West Lancashire built well ahead of its target in the latest Housing Delivery Test, with a result of 279%, yet council officers put its five-year housing land supply at only 1.34 years in June 2026, under a plan adopted in October 2013. For anyone thinking of selling land in Ormskirk, Skelmersdale, Burscough, Aughton, Tarleton or the villages, that thin supply, the Green Belt line and the quality of the farmland decide far more than the delivery figure does.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in West Lancashire and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
West Lancashire can show 1.34 years of housing land, short of the five years national policy expects. That shortfall is evidence of need which decisions must weigh, so a well placed field next to a town or village can make a case outside the local plan. It is not a guarantee. Land in the Green Belt faces stricter national tests. Its local plan dates from October 2013, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in West Lancashire
- Protected Land and other fields between the built-up edge and the Green Belt around Ormskirk, Aughton, Burscough, Skelmersdale, Up Holland, Tarleton or Hesketh Bank.
- Green Belt fields enclosed by homes, roads or the railway, where the grey belt test may now be met.
- Plots, backland, yards and former commercial sites inside the towns and villages.
- Farmland with a frontage to a road on the edge of a larger village such as Parbold, Banks or Rufford.
- Inherited land or family holdings where the owners want a single, clear route through planning.
Fields deep in the open mosses, close to Martin Mere or the estuary, or in the floodplain face the hardest tests, and we say so at the outset. For a site we take forward, we pay for the soil, ecology, flood, transport and Green Belt work under an option at a price agreed at the start, and you keep farming or using the land until completion. Our probate guide covers land held in an estate.
Is Your Land in West Lancashire a Good Fit?
You do not need to know the planning rules to sell land for development in West Lancashire. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in West Lancashire
There are three common ways to sell land with development potential in West Lancashire. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in West Lancashire: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in West Lancashire and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in West Lancashire
Three things shape the chances of selling land for development in West Lancashire: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
279%
Meeting its housing requirement.
Five-year housing land supply
1.34 years
Short of five years: national policy treats this as evidence of unmet housing need. Stated by West Lancashire Borough Council officers, in the Planning Committee report of 4 June 2026 on application 2025/0565/FUL (Prescot Road, Aughton).
Checked sourceHomes built against homes needed
1,474
of 529 needed, April 2022 to March 2025
Most recent strategic plan adopted
October 2013
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The West Lancashire Local Plan 2012 to 2027 was adopted on 16 October 2013. Scope, Issues and Options for a Local Plan 2023 to 2040 were consulted on from November 2021 to January 2022; the timetable is under review, and a call for sites ran from 24 August to 2 November 2026
Checked source
See how West Lancashire compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Ormskirk, Skelmersdale and a Borough Wrapped in Green Belt
West Lancashire Borough Council covers about 347 square kilometres on the edge of Merseyside and Greater Manchester, south of the Ribble estuary, and had an estimated 121,995 residents in 2024. Ormskirk, home to Edge Hill University, and Skelmersdale, a former new town, are the largest settlements. Burscough, Up Holland and Tarleton follow, among 21 civil parishes. The west is a low-lying belt of mossland, part of the Lancashire Plain, once largely covered by Martin Mere before it was drained for farming.
- Most of the borough is Green Belt. Lancashire County Council's Green Belt figures for 2025/26, drawn from the government's statistics, record 31,010 hectares in West Lancashire, covering 90% of the district and 44.5% of all the Green Belt in Lancashire's twelve districts.
- A reason the county gives. The same page says West Lancashire holds so much of the county's Green Belt owing to the large amount of top grade farmland.
- Protected wetlands. The council names Martin Mere and the southern part of the Ribble estuary within the borough, and the nearby Sefton Coast, as sites of European nature conservation importance.
- On the edge of Merseyside. The borough borders Merseyside to the south and west, Greater Manchester, Chorley and South Ribble to the east, and Fylde across the Ribble estuary to the north.
If you are weighing up whether to sell land in West Lancashire, the first question is nearly always where your field sits against the edge of a town or village, because outside that edge the land is very likely to be Green Belt, and inside it the rules are far kinder.
Building Ahead of Need, Yet Short of Deliverable Land
The Housing Delivery Test 2025 counted 1,474 homes completed in West Lancashire over three years, against 529 needed. That result of 279% puts the council well clear of every consequence the test carries, so delivery on its own adds no weight to new homes here. The land supply tells a different story, and it is the figure that matters more to a sale.
