Kent council area
Selling Land in Thanet
Checked on
Thanet adopted a plan for more than 17,000 homes in 2020, yet it is delivering only 70% of what it needs. With no Green Belt and a new Local Plan just starting, the question for most land in the district is how well it relates to Margate, Ramsgate, Broadstairs and the villages.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Thanet and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Thanet built only 70% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 3.7 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from July 2020, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Thanet
- Fields on the edges of Margate, Ramsgate, Broadstairs, Westgate-on-Sea and Birchington that sit against existing homes.
- Land around Minster, Monkton, Cliffsend and St Nicholas-at-Wade on the drier ground.
- Sites of a few acres that could be built in one or two phases.
- Yards, depots and former commercial land inside or next to a settlement.
- Land within walking distance of Thanet Parkway or a town centre.
Land isolated in open farmland, well away from any settlement, is harder under S5, and we will tell you plainly if we think that applies to yours.
Is Your Land in Thanet a Good Fit?
You do not need to know the planning rules to sell land for development in Thanet. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Thanet
There are three common ways to sell land with development potential in Thanet. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Thanet: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Thanet and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Thanet
Three things shape the chances of selling land for development in Thanet: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
70%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
3.7 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 31 March 2025, measured against the standard method, 1,129 homes a year, plus a 20% buffer. Stated by Thanet District Council.
Checked sourceHomes built against homes needed
2,427
of 3,451 needed, April 2022 to March 2025
Most recent strategic plan adopted
July 2020
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
New plan started: scoping consultation 24 August to 9 October 2026
Checked source
See how Thanet compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Selling Land in Thanet: Margate, Ramsgate, Broadstairs and No Green Belt
Thanet District is home to Margate, Ramsgate and Broadstairs, with Westgate-on-Sea and Birchington along the north coast, and farming villages such as Minster, Monkton, St Nicholas-at-Wade and Manston inland. Thanet Parkway station opened at Cliffsend on 31 July 2023, with direct trains to London St Pancras by way of Ashford.
- Completions well short. Thanet scored 70% in the Housing Delivery Test 2025, and since 2015/16 it has averaged only around 504 new homes a year.
- A plan to 2031. The Thanet Local Plan was adopted on 9 July 2020, planning for 17,140 homes.
- A new plan just beginning. The council published its notice of intention on 12 June 2026 and opened a scoping consultation on 24 August, running to 9 October 2026.
- Few of the usual Kent constraints. KentOnline's review of Green Belt in the county found Thanet is one of six Kent districts with none, and Thanet is not among the councils with land in the Kent Downs National Landscape.
What Thanet does have is coastline protected for its birds, farmland that is predominantly Grade 1, and large allocations that have been slow to turn into homes. Each of these shapes where land can come forward.
Selling Land in Thanet, Where the Plan Has Sites but Not Enough Homes
The 2020 plan allocated large strategic sites, including around 2,000 homes at Westgate and further growth at Birchington, Minster, Margate and Westwood, as well as Manston Green and land at Nash and Haine Roads. Several are tied to road schemes named in the plan itself: the Westwood Relief Strategy, a developer-led scheme that includes a link between Margate Road and Westwood Road, and improvements to the A256 from Lord of the Manor, which developers pay towards in proportion.
At 70%, Thanet is under the 75% threshold, so policy S5 of the National Planning Policy Framework applies. It supports homes beyond a settlement boundary where a site sits well against a town or village and local roads, drainage and services have room for the extra homes, unless the harm would substantially outweigh the benefits. In a district with no Green Belt, that test reaches every farm edge from Birchington round to Cliffsend.
Why Smaller Sites Matter Here
Completions have picked up to around 800 a year over the last two years, but that is still well short of the 1,106 a year the government now expects of Thanet. Sites of a few acres on the edges of Minster, Monkton or Birchington that can be built in one or two phases, without waiting for a relief road, close that gap sooner. We back that argument with a realistic build programme showing how quickly homes on your land could follow a permission.
Short of Five Years, by the Council's Own Count
The plan passed its fifth anniversary in July 2025, so the yardstick for its supply is no longer the 2020 plan's requirement but the government's standard method. Its interim supply statement, updated in January 2026, finds 3.7 years of deliverable land at 31 March 2025:
| Step in the calculation | Council's figure |
|---|---|
| Yearly need, standard method | 1,129 homes, using affordability figures released in March 2025 |
| Five years of need | 5,645 homes |
| Buffer | 20%, adding 1,129 homes |
| Total to find | 6,774 homes |
| Deliverable supply counted | 5,017 homes |
The statement's yearly figure is higher than the 1,106 quoted when the new plan was launched. The statement names the March 2025 affordability data behind its number, and the standard method is rerun as new data appears, so the launch figure most likely comes from a later calculation. On either figure the shortfall runs well past a thousand homes. For a landowner, that means two separate measures point the same way: policy S5 treats a delivery result under 75% as showing unmet need, and a supply under five years is further evidence of it, to be weighed with the rest. The council's monitoring page still lists the January 2026 statement as its current one, so a position measured at March 2026 has yet to appear.
