Somerset council area
Selling Land in Bath and North East Somerset
Checked on
Bath and North East Somerset still plans for housing through a Core Strategy adopted in July 2014, and its own interim statement finds only 2.5 years of housing land. A new Local Plan that would release Green Belt land at Keynsham, Saltford, Whitchurch, Hicks Gate and Peasedown St John ran its final consultation from 18 September to 30 October 2026, so owners around Bath, the Somer Valley and the Chew Valley are selling while the rules are rewritten.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Bath and North East Somerset and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Bath and North East Somerset can show 2.5 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from July 2014, and a new one was published for consultation in September 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Bath and North East Somerset
- Fields on the edges of Midsomer Norton, Radstock, Westfield and Paulton, in the Somer Valley beyond the Green Belt.
- Green Belt land around Keynsham, Saltford, Whitchurch and the Chew Valley villages that may be grey belt or sits beside a proposed release.
- Land next to the draft allocations at Hicks Gate, Keynsham, Saltford, Whitchurch, North Radstock and South Peasedown that could help with access or infrastructure.
- Plots, yards, garages and backland inside Bath, Keynsham and the Somer Valley towns.
- Farmland and inherited holdings of any size, including land in the National Landscapes where a smaller scheme may still fit.
We pay for the transport, ecology, heritage, landscape and Green Belt work a site here needs. The option fixes your price on day one, above the land's current value, and the field stays yours to farm or let until we complete; if permission is refused, it remains yours and nothing is owed. Our farmland page and how it works page set out each stage.
Is Your Land in Bath and North East Somerset a Good Fit?
You do not need to know the planning rules to sell land for development in Bath and North East Somerset. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Bath and North East Somerset
There are three common ways to sell land with development potential in Bath and North East Somerset. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Bath and North East Somerset: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Bath and North East Somerset and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Bath and North East Somerset
Three things shape the chances of selling land for development in Bath and North East Somerset: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
92%
Below 95%: the council must publish an action plan to improve delivery.
Five-year housing land supply
2.5 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against local housing need under the standard method, 1,489 homes a year. Stated by Bath and North East Somerset Council.
Checked sourceHomes built against homes needed
1,979
of 2,161 needed, April 2022 to March 2025
Most recent strategic plan adopted
July 2014
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The Draft Local Plan 2025 to 2043 was published for Regulation 19 consultation from 18 September to 30 October 2026; the council's Local Development Scheme (June 2026) puts submission in December 2026, hearings from May to July 2027 and adoption in February 2028
Checked source
See how Bath and North East Somerset compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A World Heritage City in Its Green Belt, With the Somer Valley Beyond
The council, a unitary authority since Avon was abolished on 1 April 1996, belongs to the West of England combined authority. It covers Bath, the towns of Keynsham, Midsomer Norton and Radstock, villages such as Saltford, Paulton, Peasedown St John, Westfield, Whitchurch and Batheaston, and the rural Chew Valley. The district covers about 352 square kilometres, and the draft Local Plan puts its population at around 195,000, with more than two thirds of its land in the Green Belt.
- A city inscribed whole. The Core Strategy calls Bath the only complete city in the UK inscribed as a World Heritage Site; the draft plan describes it as "double inscribed", as it is also one of the Great Spa Towns of Europe.
- Two National Landscapes. The Core Strategy, adopted on 10 July 2014, puts almost a third of the district in the Cotswolds and Mendip Hills, then Areas of Outstanding Natural Beauty and now National Landscapes.
- Protected bats and birds. The draft plan names two bat Special Areas of Conservation, Bath and Bradford-on-Avon, and North Somerset and Mendip, and the Chew Valley Lake Special Protection Area as sites development must be planned around.
If you are thinking of selling land in Bath and North East Somerset, the first thing a review settles is where the field sits on that map: in the Green Belt around Bath, Keynsham and the Chew Valley, inside a National Landscape, or in the Somer Valley, which the council's Green Belt evidence places "south beyond the Green Belt".
