Skip to content

We pay for the planning.

Call us:020 3953 5635

Somerset council area

Selling Land in North Somerset

Checked on

North Somerset runs from Weston-super-Mare and the coastal levels to the Green Belt on the edge of Bristol. A delivery result of 64% brings the presumption in favour of sustainable development into play, the Core Strategy had its last policies adopted in January 2017, and a new Local Plan to 2041 went before three inspectors at hearings that opened on 10 November 2026.

  • We pay for the planning, at our own cost and risk
  • Your price is agreed up front, in writing
  • If planning is refused, you keep your land and owe nothing

In short

We buy land with development potential in North Somerset and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.

North Somerset built only 64% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from January 2017, and a new one was submitted for examination in May 2026.

We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.

The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.

The Land We Buy in North Somerset

  • Fields outside the Green Belt and Flood Zone 3 on the edge of Weston-super-Mare, Nailsea, Yatton, Congresbury or Banwell.
  • Green Belt land near Long Ashton, Pill, Portishead or the villages proposed for inset, where roads or existing homes already enclose it.
  • Brownfield land, yards and depots inside the towns, including land at tidal risk where the sequential case can be made.
  • Inherited or long-farmed land whose flood zone and bat band nobody has yet checked.

Where we take a site on, we pay for the flood risk assessment, bat surveys, drainage, transport and Green Belt work under an option whose price is fixed at the outset, while you carry on using the land. Our brownfield land and yards page covers depots and workshops in the towns.

Is Your Land in North Somerset a Good Fit?

You do not need to know the planning rules to sell land for development in North Somerset. These are the things that make a site a strong candidate:

  • It sits next to, or is well related to, an existing town or village.
  • A safe access onto a public road is possible, even if it needs work.
  • Most of the land is outside the highest flood risk zone.
  • It is not covered by a strong designation such as a Site of Special Scientific Interest.
  • It is about 2 acres or more, or part of a larger holding.
  • Everyone who owns it is willing to consider one clear, agreed price.

If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.

Ways to Sell Your Land in North Somerset

There are three common ways to sell land with development potential in North Somerset. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.

  • An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
  • A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
  • An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.

Selling Land in North Somerset: From First Call to Completion

Selling land for development under an option agreement follows the same steps wherever your land is.

  1. A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
  2. A free desktop review. Within a few days we look at your land, the planning position in North Somerset and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
  3. Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
  4. The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
  5. Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.

How selling land for development works, step by step gives the detail of each stage and how long it usually takes.

What the Local Plan Means If You Are Selling Land in North Somerset

Three things shape the chances of selling land for development in North Somerset: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.

  • Housing Delivery Test 2025

    64%

    Below 75%: treated as having evidenced unmet housing need under national policy S5.

  • Five-year housing land supply

    5.05 years

    Five years or more of deliverable housing land. Position at 1 April 2026, measured against the standard method, 1,580 homes a year, plus a 5% buffer. Stated by North Somerset Council, for the Local Plan 2041 examination; the figure counts 2,593 homes on sites the new plan proposes to allocate, and the council says it will not be relied on for decisions on planning applications.

    Checked source
  • Homes built against homes needed

    2,598

    of 4,063 needed, April 2022 to March 2025

  • Most recent strategic plan adopted

    January 2017

    More than five years old, so its housing figures are usually replaced by the government's standard method.

  • New plan progress

    Latest step

    The Local Plan 2041 was submitted on 22 May 2026; hearings opened on 10 November 2026, with hearing weeks set to run to 7 December 2026 and a reserve week from 18 January 2027

    Checked source

See how North Somerset compares with the other 221 councils we cover

Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.

The planning detail in full

From Weston-Super-Mare to the Edge of Bristol

North Somerset Council is a unitary council that writes the local plan and decides applications. Its new plan names four towns, Weston-super-Mare, Clevedon, Nailsea and Portishead, with Weston-super-Mare the principal location for new development. Between them lie larger villages such as Backwell, Yatton, Congresbury, Banwell, Winscombe and Wrington, and on the Bristol side Long Ashton and Pill.