Putting Land Forward on the New Local Plan Timetable
Thanet is preparing its plan under the government's new plan-making system, and has published a full timetable to adoption.
| Stage | Date in the council's timetable |
|---|---|
| Scoping consultation | 24 August to 9 October 2026 |
| Gateway 1 | 30 October 2026 |
| Consultation on proposed content and evidence | 28 January to 12 March 2027 |
| Gateway 2 | 23 July 2027 |
| Consultation on the proposed Local Plan | 28 October to 24 December 2027 |
| Gateway 3 | 21 January 2028 |
| Submission for examination | 10 March 2028 |
| Examination | April 2028 to January 2029 |
| Adoption | February 2029 |
The scoping stage invited suggestions for development sites, and the next rounds will test them. Under the new system the first gateway is the council's own self-assessment and the later two are reviewed by the Planning Inspectorate, so sites that arrive with their access, drainage and ecology already worked out will stand up best at each check.
15,000 Homes, or More?
Local reporting of the launch describes a plan for around 15,000 homes over about 15 years, while quoting the government's minimum local housing need of 1,106 homes a year, which over 15 years comes to about 16,600. The two are best read together rather than as a contradiction. The most likely reading is that the 15,000 is a round figure from the very start of the process, before the plan period or the count of homes already permitted has been fixed. The 1,106 a year is the figure the plan will be tested against, and it is a minimum. For a landowner that means the real requirement is, if anything, higher than the headline.
Until adoption in February 2029, the 2020 plan and national policy decide applications, so we test every Thanet site against both. If the plan route suits your land, call for sites and local plans describes what putting land forward involves.
Selling Farmland in Thanet: Soil Quality, Flooding and Manston
The 2020 plan describes the countryside beyond the towns as predominantly Grade 1 agricultural land, with lower grade land only in small, isolated pockets that are often at high risk of flooding. When it was adopted, a councillor noted that more than 8,000 of its homes were on Grade 1 and 2 land around Westgate, Birchington, St Nicholas-at-Wade, Monkton and Minster. Farmland quality is weighed in every decision, but where almost all the land around the towns is top grade, it cannot rule out development on its own.
Flood risk sits in particular places. The plan says extensive areas to the south and west of the district carry high flood risk linked to former marshland and the old Wantsum Channel, and that the areas at risk are otherwise confined to the very edges of the coast. Away from those areas, the plan finds little flood risk. Our guide to flood risk and development land explains how the flood zones affect a site.
Manston
The former Manston airport site sits in the middle of the district. The 2020 plan safeguards it for airport related uses, following the development consent order for its reopening, and says its future use will be settled through an early review of the plan. Land nearby can be affected by the plans for the airport, including potential noise, and we check this carefully for any site in the area.
If you are thinking of selling farmland on the edge of Westgate, Birchington or St Nicholas-at-Wade, its Grade 1 status is something a scheme has to plan around rather than a reason to stop.
The Coastal Bird Tariff
The Thanet Coast and Sandwich Bay Special Protection Area is protected for its birds, and the council treats the whole district as within the area where new homes must help manage visitor pressure. Every scheme that adds homes, and hotels or holiday accommodation, pays towards the Strategic Access Management and Monitoring plan, secured through a section 106 unilateral undertaking.
| Home type | Contribution per home |
|---|---|
| 1 bedroom flat | £202 |
| 2 bedroom house or flat | £320 |
| 3 bedroom house | £424 |
| 4 or more bedroom house | £530 |
The council puts the average at around £350 per home, and the figures allow for funding the work in perpetuity. For small applications of one to nine homes it provides a template undertaking, and says it will be minded to refuse if a completed draft is not submitted within 28 days of the application being validated. We prepare and pay for this, along with the rest of the planning work.
Selling Land Inside Margate, Ramsgate and Broadstairs
Not every opportunity in Thanet is a field. The towns contain yards, garage courts, workshops and long rear gardens that can take new homes, and plots inside them come under policy S4, which starts from yes and needs substantial harm to justify a refusal.
The main questions on urban plots are access for vehicles, the privacy and light of neighbours, and heritage. The 2020 plan counts around 2,000 listed buildings and 27 conservation areas in the district, so a scheme in the historic centres needs a careful layout and design. A Cliftonville garage court or a Ramsgate workshop yard is the sort of plot covered on our yards and brownfield land page.
For an owner selling a plot inside one of the 27 conservation areas, that design work is where most of the effort goes, and we carry it at our cost.
