Lancashire council area
Selling Land in Wyre
Checked on
Wyre built 2,034 homes against the 859 it needed in the latest Housing Delivery Test, and its August 2026 monitoring report finds 8.36 years of housing land, so for most fields around Poulton-le-Fylde, Thornton-Cleveleys, Garstang and the Over Wyre villages the route to permission runs through the local plan. That plan is being restarted under the government's new system, and the yardstick behind the supply figure changes when the current plan turns five in January 2028.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Wyre and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Wyre can show 8.36 years of housing land, more than the five years national policy expects, and built 237% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from January 2023.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Wyre
- Fields in Flood Zone 1 on the edge of Poulton-le-Fylde, Thornton, Garstang or a rural service centre such as Great Eccleston, Hambleton, Catterall or Knott End.
- Land along the A6 between Garstang and Barton, where the 2024 paper tested a corridor focus.
- Larger holdings that could suit an urban extension or a new settlement, the fourth option in the 2024 paper.
- Yards, workshops and former commercial plots inside the towns, where policy S4 applies, and in Fleetwood, where the plan asks for no affordable homes.
- Small sites and paddocks next to the main rural settlements, and land suited to a rural exception scheme.
Land in the Green Belt, the National Landscape or Flood Zone 3 faces the hardest tests, and we will say so at the outset. If we take a site on, we fund the flood, ecology, highways and landscape reports under an option whose price is agreed first, and the land stays yours to farm until the sale completes. If you have inherited land here, our inherited land page explains how that works alongside probate.
Is Your Land in Wyre a Good Fit?
You do not need to know the planning rules to sell land for development in Wyre. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Wyre
There are three common ways to sell land with development potential in Wyre. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Wyre: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Wyre and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Wyre
Three things shape the chances of selling land for development in Wyre: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
237%
Meeting its housing requirement.
Five-year housing land supply
8.36 years
Five years or more of deliverable housing land. Position at 1 April 2026, measured against the adopted Local Plan requirement of 296 homes a year (the standard method figure set by the 2022 partial update), plus a 20% buffer. Stated by Wyre Council.
Checked sourceHomes built against homes needed
2,034
of 859 needed, April 2022 to March 2025
Most recent strategic plan adopted
January 2023
The plan currently used to decide applications.
New plan progress
Latest step
The Wyre Local Plan partial update was adopted on 26 January 2023. An Issues and Options consultation ran from 29 July to 10 September 2024; the Preferred Options stage planned for early 2026 is not going ahead, and the council will move to the new plan-making system after giving four months' notice
Checked source
See how Wyre compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Where Your Land Sits: The Peninsula, Over Wyre and the a6 Towns
Wyre covers three quite different areas along the River Wyre: the Fylde coast peninsula with its urban towns, the Over Wyre villages across the estuary such as Knott End, Preesall, Hambleton, Stalmine and Pilling, and the A6 towns to the east, Garstang with Catterall, Bowgreave, Barton and Bilsborrow.
The adopted plan ranks every settlement for growth:
| Tier in policy SP1 | Settlements |
|---|---|
| Urban towns | Fleetwood, Poulton-le-Fylde, Cleveleys, Thornton, Normoss |
| Key service centre | Garstang |
| Rural service centres | Knott End/Preesall, Great Eccleston, Hambleton, Catterall |
| Main rural settlements | Bilsborrow, Pilling, Barton, St Michaels, Bowgreave, Inskip, Stalmine, Forton, Preesall Hill, Scorton |
| Small rural settlements | Cabus, Churchtown/Kirkland, Hollins Lane, Calder Vale, Dolphinholme (Lower) |
If you are thinking of selling land in Wyre, start with which of the three parts your field sits in. The Green Belt lies on the peninsula, the plan's flood zones cover much of the northern coast and the land around the river, and the east of the borough takes in part of the Forest of Bowland, so each part starts from different constraints.
What a Long Land Supply Means When You Sell Land in Wyre
Delivery is strong, with a 237% result and 663 completions in 2023/24, 632 in 2024/25 and a provisional 604 in 2025/26.
