Skip to content

We pay for the planning.

Call us:020 3953 5635

Kent council area

Selling Land in Folkestone and Hythe

Checked on

Folkestone and Hythe has no Green Belt, a housing delivery result of 57% and a council that says its plan is short of small and medium sites. Between the Kent Downs, Romney Marsh and Otterpool Park, the land that can realistically come forward is limited, which is exactly why the right field on the right edge matters here.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in Folkestone and Hythe and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

Folkestone and Hythe built only 57% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 3.1 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from March 2022.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in Folkestone and Hythe

  • Fields on the edges of Hythe, Hawkinge, Folkestone and New Romney that sit against existing homes.
  • Land around the larger villages, such as Lyminge, Sellindge and Dymchurch, with a safe road access.
  • Sites mostly in Flood Zone 1, including the higher ground at the edges of the Marsh settlements.
  • Yards, depots, former commercial sites and other previously developed land inside or next to the towns.
  • Land within an easy walk of shops, schools or a station.

Land inside the Kent Downs or deep in the Marsh is not automatically ruled out, but we will say plainly if the constraints are likely to be too great.

Is Your Land in Folkestone and Hythe a Good Fit?

You do not need to know the planning rules to sell land for development in Folkestone and Hythe. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in Folkestone and Hythe

There are three common ways to sell land with development potential in Folkestone and Hythe. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in Folkestone and Hythe: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in Folkestone and Hythe and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in Folkestone and Hythe

Three things shape the chances of selling land for development in Folkestone and Hythe: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    57%

    Below 75%: treated as having evidenced unmet housing need under national policy S5.

  • Five-year housing land supply

    3.1 years

    Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2024, measured against the adopted Core Strategy Review requirement of 885 homes a year, plus a 626-home shortfall and a 20% buffer. Stated by Folkestone and Hythe District Council.

    Checked source
  • Homes built against homes needed

    1,120

    of 1,979 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    March 2022

    The plan currently used to decide applications.

  • New plan progress

    Latest step

    New plan started: scoping consultation 7 September to 16 October 2026, draft due 2027

    Checked source

See how Folkestone and Hythe compares with the other 187 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

Selling Land in Folkestone and Hythe: The Towns, the Downs and the Marsh

The inspectors who examined the Core Strategy Review described three areas: a continuous urban area joining Folkestone and Hythe through Sandgate and Seabrook; the North Downs, largely within the Kent Downs National Landscape and home to a number of smaller settlements; and Romney Marsh in the south and west, with New Romney, Lydd and the Dungeness peninsula.

  • No Green Belt at all. KentOnline's county-wide review names the Kent areas that have Green Belt, and Folkestone and Hythe is not among them.
  • Delivery well behind. In the Housing Delivery Test 2025 the council delivered 57% of the homes it needed over three years.
  • Very little unconstrained land. The council's own August 2025 Housing Delivery Action Plan says only about 4.1% of the district is potentially developable, and more than half of that is taken up by Otterpool Park.
  • A plan that is recent but thin on small sites. The Core Strategy Review was adopted in March 2022 and runs to 2037, alongside the Places and Policies Local Plan adopted in 2020.

The same action plan lists a lack of small and medium sized sites among the reasons homes are not being built fast enough. For a landowner with a few acres on a town or village edge, that admission matters.

What the 57% Result Opens Up for Landowners

The council's own figures explain the score. Between 2019/20 and 2023/24 the district completed 2,224 homes against a requirement of 3,110, and the adopted plan steps the annual target up to 885 homes from 2024/25, roughly double the recent average of around 440 a year. Dropping below 75% brings policy S5 of the National Planning Policy Framework into play, supporting homes beyond a settlement boundary where the field is physically well related to the town or village and local roads, schools and drainage can cope.

Nothing here is Green Belt, so no line on the map switches S5 off. The limits come from the Kent Downs, the Marsh and the Sellindge catchment instead, and the action plan reckons only around 2% of the district is potentially developable land that is not already allocated. Each field has to answer four questions:

  1. Is the land physically well related to a settlement? A field against the edge of Hythe, Hawkinge, Sellindge or New Romney starts far ahead of one alone in open country.
  2. Is it outside the Kent Downs? Land inside the National Landscape faces a much higher bar, and land near its edge is judged on views from the hills.
  3. Is it on the drier ground? On Romney Marsh especially, a site mostly in Flood Zone 1 is a very different proposition from one largely in Flood Zone 3.
  4. Does it drain to Sellindge? Land served by the Sellindge wastewater works must deal with nutrient neutrality.

For the exact wording of S4 and S5, see our guide to the 2026 changes to national planning policy.