  • Green Belt on the Bristol side. The council's Green Belt paper of May 2026 puts the adopted Green Belt within North Somerset at 15,531 hectares. Long Ashton and Pill with Easton-in-Gordano are inset from it; Cleeve, Felton, Winford, Dundry and Flax Bourton sit inside it with settlement boundaries of their own.
  • Tidal flood risk. The council's flood evidence says the tidal zone covers much of the land throughout the M5 corridor and large parts of Weston-super-Mare, Clevedon and Portishead.
  • The Mendip Hills. The new plan names the Mendip Hills National Landscape, with the large areas at risk of flooding, as a limit on where growth can go.

If you are thinking of selling land in North Somerset, which of these applies to your field decides where a review of it begins.

A Five-Year Figure That Counts the Plan's Own Sites

The council's Residential Land Survey and Housing Land Supply Position Report, with a base date of 1 April 2026 and published with the examination papers in August 2026, finds 5.05 years for the five years to March 2031. It measures that against the standard method figure of 1,580 homes a year plus a 5% buffer, 8,295 homes over five years.

Source: North Somerset Council, Residential Land Survey and Housing Land Supply Position Report, April 2026.
Source of homesCouncil's figure
Large sites with full permission1,312
Large sites with outline permission829
Strategic sites with permission2,290
Allocations in the adopted plans not yet built347
Sites the Local Plan 2041 proposes to allocate2,593
Allowance for small windfall sites1,000
Total deliverable supply8,371 homes, or 5.05 years

The fifth row is the one to read. Those 2,593 homes sit on sites the new plan proposes but has not yet allocated, and the report says that, because the position relies on them, it will not be relied upon for the purposes of decision-making. The council does not publish a figure without them. On our own arithmetic, taking them out leaves 5,778 homes, about three and a half years against the report's yearly requirement of 1,659 homes. So the council is not relying on the 5.05 years figure when it decides planning applications, and the delivery result below 75% applies to them in any case.

The last figure recorded at appeal was lower. In December 2025 an inspector allowed 39 homes on a vacant police maintenance depot in Stuart Road, Weston-super-Mare, recording that the council's housing land supply sat at 2.79 years and that it could not demonstrate five years. That decision gives no base date for the figure, and it came before the April 2026 report.

The report also records net completions of 1,017 homes in 2021/22, 976 in 2022/23, 753 in 2023/24, 929 in 2024/25 and 794 in 2025/26, none of them close to the 1,580 a year now asked for. For a landowner thinking of selling land for development here, that gap between what is built and what is needed is why sites outside the current plan are taken seriously.

A Core Strategy That Ran to 2026, and the Presumption That Followed

The council's Core Strategy was adopted on 10 April 2012. After a High Court challenge, nine policies were sent back for examination: the housing policy, CS13, was adopted again in September 2015, and the remaining eight in January 2017. The Core Strategy aimed for a minimum of 20,985 new homes by 2026 and said the Green Belt boundaries would remain unchanged during the plan period.

As a plan more than five years old, its housing figure gives way under national policy to the government's standard method. The Housing Delivery Test 2025 counted 2,598 homes built over three years against 4,063 needed, a result of 64%. Below 95% the council must publish an action plan, below 85% a 20% buffer applies to its supply, and below 75% unmet need is treated as evidenced.

What the August 2026 Framework Allows

  1. Inside the towns and villages. Policy S4 applies to land within settlements: approval unless the harm would substantially outweigh the benefits. Yards, depots and garden land in Weston-super-Mare, Clevedon or Portishead start here.
  2. On the edge of a settlement, outside the Green Belt. Policy S5 is the route for homes on land well related to a town or village and served by the roads, schools and drains it needs, where unmet need is evidenced. With a result below 75%, that need is treated as evidenced across North Somerset.
  3. In the Green Belt. S5 does not apply. Grey belt has its own need test, which a result below 75% usually meets, and larger schemes must meet the Golden Rules.

So most owners selling land in North Somerset outside the Green Belt already have unmet need on their side, and what usually decides a field is the next test, flood risk.