A Supply Short of Five Years, Against a Figure Twice the Old Plan's
The Core Strategy planned for about 13,000 homes between 2011 and 2029, roughly 722 a year. The council's monitoring report for 2024/25 explains that, because the strategy is more than five years old, the standard method now sets the requirement, and records the yearly figure rising from 722 to 1,501. As the method's inputs are refreshed, council documents give 1,489, 1,501 and 1,518 a year at different dates. The interim five-year supply statement, with a base date of 1 April 2025, sets out the result:
| Part of the calculation | Council's figure |
|---|---|
| Yearly need used | 1,489 homes, the standard method result after the December 2024 framework |
| Period tested | 1 April 2025 to 31 March 2030 |
| Deliverable supply | 3,908 homes |
| Result | 2.5 years |
The statement does not set out its buffer. On our own arithmetic, the result matches 1,489 homes a year plus a 5% buffer, about 7,817 homes over five years, or twice the 3,908 the council could identify. The council called it interim while it gathered fresh evidence on outline and allocated sites, and its monitoring page showed no later statement in November 2026.
Building Has Picked Up, From a Low Base
The monitoring report counts 623 homes completed in 2024/25, 143 of them affordable, and the council's housing supply topic paper records 772 in 2025/26. Both years fall well short of the yearly need the supply is measured against.
What the Shortfall Changes, and Where It Stops
For a field beyond a town or village edge, the August 2026 framework's policy S5 backs new homes where unmet need is evidenced, provided the site sits well against the settlement and roads, schools and drainage can cope. A gap of this size is evidence a decision maker weighs against any harm, never an automatic finding. Green Belt land falls outside S5 altogether. There a field must first count as grey belt, and the need for homes on it is normally shown by a supply below five years or a delivery score below 75%; major schemes then face the Golden Rules on affordable homes and infrastructure. On delivery, the Housing Delivery Test 2025 recorded 1,979 homes built against 2,161 needed, a result of 92%: below the 95% that requires an action plan, but not below the 85% that would add a 20% buffer.
Green Belt Fields: What the Releases and Grey Belt Mean for a Sale
The council's Green Belt exceptional circumstances topic paper counts some 24,750 hectares of Green Belt in the district and proposes to release around 537 hectares, about 2% of it. Without any Green Belt sites, it says, supply would drop to 13,178 homes, 48% of the government's figure, and Green Belt land within reach of Bath is where affordable housing needs are greatest.
- Strategic releases at Keynsham, Saltford, Whitchurch Village, Hicks Gate and Peasedown St John, for which the draft plan finds exceptional circumstances.
- Smaller releases at Bathford, Chew Stoke, Corston and Farmborough, and edge of Bath sites such as the Bath Equestrian Centre.
- Grey belt. The Stage 2 Green Belt assessment found 21 sites provisionally grey belt and 13 Green Belt, and the council confirms those it allocates as grey belt.
- Previously developed land. Among the Green Belt sites assessed, the topic paper finds only one previously developed, the Old Tennis Courts at Chew Magna.
The paper judges that sites on the edge of Bath, inside the World Heritage Site and its setting, generally serve Green Belt purposes more strongly than land further out. For a field the draft plan leaves in the Green Belt, the routes are a grey belt case or the examination, where an inspector tests whether the plan has found enough land; our grey belt guide explains how the purposes are judged.
Anyone selling Green Belt land here deals with a council that has accepted in writing an unmet need of around 5,000 homes, and that admission frames every further Green Belt case, at examination and after it.