The council's Housing Monitoring Report of August 2026, with a base date of 1 April 2026, works out the supply like this:
| Step | Council's figure |
|---|---|
| Requirement 2011/12 to 2018/19 | 479 homes a year |
| Requirement from 2019/20 to 2030/31 | 296 homes a year (the standard method figure) |
| Required and built since April 2011 | 5,904 required, 6,857 completed |
| Over provision since 2011 | 953 homes, shown in the table but not deducted |
| Five-year requirement, 2026/27 to 2030/31 | 1,480 homes (296 a year for five years) |
| With a 20% buffer | 1,776 homes, or 355 a year |
| Deliverable supply | 2,968 homes, including a windfall allowance of 100 in the last two years |
| Result | 8.36 years |
Since 1 July 2026 national policy has required a 20% buffer when deciding applications, though not when making plans, wherever a requirement adopted within five years was tested against a pre-December 2024 version of the framework and sits at four fifths or less of the standard method figure. Wyre's partial update was examined against the 2021 framework and adopted in January 2023, and the council's March 2025 summary of consultation responses gives the new standard method figure as 582 homes a year, so the plan's 296 is about half of it.
Beyond a settlement's edge, policy S5 of the August 2026 framework needs evidence of unmet need, a good relationship to the place and the roads, schools and drainage to serve it, and Wyre's figures give little of that evidence. Annex A also stops a higher standard method figure counting as unmet need in a plan's first five years, where Wyre can show five years of land and scores above 75% for delivery. Inside settlements, policy S4 approves unless the harm would substantially outweigh the benefits.
For an owner who wants to sell land for development in Wyre, the honest position is that the local plan is the main route for greenfield land, and sites inside the towns and villages can move sooner.
The 2019 Plan, Its 2022 Update and Where It Placed Homes
The Wyre Local Plan (2011 to 2031) was adopted in February 2019 with a requirement below full need, and the inspector who examined its update recorded that "the main justification for a lower requirement was highways capacity". The plan calls the A585 "a single-carriageway road" heavily congested at peak times.
Mark Dakeyne's report of 21 December 2022 accepted 296 homes a year from 2019, when the standard method entered national policy, and required a backdated 479 a year before that, for a total of 7,384 homes. He noted that the plan "does not propose deleting any allocations". The updated plan, adopted on 26 January 2023, replaced 20 policies and kept the 2019 allocations. The larger ones:
| Allocation | Place | Homes in the plan |
|---|---|---|
| SA3/3 Land West of Great Eccleston | Great Eccleston | 568 |
| SA1/5 Land at Garstang Road | Poulton-le-Fylde | 516 |
| SA1/2 Lambs Road/Raikes Road | Thornton | 400, of which 360 by 2031 |
| SA3/4 Forton extension | Forton | 310 |
| SA1/6 Land South of Blackpool Road | Poulton-le-Fylde | 300 |
| SA3/5 Land West of the A6 (Nateby Crossing) | Garstang | 270 |
| SA1/14 West of Cockerham Road | Garstang | 260 |
The council's monitoring report for 2024/25, published in February 2026, records the A585 Skippool to Windy Harbour bypass as complete, on the road the plan named as congested, and counts 14 sites on the council's brownfield land register.
Policy HP3, for schemes of 10 homes or more, asks for none in Fleetwood; 10% on brownfield and 30% on greenfield land in Thornton, Cleveleys, Knott End/Preesall, Preesall Hill, Stalmine and Pilling; and 30% on either in Poulton-le-Fylde, Garstang, Hambleton, Great Eccleston, Catterall and the other listed settlements.
When you come to sell land in Wyre, that policy is one reason a brownfield yard in Thornton and one in Poulton-le-Fylde carry quite different costs before a single home is designed.
Selling Land Near the Green Belt, Bowland or Morecambe Bay
The adopted plan put the Green Belt at 750 hectares in September 2017, in two areas on the peninsula: between Fleetwood, Thornton and Cleveleys, and between Poulton-le-Fylde, Thornton, Cleveleys and Blackpool. The 2024 Issues and Options paper gives 684.7 hectares as of August 2023. Policy SP3 refuses inappropriate development as national policy defines it, and the same paper says: "We propose to not review the Green Belt as there are no exceptional circumstance to justify a Green Belt review."