Where the Local Plan 2041 Puts Its Homes

The pre-submission Local Plan 2041 of October 2025 sets a minimum of 23,700 homes for 2026 to 2041, the 1,580 a year of the standard method, and policy SP8 spreads 24,495 homes across the district:

Source: North Somerset Council, Local Plan 2041 pre-submission plan, policy SP8 (October 2025).
AreaHomes in policy SP8Share
Weston-super-Mare7,73032%
Nailsea and Backwell3,72815%
Woodspring, south west of Bristol3,50014%
Wolvershill, north of Banwell3,30014%
Villages and rural areas2,94812%
Portishead1,6017%
Pill and Easton-in-Gordano1,1004%
Clevedon5882%

The plan expects 1,118 homes from small sites across the villages and rural areas and 1,070 from small windfall sites in Weston-super-Mare, which is where a single plot usually fits.

Its 2025 land availability assessment drew on calls for sites in 2017, 2020 and 2024, considered 408 sites and set no minimum size. Land left out can come back later, as our call for sites guide describes.

Land on the Levels, Where Flood Risk Is Tested First

The council's flood risk evidence of May 2026 describes Weston-super-Mare as extensively subject to flood risk, as are Yatton and Kewstoke. Of 51 residential sites the plan proposes without permission, it found 44 affected by some source of flooding and 18 needing a full sequential assessment, chiefly for tidal risk. It found no reasonably available sites at lower risk to take their place.

The land availability assessment treats Flood Zone 3 as a hard constraint outside the main towns, where sites wholly at higher risk are generally not supported.

Rectory Farm and Stuart Road

In March 2025 an inspector granted outline permission for 190 homes at Rectory Farm (North), Yatton, on land in Flood Zone 3a, finding 12 sequentially preferable sites, but concluding that the wider sustainability benefits outweighed the flood risk. The council challenged it, and in June 2026 the High Court dismissed the challenge. The Stuart Road appeal in Weston-super-Mare also failed the sequential test and was allowed.

Both allowed appeals turned on a supply short of five years, homes that could be kept safe from flooding and benefits weighty enough to outweigh the failed sequential test. Our flood risk guide explains the two tests.

Bat Roosts and Their Sustenance Zones

Two greater horseshoe maternity roosts, at Brockley Hall Stables and at King's Wood and Urchin Wood, belong to the North Somerset and Mendip Bats Special Area of Conservation. The council's guidance on it was first adopted in January 2018, and the 2025 draft of its second version sets bands around the maternity roosts: band A to 5 kilometres, band B to 12 and band C to 14. Land in bands A and B usually needs a full season of bat surveys, and lost habitat must be replaced no further from the roost than the site itself. Within band A, which matches the juvenile sustenance zone, new building on greenfield land is permitted only where the council is satisfied that mitigation to the highest level will be provided.

For an owner on the moors around Yatton, Congresbury or Banwell, the order of the questions matters: flood zone first, then bat bands, then everything else. A field in Flood Zone 1 or 2 next to a village is in a far stronger position than the district's flood maps suggest at first glance.

Green Belt South and West of Bristol: Twelve Sites and Thirteen Villages

The new plan's policy SP7 says exceptional circumstances justify releasing Green Belt land, and the council's Green Belt background paper of May 2026 gives the reason: the first four steps of its search, from sites with permission and land in the towns to sites around the towns and villages outside the Green Belt, found room for 17,789 homes, insufficient to meet the need for 23,700, and Bristol, Bath and North East Somerset and Somerset Council have said they cannot take any of North Somerset's need.

  • Twelve housing sites proposed for release, amounting to over 6,600 homes, among them Woodspring (3,500), Land East of Backwell (889), Pill Green at Easton-in-Gordano (600) and Tower Farm at Portishead (400).
  • Thirteen villages proposed for inset: Abbots Leigh, Clapton-in-Gordano, Cleeve, Dundry, Felton, Failand, Flax Bourton, Leigh Woods, Portbury, Redhill, Tickenham, Weston-in-Gordano and Winford, each previously washed over by it.
  • A larger inset at Bristol Airport, taking around 159 hectares, including the runway, out of the Green Belt.