Selling Land Near Otterpool Park

Otterpool Park is the new garden town planned around Westenhanger, with work expected to begin near the station. District councillors voted in April 2023 to grant outline planning permission for up to 8,500 homes, but KentOnline reported in May 2026 that formal sign-off still waited on the section 106 legal agreement.

The same report says the council owns 44% of the site and holds options over 46%, while Homes England, which has bought the remaining 10%, meets half of the immediate joint costs. Kent County Council has approved a wastewater treatment works, primary substation and wetlands for the scheme, and the council expects visible construction from 2028, starting with roads, utility cables and enabling works.

Why You Will See 5,600, 8,500 and 10,000 Homes

Three figures circulate for Otterpool, and they are not in conflict. The inspectors who examined the Core Strategy Review cut the homes expected within the plan period to about 5,600, having found 5,925 unrealistic; that is the allocation figure the council's action plan uses. Councillors resolved to grant outline permission for up to 8,500. The 10,000 is the wider ambition, in line with the inspectors' view that the site could eventually hold 8,000 to 10,000. For a landowner the first figure matters most: only around 5,600 Otterpool homes count towards needs to 2037, so the rest of the district must find homes meanwhile.

What It Means If You Own Land Nearby

New roads and schools can make nearby land better related to services. The council will also want land close to Otterpool to fit the garden town's plans rather than compete with them, so a site near Sellindge, Lympne or Westenhanger needs a clear story about how it relates to what is being built.

Nutrient Neutrality and the Sellindge Catchment

Stodmarsh is protected as a Special Protection Area, a Ramsar site, a Special Area of Conservation and a Site of Special Scientific Interest, and new homes that drain into the Stour catchments must show they will not add to nutrient pollution there. In Folkestone and Hythe the council says the effect is limited to the northern part of the district, and only to development served by the Sellindge wastewater treatment works.

So most of Folkestone, Hythe and Romney Marsh is outside the requirement, while land draining to the Sellindge works needs a nutrient solution before permission. The rules apply to any development that adds homes, and also to student accommodation, tourist accommodation and tourist attractions.

Nutrient neutrality is a cost and a piece of technical work, not a veto, met by credits or by wetland or other mitigation on a larger site. Sellindge itself shows it can be done: the action plan records that the first phase of the village's allocation has been resolved for approval and that 162 homes have been granted on the second.

For an owner selling land around Sellindge or elsewhere in the north of the district, the first question is which treatment works the homes would drain to, since that alone decides whether the requirement applies.

Selling Land on the Coast, the Marsh or the Downs

AreaWhat shapes a site
Folkestone, Sandgate and HytheThe action plan tracks large schemes under way: Folkestone seafront, with 84 homes complete and 318 more approved in detail, and the former Shorncliffe Garrison, with around 600 built. Smaller plots inside the towns are judged under policy S4.
The Kent Downs, including the Elham valley and the Lympne escarpmentThe inspectors found most of the North Downs part of the district lies within the National Landscape. Its Management Plan singles out the Lympne escarpment's dramatic views across Romney Marsh and Hythe Bay, and the Nailbourne in the Elham valley, which flows only in the wettest winters. Major development needs exceptional circumstances.
Romney Marsh, New Romney, Lydd and DymchurchThe inspectors described Romney Marsh and Walland Marsh as severely constrained by high flood risk, their open character and a limited transport network. The New Romney broad location is almost built out, with 91 more homes granted on Ashford Road in December 2024.
Sellindge, Lympne and WestenhangerOtterpool Park, which the inspectors noted adjoins the National Landscape to the south and east, and the Sellindge nutrient requirement.

On the Marsh the sequential and exception tests decide a great deal, and our flood risk guide takes each in turn.

Putting Land Forward for the Local Plan 2045

On 7 September 2026 the council announced that work had begun on a new plan, the Local Plan 2045, with a six week scoping consultation running until 4pm on Friday 16 October 2026. What it hears will shape the draft plan, and further consultation is expected in 2027.

Two calls for sites, the second closing on 24 April 2025, have fed the council's land availability assessment, which it expects to publish in September to October 2027. Its call for sites page now says it cannot assess new sites at this stage, though it keeps later submissions to review in due course, so the draft plan will start from land it already knows about.

  1. Autumn 2026. While scoping runs, we assess your land and tell you whether we think it has a case.
  2. Towards the draft plan. Where land is already in the assessment, we prepare the evidence the council asks for. Where it is not, we lodge it for later review and make its case at each consultation.
  3. In parallel. The council's latest monitoring report put its housing land supply at 3.1 years from 1 April 2024, measured against 885 homes a year plus the past shortfall and a 20% buffer, well short of the five years national policy expects. Where the case is strong, we can apply now rather than wait for the 2045 plan.