In January 2025 an inspector recorded that the council considered it could demonstrate a 2.49 year supply. The figures since come from different places:
| When | Figure | Who stated it |
|---|---|---|
| January 2025 | 2.49 years: a five-year requirement of 2,951 homes against a supply of 1,480 | The council, as recorded in the Boundary Lane, Hesketh Bank appeal decision |
| January 2026 | 2.49 years, described as the council's latest position | The inspector at the Red Cat Lane, Burscough appeal |
| June 2026 | 1.34 years | Council officers, in their Planning Committee report on land east of Prescot Road, Aughton |
The January 2025 numbers are worth a second look: 1,480 homes against a fifth of 2,951 works out at just over 2.5 years, a little above the 2.49 the inspector recorded, and the decision does not explain the gap. The appellant there put supply at no more than 2.5 years, so on either reading the borough held about half the land it needed.
None of these documents gives a base date, and we found no current supply statement on the council's website, so we use the newest figure from the council's own officers, set out in their report to the Planning Committee of 4 June 2026.
The two tests measure different things: delivery looks back at completions over three years, while supply looks forward at sites that can deliver in the next five, against a requirement the January 2025 figures put at 2,951 homes. The adopted plan is also 12 years old, and once a plan passes five years, the government's standard method takes the place of its housing figure when supply is tested.
For an owner selling land for development on the edge of Ormskirk, Burscough or Aughton, that shortfall, rather than the strong delivery figure, is what gives a field a case to put forward now.
Where the Shortfall Reaches: Settlement Edges, Protected Land and Grey Belt
National policy treats land in three positions differently, and in West Lancashire all three often lie within a few fields of each other:
- Inside a town or village. Plots, backland and yards within Ormskirk, Skelmersdale, Burscough or a village fall to policy S4 in the national framework of August 2026, and S4 expects approval unless the harm would substantially outweigh the benefits.
- Beyond the edge but outside the Green Belt. Under policy S5, homes can be supported where unmet need is evidenced, the field relates well to the settlement, and roads, schools and drainage can serve it. Falling short of five years counts towards showing that need, as evidence to weigh rather than a finding made automatically. In West Lancashire that includes the Protected Land described below, which the 2013 plan keeps between the built-up edge and the Green Belt.
- In the Green Belt. S5 does not apply. Grey belt land has its own need test, which a supply under five years or a delivery result under 75% usually satisfies, and the Golden Rules then apply to larger schemes. With the council's officers reporting 1.34 years, that need can usually be shown on the figures, though each site still turns on how strongly it serves the purposes of the Green Belt.
What Protected Land Means Here
Protected Land is a West Lancashire term. The inspector at Hesketh Bank described it as forming a buffer between the built-up area and the Green Belt, and quoted policy GN1 b) of the plan: development on it will only be permitted where it retains or enhances the rural character of the area. It is not Green Belt, but nor is it ready for housing, so a scheme there relies on the supply position to make its case.
For a field in the Green Belt, the shortfall opens the grey belt route but does not decide it, and our grey belt guide explains how the Green Belt purposes are judged. How the land reads against the town on the ground is what we test before we agree a price.
What Recent Decisions in Aughton, Burscough and Hesketh Bank Show
Three recent decisions show how the supply position is playing out for land on the edge of the villages and towns:
| Site | Scheme | Outcome |
|---|---|---|
| Land east of Prescot Road, Aughton (2025/0565/FUL) | 137 homes, cut to 122, with 43 affordable | Councillors resolved to approve it on 4 June 2026, as officers recommended |
| Land off Boundary Lane, Hesketh Bank | 34 bungalows for people over 55 | Dismissed on 27 January 2025 |
| Land west of Red Cat Lane, Burscough | 38 homes | Allowed on 20 January 2026 |
The Aughton Scheme on Prescot Road
Wain Homes first sought 137 homes on the land east of Prescot Road and brought the scheme down to 122, with the main access off Prescot Road and a second from Parrs Lane, and about an acre of public open space. Of the 122, 43 are affordable, mostly one and two bedroom maisonettes and semi-detached houses, and across the scheme the mix runs from six one bedroom homes to 32 with five bedrooms. The officers' report noted that with a supply of 1.34 years rather than five years, the balance is weighted towards approving homes, and councillors resolved to approve the scheme in line with that recommendation, as Place North West reported.