Policy S5 does not apply in the Green Belt. Grey belt land, Green Belt land that contributes little to its purposes, is open to housing only where need is evidenced, usually by a supply short of five years or a Housing Delivery Test result below 75%, and larger schemes then meet the Golden Rules. Neither test is met in Wyre today, so for most fields between Poulton and Blackpool a grey belt case for housing will wait on a change in the supply position. Our grey belt guide explains the purposes.
The Forest of Bowland and Morecambe Bay
Part of the Forest of Bowland National Landscape lies in the east of the borough. Policy SP5 says its landscape and scenic beauty "will be protected from any development" that would harm it, and that major developments will not be permitted there except in exceptional circumstances. To the north, the plan records Morecambe Bay as a Ramsar site, a Special Protection Area and a Special Area of Conservation as well as a Site of Special Scientific Interest, so a scheme that could affect it may need assessment under the Habitats Regulations.
Outside settlement boundaries, policy HP4 allows a rural exception site only where all the homes are affordable, and rules out isolated new homes in the countryside under it.
Flood Zones and the Sale of Land Along the Coast and Estuary
The adopted plan places much of the northern coast and the land around the River Wyre in Flood Zones 2 and 3, with some settlements fully covered. The sequential test asks whether homes could go on land at lower risk first.
- Objections are common, refusals against advice are not. In 2024/25 the Environment Agency first objected to 19 applications on flood risk. Eleven were permitted after an acceptable flood risk assessment, and none was granted against the agency's advice.
- The coast is being strengthened. The Wyre Beach Management Scheme has over £40 million of government funding for works between the Blackpool boundary and the Marine Lakes at Fleetwood, reducing risk to over 11,000 properties, and the council's page gives March 2027 for finishing its second phase, provided all approvals are granted.
Our flood risk guide explains the sequential and exception tests. For anyone selling farm land to developers in Over Wyre or around Thornton, the flood map comes first: a field in Flood Zone 1 near a rural service centre is a very different proposition from one in Flood Zone 3.
Putting Land Forward as Wyre Restarts Its Plan
The council's timetable records scoping from 27 January to 10 March 2022 and Issues and Options from 29 July to 10 September 2024, which drew representations from 353 individuals and organisations on four ways to share out growth:
| Option in the 2024 paper | Responses in support |
|---|---|
| 1. Focus on the Fylde Coast peninsula main urban area | 110 |
| 2. Focus on the A6 corridor (Cabus, Garstang, Bowgreave, Catterall, Bilsborrow and Barton) | 45 |
| 3. Sustainable dispersal, including Great Eccleston, Hambleton and Knott End/Preesall | 20 |
| 4. A new settlement or urban extension | 17 |
| None of the options | 35 |
The paper identified 56 sites that could form part of the allocations. The council's call for sites page records a six-week call between January and March 2022 and further sites in 2023, says the sites have not been assessed, and says submissions carry no weight as a material planning consideration.
Why Preferred Options Did Not Go Ahead
The Local Development Scheme of February 2025 set a plan period of 2022 to 2040, scheduled Preferred Options for January to March 2026 and adoption for October to December 2027, and said the council could not meet the December 2026 deadline for old-system plans. Its page on the new-style plan now says Preferred Options will not go ahead and the plan will follow the new national system and its 30-month timetable, after at least four months' public notice, carrying much completed work forward.
Selling land through the plan in Wyre means being judged in that process. No site on the 2022 or 2023 map has yet been assessed, so the evidence behind every field there is still to be weighed.
Timing a Sale of Land in Wyre Before the Plan Turns Five
The Yardstick in January 2028
When the updated plan turns five on 26 January 2028, the standard method replaces its 296 homes a year as the measure of supply. On our own arithmetic, not the council's, the 2,968 homes in the August 2026 calculation set against the 582 a year the council quoted in March 2025, plus a 5% buffer, would come to roughly 4.9 years. It is an illustration only, since the supply is recounted every April and the standard method moves with its data, but it shows why the plan's age matters more here than delivery.
The Tests and Statements in Between
The Housing Delivery Test 2025 was published on 17 August 2026 and the test is repeated yearly; at 237%, a fall below 95%, 85% or 75% would take a very large change. The next Housing Monitoring Report would normally measure the supply from 1 April 2027.