Once a village is drawn out of the Green Belt, land within its new boundary is judged under policy S4 as land inside a settlement, which matters most to owners of paddocks and small plots.

Grey Belt Before the Plan Is Adopted

The background paper defines grey belt as land that does not strongly contribute to any of three of the Green Belt purposes, and marks most candidate sites as potential grey belt, while noting that this does not by itself mean land should be released. A field enclosed by roads or housing near Long Ashton or Pill can be argued today; open land keeping Bristol apart from nearby villages is much harder. Our grey belt guide sets out how the purposes are judged.

Timing a Sale While the Inspectors Sit

The plan was submitted on 22 May 2026 and is before three inspectors. The examination page records hearings opening on 10 November 2026, with Green Belt heard on 11 November, and the inspectors' programme of November 2026 sets further hearing weeks beginning 16 and 30 November and 7 December 2026.

The council's Local Development Scheme of December 2025 had planned hearings for July 2026, the inspectors' report for October and adoption for December 2026; the hearings opened four months behind that scheme. Changes the inspectors require would normally go out to consultation as main modifications before adoption.

The Next Delivery Test and the Next Supply Report

The Housing Delivery Test 2025 was published on 17 August 2026, and a result of 64% carries every consequence, including the presumption, until a later edition says otherwise. The council's surveys take 1 April as their base date, so the next statement would normally measure from 1 April 2027. Once the new plan is adopted, its allocations would count towards the supply used for decisions, which is likely to change the position for land outside them.

Land Outside the Plan Now, Land Inside It With the Plan

  • Land outside the Green Belt and Flood Zone 3, and grey belt land, is best looked at now, while the presumption applies.
  • Land next to a proposed allocation or inset village is worth reviewing as the inspectors report, since the new boundaries settle what lies just outside.

Questions About Selling Land in North Somerset

The council says it has 5.05 years. Does that end the presumption in North Somerset?

No. That figure counts homes on sites the new plan only proposes, and the council says it will not be relied on for decisions. The presumption also follows from the delivery result of 64%.

My field near Yatton is in Flood Zone 3. Is it worth asking about?

It is the hardest case, but Rectory Farm, near Yatton itself, shows an appeal can succeed where the benefits are strong and the homes can be made safe. We check the flood zone first.

Flax Bourton is proposed to come out of the Green Belt. What does that mean for my paddock there?

If the inspectors accept the inset, land inside the new village boundary would be judged as land within a settlement under policy S4. Land just outside it stays in the Green Belt, where the grey belt test applies.

Is land within a few kilometres of the Brockley bat roost ruled out?

No, but it costs more to prepare: within 5 kilometres it needs a full season of surveys, and any lost habitat must be replaced no further from the roost than the site. We pay for that work on sites we take on.

My land went into the 2024 call for sites but is not among the proposed allocations. Can it still be sold for development?

It can. The council's published supply figure is not used for decisions and the delivery result is below 75%, so land outside the plan can be argued on its merits now, subject to flood risk and the Green Belt.

What price will you pay for my land?

We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.

When would I be paid?

You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.

More Questions Landowners Selling Land in North Somerset Ask

The same questions come up wherever land is put forward. Each is answered in full in our guides, and where North Somerset stands on housing shapes which matter most here.

Selling Land in North Somerset? Tell Us About It

It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.

  • We reply within 2 working days, by phone or email, whichever you prefer.
  • The desktop review is free and confidential, with no obligation.
  • If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
About your land

Type a few letters to find a council. Own land in more than one area? Give one here and tell us about the others below.

Not sure? Give your best guess.

Your details

We need a phone number or an email address, whichever you prefer.

We use your details only to reply about your land. We do not contact the council or anyone else about it without your agreement. See our privacy notice.

More in Somerset

  • County overview

    Selling Land in Somerset

    Sell land for development in Somerset: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Somerset council

    Selling Land in Somerset

    Sell land in Somerset, near Taunton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

  • Neighbouring council · Homes built: 92% of need

    Selling Land in Bath and North East Somerset

    Selling land in Bath and North East Somerset? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.

Neighbouring Councils Beyond Somerset

  • BristolBristol · 4.14 years of housing land

Sources

Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.