Why Hesketh Bank Failed and Burscough Succeeded
At Hesketh Bank the council's 2.49 years did not carry the scheme. The inspector found it would not accord with the plan as a whole, and that the flood sequential test relied on a smaller area of search than suits a scheme of that size, which gave a strong reason for refusal and meant the presumption in favour of sustainable development did not apply. A year later at Red Cat Lane, the inspector held that the policies on where homes go were out of date because the council could not show five years, and found the 38 homes a meaningful contribution towards the shortfall.
She also tested the scheme against policy GN3 of the local plan and policy BPD1 of the Burscough Parish Neighbourhood Plan, made in May 2019, which ask for privacy and amenity for neighbours and a design that fits the existing area, and found it met both. Local concerns there included the loss of best and most versatile agricultural land, but the inspector saw nothing to show harm enough to dismiss the appeal.
For an owner thinking of selling land near Burscough, Aughton or Hesketh Bank, the lesson is that a shortfall helps a well placed site, but flood evidence and a sound fit with the settlement must be right from the first day.
Top Grade Farmland, Martin Mere and the Estuary
The county council links the extent of the Green Belt to the large amount of top grade farmland. National policy asks decision makers to weigh the loss of best and most versatile agricultural land against a scheme's benefits; it does not rule homes out, as the Red Cat Lane decision shows.
The second constraint comes from the wetlands. The council's recreation mitigation page explains that it is working with the Liverpool City Region councils on a joint supplementary planning document to protect the southern Ribble estuary, Martin Mere and the Sefton Coast from recreational pressure. Scoping consultation ran from 14 August to 9 October 2023, and the page sets no tariff and records no adopted document. Homes that could affect these sites are still assessed under the Habitats Regulations.
In practice that means two early checks on any field here: a soil survey, to show how much weight the loss of farmland is likely to carry, and, for land near Martin Mere or the estuary, ecology surveys and an assessment of visitor pressure before an application goes in.
Our farmland page explains how we look at larger agricultural holdings, including where part of a farm could carry homes while the rest stays in production.
Before the Next Plan: A Borough Still on Its 2013 Strategy
The council adopted the West Lancashire Local Plan 2012 to 2027 on 16 October 2013, and it remains the current adopted plan. A review of that plan, meant to run to 2050, was started, but the council's Cabinet decided to cease work on it, and the review is now listed as withdrawn.
| Stage | What happened |
|---|---|
| Autumn 2019 | Work started on a new Local Plan, now covering 2023 to 2040 |
| November 2021 to January 2022 | Consultation on the scope, issues and options for the new plan |
| March 2025 | A Local Development Scheme was published, which the council now says is under review |
| 24 August to 2 November 2026 | A call for sites ran; the sites submitted went into the council's assessment |
At its July 2026 meeting the Local Plan Committee heard that the published timetable was out of date, and discussed the 30 month process, the Gateway 1 self-assessment and proposed housing numbers, terms from the reformed system of plan making. No new timetable had been published when we checked.
The call for sites is the clearest step so far. The council says it may reopen it after reviewing what was submitted, and that putting a site forward does not in itself mean it will be taken forward. Its most recent published SHELAA is the 2020/21 edition, which assesses land settlement by settlement, from Appley Bridge, Banks and Parbold to Rufford, Scarisbrick and Wrightington.
Land that missed the call for sites is not shut out, since the supply position gives a well placed field a route outside the plan meanwhile. The assessment that follows is described in our call for sites guide.
When to Sell Land in West Lancashire: The Dates That Matter
The Next Supply Figure and the Next Delivery Test
New supply figures here have surfaced in officers' reports and appeal decisions rather than a dated statement. While the 2013 plan stays in place, any new figure is measured against the standard method; we would not predict it.
The delivery test is published every year, and the Housing Delivery Test 2025 came out on 17 August 2026, covering April 2022 to March 2025. At 279% none of its consequences applies. The thresholds with consequences sit far below the current result: an action plan under 95%, a 20% supply buffer under 85%, and below 75%, unmet housing need treated as evidenced when policy S5 is applied.
A New Plan in the Reformed System
The council's plan page says a revised timetable will be published once finalised, and that document, with its first gateway, is the one to watch. Land put forward through the call for sites is already in the council's assessment.