The Draft Plan's Sites From Hicks Gate to North Radstock, and the Land Beside Them
The draft Local Plan covers 2025 to 2043 and sets a requirement of around 22,000 homes, which the council's executive summary describes as just over 80% of the standard method figure of 27,324. It shares them out as around 5,900 in Bath, 8,900 in the Bristol to Bath Corridor, 4,600 in the Somer Valley and 2,600 in the rural areas. The largest allocations:
| Site | Homes in the draft plan |
|---|---|
| Hicks Gate (policy 3.9) | Around 2,000 on the B&NES side |
| North Keynsham (policy 3.1) | Around 1,450 to 1,700 |
| East Whitchurch Village (policy 3.13) | Around 1,040 |
| West Saltford (policy 3.7) | Around 960 |
| South West Keynsham (policy 3.5) | Around 950 |
| North Radstock (policy 4.4) | Around 950 |
| South Peasedown (policy 4.1) | Around 860 |
| South-west Whitchurch Village (policy 3.14) | Around 700 |
| West Keynsham (policy 3.4) | Around 480 |
| South East Keynsham (policy 3.6) | Around 390 |
| South Saltford (policy 3.8) | Around 330 |
| Writhlington (policy 4.5) | Around 300 within the district, of about 1,020 on the whole site |
A Stepped Target, and the Cost of Shared Roads
Policy 1.2 steps the requirement: about 760 homes a year from 2025 to 2031/32, then about 1,518 a year to 2042/43, reflecting the time large sites need to gain permission. The Bristol to Bath chapter ties the Keynsham and Saltford sites together: each must contribute to the North Keynsham Strategic Access Link Road, school expansion and green infrastructure, and development will not be permitted unless "equalisation mechanisms" share those costs fairly. Transport work is focused on the A4 and A37 corridors. In the Somer Valley, the draft plan also allocates land next to Bath Business Park for 56,175 square metres of employment space, recording that the land meets the definition of grey belt.
If your land adjoins one of these allocations, its part in a scheme often lies in access, drainage or room for shared infrastructure, and the equalisation rule means a neighbouring field can matter to the whole site rather than only to itself.
Bath Itself: Plots Inside the City and the Edge Around It
Bath takes around 5,900 of the draft plan's homes, at sites such as Julian Road and Kingswood School playing fields, so the World Heritage Site adds a heritage test without stopping new homes. Inside a settlement the national test is policy S4: permission unless the harm would substantially outweigh the benefits, for garden land, yards, garages and backland in Bath, Keynsham, Midsomer Norton and Radstock alike.
- Whether the plot lies inside the built-up area of Bath or one of the towns, and so falls under S4.
- Whether it sits in the setting of the World Heritage Site, where the green edge of the city is judged most closely.
- Whether it falls within the Cotswolds or Mendip Hills National Landscape, where national policy sets a stricter test for major development.
Our page on brownfield sites and yards covers previously developed land, which national policy favours inside and outside the Green Belt.
For a family selling a walled garden, a mews garage or an old workshop in Bath, it is the heritage setting and that S4 balance, rather than the district's land supply, that settle whether a scheme can be taken forward.
What the Timetable Means for Landowners in Bath and North East Somerset
From the Final Consultation to Examination
The council's Draft Local Plan consultation ran from 18 September to 30 October 2026, the final stage for comments before examination, with a separate deadline of 20 November 2026 for its site assessment spreadsheet. The Local Development Scheme that took effect in June 2026 sets out the stages after that:
| Stage | Council's timetable |
|---|---|
| Submission to the Secretary of State | December 2026 |
| Examination hearings | May to July 2027 |
| Inspector's report | October to December 2027 |
| Adoption | February 2028 |
The scheme gives the reason for December: plans submitted before 31 December 2026 can be examined under the current system, and the council intends to meet that deadline. The consultation website's timeline page gives adoption as 2027, but it still describes a plan for 2022 to 2042, not the draft's 2025 to 2043, so we rely on the dated scheme; on neither timetable is the plan adopted before 2027.