Our explainer on local plans and site submissions follows a site through every one of these stages.

When to Sell Land in Folkestone and Hythe: The Next Three Years

The government measures delivery once a year. The latest release, the Housing Delivery Test 2025, dates from 17 August 2026, and the next should add 2025/26. From 57%, one better year is very unlikely to lift a three year measure over 75%, so the S5 position above should hold for some time. Change is likelier to be gradual, as new completions and fresh allocations slowly weaken the case that the district is short of land. The monitoring report's 3.1 years is the latest supply figure the council has published, and as its monitoring reports come out each year, the next should show whether recent permissions have begun to close the gap.

Adoption in April 2029, and Mid Kent Paused

The council's timetable of 30 June 2026 runs well past the autumn 2026 scoping round.

WhenStage
October 2026Gateway 1, a self-check, after which the new system allows 30 months to finish.
September to October 2027Consultation on the proposed content of the plan.
February 2028Gateway 2, an assessment by a planning inspector.
May to June 2028Consultation on the proposed plan.
September 2028Gateway 3, deciding whether examination can follow.
October 2028Submission for examination.
April 2029Adoption.

Reorganisation is paused. In July 2026 ministers chose to join Folkestone and Hythe with Ashford and Swale in a Mid Kent unitary council, due to start delivering services from April 2028. The government's announcement of 7 September 2026 paused reorganisation in Kent, and the council confirms that the May 2027 elections will go ahead for its existing wards. If the merger resumes on those dates, the new council would inherit the 2045 plan before it reaches examination.

Ecology Surveys First, the Consultation in Autumn 2027

Aim at the autumn 2027 consultation, the first stage where the plan's content goes before the public. Ecology surveys near the Downs or the Marsh often need spring and summer visits, so work started in winter 2026/27 gives a full year of evidence by then. Nothing here guarantees an allocation, and any date can move.

Questions About Selling Land in Folkestone and Hythe

There is no Green Belt here. Does that make planning easier?

In one respect. At 57%, policy S5 can support land that sits well against Hythe, Hawkinge, New Romney or a larger village, with no Green Belt test to pass first. The Kent Downs, flood risk on the Marsh and the nutrient rules around Sellindge still have to be dealt with, and they decide many sites.

Will Otterpool Park stop the council needing other land?

Not on the evidence so far. Only around 5,600 of its homes count towards needs to 2037, and the council's own action plan points to a shortage of small and medium sites.

What does nutrient neutrality mean for land near Sellindge?

If the homes would drain to the Sellindge wastewater works, the application needs a nutrient solution, usually credits or on-site mitigation. It adds cost and technical work, which we carry out and pay for. It does not stop a good site.

Is land out on Romney Marsh worth asking about?

It depends on where it sits. Land on the drier edges of New Romney, Lydd, Dymchurch or St Mary's Bay can work, while land in the deepest flood zones rarely does. We check the flood maps and the council's evidence for your field before giving a view.

Should I put my land into the new Local Plan consultation myself?

There is no need to do it alone. If we agree terms, we put the land forward and prepare every document the council asks for, at our cost. See how it works.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in Folkestone and Hythe Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Folkestone and Hythe stands on housing shapes which matter most here.

Selling Land in Folkestone and Hythe? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Kent

  • County overview

    Selling Land in Kent

    Sell land for development in Kent: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 108% of need

    Selling Land in Dover District

    Sell land in Dover, near Deal. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 75% of need

    Selling Land in Ashford

    Sell land in Ashford, near Tenterden. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 79% of need

    Selling Land in Canterbury

    Sell land for development in Canterbury: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 96% of need

    Selling Land in Dartford

    Sell land for development in Dartford: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 61% of need

    Selling Land in Gravesham

    Sell land for development in Gravesham: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 60% of need

    Selling Land in Medway

    Sell land in Medway, near Chatham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 25% of need

    Selling Land in Sevenoaks

    Sell land in Sevenoaks, near Swanley. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 70% of need

    Selling Land in Swale

    Sell land for development in Swale: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Homes built: 70% of need

    Selling Land in Thanet

    Sell land in Thanet, near Margate. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 63% of need

    Selling Land in Tonbridge and Malling

    Selling land in Tonbridge and Malling? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 93% of need

    Selling Land in Maidstone

    Sell land in Maidstone, near Lenham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Homes built: 93% of need

    Selling Land in Tunbridge Wells

    Sell land in Tunbridge Wells. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Kent

  • RotherEast Sussex · 3.04 years of housing land