwood's Plan Review
The council ran its call for sites from 18 December 2023 to 4 March 2024 and received 133 submissions, which it has published on an interactive map. It has said the submissions are evidence only, to be tested through its land availability assessment, and it keeps the online form open on a rolling basis, so land can still be put forward.
The council's Local Development Scheme, approved in February 2025, sets out the stages that follow:
| Stage | Council's timetable |
|---|---|
| Preferred options consultation (Regulation 18) | Second quarter of 2026 |
| Publication of the final plan (Regulation 19) | Second quarter of 2027 |
| Submission for examination | First quarter of 2028 |
| Examination | Second to fourth quarter of 2028 |
| Adoption | First quarter of 2029 |
The council's consultations page lists no preferred options consultation so far, although the scheme placed it in the second quarter of 2026, so the later dates may well be revised. The sequence matters more than the quarter: the first draft shows which sites the council favours, and a site's evidence does most good if it is ready before then. Each stage is explained in our guide to site submissions and local plan stages.
When to Sell Land in Brentwood, as Its Plan Turns Five
The most important date for Brentwood land in the coming year is five years after the plan's adoption in March 2022. After that point, national policy generally swaps the plan's requirement for the government's standard method when a council tests its supply. The 400-a-year step behind the current 5.18 years would stop being the yardstick. We would not predict the result, but the margin today is only 84 homes, and a statement below five years would give well placed land an evidenced need it lacks now.
A Result That Clears Every Threshold, and Mid Essex Withdrawn
The Housing Delivery Test 2025 was published on 17 August 2026, and the test is refreshed annually. At 110%, none of the test's consequences applies to Brentwood. A result below 95% would require an action plan, below 85% would add a 20% buffer to the supply calculation, and below 75% would mean unmet need is treated as evidenced under policy S5. The pace on Dunton Hills and the other strategic sites will feed straight into future results.
In March 2026 the government decided that Brentwood, Chelmsford and Maldon would form a Mid Essex Council, with elections in May 2027 and services transferring in April 2028. On 7 September 2026 it withdrew that decision after new legal advice and opened a review, and the May 2027 elections will be held on existing council boundaries. For now, the borough council remains the body preparing the plan review.
Yards and Station Land Now, Open Green Belt at Preferred Options
- Previously developed land, sites within the towns and land near the stations can be looked at now, as none of them depends on the housing numbers.
- Open Green Belt land is best prepared for the preferred options stage, with the call for sites form as the way in.
- Unsure which applies? Our free review answers that first.
Questions About Selling Land in Brentwood
The council has more than five years of supply. Is there any point asking about my field?
Yes, but the route differs. Without a shortfall, most open Green Belt land will come forward through the plan review rather than an application. Previously developed land, sites inside the towns and land near the stations are judged on other tests and can often be looked at now.
I put my land into the call for sites in 2024. Do I need to do anything else?
The submission keeps your land in view, but the council will judge it on evidence. Preparing that before the preferred options stage is the most useful step, and we pay for it where we take a site on.
Does the Elizabeth line help land near Shenfield station?
It can. National policy now favours denser homes within an easy walk of a well served station, including on some Green Belt land. The walk to the platform and the frequency of trains are what count.
Does Dunton Hills make it harder for other land to come forward?
It meets much of the growth in the 2022 plan, but that plan accepted the borough's full need was not met, which is why the review exists and must find more land.
I have an old yard near Kelvedon Hatch. Is that treated like a field?
Usually not. Land with lawful commercial buildings or hardstanding counts as previously developed and has its own route in Green Belt policy. Farm buildings do not count, so the site's planning record comes first, and we look at it piece by piece.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Brentwood Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in Brentwood, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in Brentwood? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Essex
County overview
Selling Land in Essex
Sell land for development in Essex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 23% of need
Selling Land in Basildon
Sell land for development in Basildon: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 66% of need
Selling Land in Epping Forest
Sell land for development in Epping Forest: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 110% of need
Selling Land in Chelmsford
Sell land for development in Chelmsford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 29% of need
Selling Land in Thurrock
Sell land in Thurrock, near Grays. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 11% of need
Selling Land in Castle Point
Sell land for development in Castle Point: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 150% of need
Selling Land in Braintree District
Sell land in Braintree, near Witham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 109% of need
Selling Land in Colchester
Sell land for development in Colchester: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 91% of need
Selling Land in Harlow
Sell land for development in Harlow: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 143% of need
Selling Land in Maldon District
Sell land in Maldon, near Heybridge. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 111% of need
Selling Land in Rochford District
Sell land in Rochford, near Rayleigh. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 152% of need
Selling Land in Tendring
Sell land for development in Tendring: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 108% of need
Selling Land in Uttlesford
Sell land for development in Uttlesford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 20% of need
Selling Land in Southend-on-Sea
Sell land in Southend-on-Sea. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Sources
- Brentwood Borough Council: Brentwood Local Plan 2016 to 2033 (adopted March 2022)
- Brentwood Borough Council: Five Year Housing Land Supply Statement as at 1 April 2025 (January 2026)
- Brentwood Borough Council: Local Development Scheme 2025 to 2029 (February 2025)
- Brentwood Borough Council: Call for Sites
- Brentwood Borough Council: Consultations
- Brentwood Borough Council: Planning Committee report, Dunton Hills Garden Village, 21/01525/OUT (July 2025)
- Brentwood Borough Council: Local Plan Review update, Finance, Assets, Investment and Recovery Committee (13 September 2023)
- UK Parliament: Written statement on local government reorganisation, HCWS1455 (March 2026)
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
- Wikipedia: Borough of Brentwood
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.