The Window Before Adoption
The housing supply topic paper expects a five-year supply once the plan is adopted, measured then against its stepped requirement of 760 homes a year rather than the full government figure. Until then the Core Strategy governs. A supply statement with a later base date, and each year's Housing Delivery Test (the Housing Delivery Test 2025 was published on 17 August 2026), will show whether the position has moved. It takes none of Bristol's unmet need, leaving that to the West of England Spatial Development Strategy. For land that missed the allocations, our guide to calls for sites and local plan stages covers what an examination can and cannot change.
- Land in the Somer Valley and elsewhere outside the Green Belt can be looked at now under policy S5, while the supply is short and the old plan governs.
- Grey belt land can be considered now too, as the shortfall usually supplies the evidence of need its test asks for.
- Other Green Belt land is best prepared for the examination hearings, which the council's timetable puts in May to July 2027.
Questions About Selling Land in Bath and North East Somerset
My field near Midsomer Norton is not in the draft plan. Is there any point asking about it?
Yes. The council places the Somer Valley beyond the Green Belt, so policy S5 can apply there, and with the supply short a well placed field on a town edge can make its case through an application rather than waiting for the plan.
Our farm is next to the proposed Hicks Gate or North Keynsham allocation. Does that help?
It can. The draft plan expects the corridor sites to share the cost of the link road and schools, so land that offers access, drainage or space for it can matter to the allocated site.
I own land near Chew Magna. Does the Chew Valley Lake protection rule it out?
Not in itself. The draft plan asks that development avoid harm to the lake and the bat sites, which is a matter of evidence and design. The Green Belt and, where it applies, the Mendip Hills National Landscape are usually the larger questions.
Can anything be built in the setting of the World Heritage Site?
Some homes can, as the Bath Equestrian Centre allocation on the city edge shows, but the edge of Bath is judged closely for its effect on that setting. Plots inside the built-up area, judged under policy S4, are often the more realistic route.
I have inherited land near Peasedown St John. Should I wait for the new plan?
Not necessarily. The draft plan proposes Green Belt release at Peasedown St John; land that stays in the Green Belt may still be grey belt, and land outside it can be weighed under policy S5, with the current shortfall counting as evidence of need. Our guide to probate and selling land sets out what executors can agree before probate is granted and what has to wait.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Bath and North East Somerset Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Bath and North East Somerset stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Bath and North East Somerset? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Somerset
County overview
Selling Land in Somerset
Sell land for development in Somerset: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Somerset council
Selling Land in Somerset
Sell land in Somerset, near Taunton. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 64% of need
Selling Land in North Somerset
Sell land for development in North Somerset: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Somerset
- BristolBristol · 4.14 years of housing land
- South GloucestershireGloucestershire · 3.93 years of housing land
- WiltshireWiltshire · 2.8 years of housing land
Sources
- Bath and North East Somerset Council: Core Strategy (adopted July 2014)
- Bath and North East Somerset Council: Five Year Housing Land Supply Interim Statement, base date 1 April 2025 (May 2025)
- Bath and North East Somerset Council: Authorities Monitoring Report 2024/25 (December 2025)
- Bath and North East Somerset Council: Local Development Scheme 2025 to 2028 (June 2026)
- Bath and North East Somerset Council: Draft Local Plan Regulation 19 consultation (September 2026)
- Bath and North East Somerset Council: Draft Local Plan 2025 to 2043, Executive Summary (September 2026)
- Bath and North East Somerset Council: Draft Local Plan, Chapter 1, District-wide Strategy (September 2026)
- Bath and North East Somerset Council: Draft Local Plan, Chapter 3, Bristol to Bath Corridor (September 2026)
- Bath and North East Somerset Council: Draft Local Plan, Chapter 4, Somer Valley (September 2026)
- Bath and North East Somerset Council: Housing Supply Topic Paper, Draft Local Plan (September 2026)
- Bath and North East Somerset Council: Green Belt Exceptional Circumstances Topic Paper, Draft Local Plan (September 2026)
- Wikipedia: Bath and North East Somerset
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.