When to Sell Land in Thanet: The Next Two Years
While Thanet sits at 70%, policy S5 takes unmet need as read. A fresh Housing Delivery Test arrives each year, and the one after the current edition would normally count the three years to March 2026. We would not try to call the result. If it reached 75%, need would stop being assumed and applications would lean on other evidence of it, such as the supply shortfall set out above. For a field on the edge of Minster, Birchington or Westgate, the case would be argued differently, not abandoned.
Why the Plan Is Moving Now
The council's May 2026 report launching the new plan gives two reasons for starting now. The development consent order for Manston airport is clear of legal challenge, and the new plan-making rules are largely in place. That matters around Manston, Minster and Monkton, because the 2020 plan left the airport's future to an early review. The same report points to a spatial development strategy for the whole of Kent, which will share out housing need across the county, and the council wants its own plan far enough on to take a view on it.
Reorganisation is now paused. The report also noted a proposed vesting date of 1 April 2028 for local government reorganisation. With submission due in March 2028 on the timetable above, that would have left the examination and adoption to a new council. Since then, on 7 September 2026, the government has paused reorganisation in Kent and Medway for a review, so Thanet District Council stays the planning authority and the May 2027 elections are for its current wards. The report says that in earlier reorganisations elsewhere, the existing councils usually carried on preparing their plans, the new authority adopted them, and a single combined plan followed later.
Sites Tested in Early 2027, Applications Alongside
In practice, sites put forward now and tested in early 2027 are the likeliest to reach examination, whichever council adopts the plan. Land that can go forward by application need not wait, and we can run both routes side by side at our cost.
Questions About Selling Land in Thanet
Thanet already has a plan. Why is it still at 70%?
The 2020 plan relies heavily on large strategic sites, several tied to road schemes such as the Westwood Relief Strategy, and completions have averaged about 504 a year since 2015/16. Having a plan in place does not stop the unmet need route in policy S5 applying, because that turns on the Housing Delivery Test result.
Does Grade 1 or Grade 2 farmland rule a site out?
No. The quality of farmland is a factor in the balance, not a bar, and the council's own plan put thousands of homes on high grade land. Location, access and how the site relates to the settlement usually matter more. Our page on farmland explains what we look for.
Should I wait for the new plan, which is not due until 2029?
Not necessarily. Well located land can come forward through an application now, and it can be put forward to the new plan at the same time. We will recommend the route that suits your land.
What is the bird tariff, and who pays it?
It is a contribution of a few hundred pounds per home towards managing visitor pressure on the protected coast. It is paid by the scheme, and when we take on the planning, we handle it along with every other cost of the application.
Do you buy land near Manston?
We look at it, but the airport plans can affect noise and future uses nearby, so we check the position carefully first.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Thanet Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Thanet stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 5 November 2026
Selling Land in Thanet? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Kent
County overview
Selling Land in Kent
Sell land for development in Kent: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 108% of need
Selling Land in Dover District
Sell land in Dover, near Deal. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 79% of need
Selling Land in Canterbury
Sell land for development in Canterbury: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 96% of need
Selling Land in Dartford
Sell land for development in Dartford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 57% of need
Selling Land in Folkestone and Hythe
Sell land in Folkestone and Hythe. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 61% of need
Selling Land in Gravesham
Sell land for development in Gravesham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 60% of need
Selling Land in Medway
Sell land in Medway, near Chatham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 25% of need
Selling Land in Sevenoaks
Sell land in Sevenoaks, near Swanley. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 70% of need
Selling Land in Swale
Sell land for development in Swale: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 63% of need
Selling Land in Tonbridge and Malling
Selling land in Tonbridge and Malling? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 75% of need
Selling Land in Ashford
Sell land in Ashford, near Tenterden. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 93% of need
Selling Land in Maidstone
Sell land in Maidstone, near Lenham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 93% of need
Selling Land in Tunbridge Wells
Sell land in Tunbridge Wells. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Sources
- Thanet District Council: Five Year Housing Land Supply interim position statement, accessible version (updated January 2026)
- Thanet District Council: Monitoring and evidence
- Thanet District Council: Local Plan timetable
- Thanet District Council: Thanet Local Plan, adopted July 2020
- Thanet District Council: Planning information and SAMM contributions
- The Isle of Thanet News: Council adopts new plan for development in Thanet up to 2031 (July 2020)
- The Isle of Thanet News: Your views wanted as council launches new Local Plan consultation (August 2026)
- Wikipedia: Thanet Parkway railway station
- KentOnline: Where is Kent's green belt and will it be built on? (January 2024)
- Kent Downs National Landscape: Management Plan 2021 to 2026
- Thanet District Council: Local Plan commencement and scoping consultation, report to Overview and Scrutiny Panel (May 2026)
- GOV.UK: Review of local government reorganisation launched (7 September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.