For the new plan, four months' notice followed by a 30-month timetable means, on our reading, that it cannot be in place before the current one turns five. Our guide to the call for sites follows a site through each stage.
Reorganisation on the Fylde Coast
On 16 July 2026 the government chose a four-council proposal for Lancashire, placing Wyre with Blackpool and Fylde as the Fylde Coast. On 29 October 2026 it withdrew that decision along with those for eight other areas. Its letter keeps every option under consideration, promises each area an outcome early in 2027 and keeps the May 2027 elections for the existing councils. Wyre Council remains the planning authority meanwhile.
The months before January 2028 are the time to have land assessed and ready, to put forward at the new plan's first stage or take to an application if the supply position shifts.
Questions About Selling Land in Wyre
Wyre has more than five years of land. Is there any point selling land near Garstang now?
Yes, if the field is right. Garstang is the key service centre, the 2024 paper tested an A6 corridor focus, and a site prepared now can be put forward when the new plan starts. We pay for that work.
My field is in the Green Belt between Poulton and Blackpool. Could it be grey belt?
It could be assessed as grey belt, but housing there also needs evidence of unmet need, which a long supply and strong delivery do not give today, and the council proposes no Green Belt review.
I put land into the 2022 call for sites. Do I need to do it again?
The council says much completed work will carry forward, and its map shows the 2022 and 2023 submissions. None has been assessed yet, and its page on the new plan does not say whether a fresh call will be held, so keep your site's evidence up to date.
Does land in a flood zone near Hambleton or Pilling stand any chance?
It depends on the zone and on whether lower-risk land is available nearby. In 2024/25, 11 applications the Environment Agency first objected to were permitted after an acceptable flood risk assessment, so an objection need not end a site, though the sequential test still applies.
Will the new Fylde Coast council change how my land is judged?
Not for now. The July 2026 decision was withdrawn in October 2026, and Wyre Council still makes the plan and decides applications.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Wyre Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in Wyre, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 14 November 2026
Selling Land in Wyre? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Lancashire
County overview
Selling Land in Lancashire
Sell land for development in Lancashire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 175% of need
Selling Land in Fylde
Sell land for development in Fylde: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 48% of need
Selling Land in Lancaster
Sell land for development in Lancaster: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 460% of need
Selling Land in Preston
Sell land in Preston, near Fulwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 425% of need
Selling Land in Ribble Valley
Sell land for development in Ribble Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 156% of need
Selling Land in Blackpool
Sell land in Blackpool, near Bispham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 478% of need
Selling Land in Burnley
Sell land in Burnley, near Padiham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 63% of need
Selling Land in Chorley
Sell land for development in Chorley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 411% of need
Selling Land in Hyndburn
Sell land for development in Hyndburn: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 135% of need
Selling Land in Pendle
Sell land in Pendle, near Nelson. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 96% of need
Selling Land in Rossendale
Sell land for development in Rossendale: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 334% of need
Selling Land in South Ribble
Sell land for development in South Ribble: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 279% of need
Selling Land in West Lancashire
Sell land in West Lancashire. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 381% of need
Selling Land in Blackburn With Darwen
Selling land in Blackburn with Darwen? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- Wyre Council: Wyre Local Plan (2011 to 2031) incorporating partial update of 2022 (adopted January 2023)
- Planning Inspectorate: Report on the examination of the Wyre Local Plan partial update (December 2022)
- Wyre Council: Housing Monitoring Report, base date 1 April 2026 (August 2026)
- Wyre Council: Authorities Monitoring Report 2024 to 2025 (February 2026)
- Wyre Council: Local Development Scheme (February 2025)
- Wyre Council: Emerging new-style Local Plan (2026)
- Wyre Council: Wyre Local Plan Issues and Options (July 2024)
- Wyre Council: Issues and Options consultation, Main Matters (March 2025)
- Wyre Council: Previous call for sites
- Wyre Council: Wyre Beach Management Scheme
- GOV.UK: Local government reorganisation, withdrawn letter to 9 areas (October 2026)
- GOV.UK: Local government reorganisation, decision letter to Lancashire, Blackburn with Darwen and Blackpool council leaders (July 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.