Reorganisation
On 29 October 2026 the government withdrew its July 2026 decisions for nine areas, Lancashire, Blackburn with Darwen and Blackpool among them, with all options and proposals left under consideration and an outcome for every area promised early in 2027. No decision on new councils for Lancashire therefore stands. The letter keeps the May 2027 elections to today's councils and sets out, for the areas under review, a timetable of elections to new councils in May 2028 followed by vesting day on 1 April 2029. The borough council plans and decides applications in the meantime.
- Land on the edge of a settlement, and grey belt land, is worth looking at now, while officers report a supply well short of five years.
- Land that depends on a new allocation is best prepared for the council's assessment of the call for sites and for any reopening of it.
Questions About Selling Land in West Lancashire
West Lancashire builds far more homes than its target. Why would my field near Ormskirk have a case now?
Because supply is a separate test from delivery, and council officers reported 1.34 years in June 2026. That shortfall is evidence of unmet need, weighed with everything else, both for land beyond a settlement and for the grey belt test.
My field near Hesketh Bank is Protected Land in the 2013 plan. Can it still be sold for homes?
It can be put forward. Policy GN1 b) allows development on Protected Land only where it retains or enhances the rural character of the area, but with supply short of five years an inspector at Burscough treated the policies on where homes go as out of date. The Hesketh Bank appeal on Protected Land was dismissed, with the flood sequential test giving a strong reason for refusal, so flood evidence comes first.
I farm on the mosses near Scarisbrick. Does top grade farmland stop development?
No. National policy weighs the loss of the best and most versatile land against a scheme's benefits, and an inspector at Burscough in January 2026 found that concern did not justify refusal. A remote field on the open moss is harder to justify for other reasons, chiefly its distance from a settlement.
I missed the call for sites that closed in November 2026. Is it too late?
Not necessarily. The council says it may reopen the call after reviewing the sites it received, and the supply position gives well placed land a route through an application in the meantime. We can look at both with you.
Will Lancashire's reorganisation change the plan for my land?
Not yet. The government withdrew its July 2026 decision for Lancashire in October 2026 and is reviewing all options; for areas under review its letter would see any new councils elected in 2028 and in charge from April 2029. Until then West Lancashire Borough Council prepares the plan and decides applications.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in West Lancashire Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where West Lancashire stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in West Lancashire? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Lancashire
County overview
Selling Land in Lancashire
Sell land for development in Lancashire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 63% of need
Selling Land in Chorley
Sell land for development in Chorley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 175% of need
Selling Land in Fylde
Sell land for development in Fylde: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 334% of need
Selling Land in South Ribble
Sell land for development in South Ribble: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 478% of need
Selling Land in Burnley
Sell land in Burnley, near Padiham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 411% of need
Selling Land in Hyndburn
Sell land for development in Hyndburn: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 48% of need
Selling Land in Lancaster
Sell land for development in Lancaster: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 135% of need
Selling Land in Pendle
Sell land in Pendle, near Nelson. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 460% of need
Selling Land in Preston
Sell land in Preston, near Fulwood. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 425% of need
Selling Land in Ribble Valley
Sell land for development in Ribble Valley: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 96% of need
Selling Land in Rossendale
Sell land for development in Rossendale: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 237% of need
Selling Land in Wyre
Sell land for development in Wyre: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 381% of need
Selling Land in Blackburn With Darwen
Selling land in Blackburn with Darwen? We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 156% of need
Selling Land in Blackpool
Sell land in Blackpool, near Bispham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- West Lancashire Borough Council: The Local Plan (January 2026)
- West Lancashire Borough Council: The Local Plan 2023 to 2040
- West Lancashire Borough Council: Strategic Housing and Employment Land Availability Assessment and call for sites
- West Lancashire Borough Council: Local Plan Committee, 29 July 2026, agenda and minutes (July 2026)
- West Lancashire Borough Council: Recreation Mitigation Strategy
- Planning Inspectorate: Appeal decision APP/P2365/W/24/3350235, land off Boundary Lane, Hesketh Bank (January 2025)
- Planning Inspectorate: Appeal decision APP/P2365/W/25/3374202, land west of Red Cat Lane, Burscough (January 2026)
- Lancashire County Council: Green belt land, Lancashire Insight, 2025/26 figures
- GOV.UK: Local government reorganisation, letter withdrawing decisions for nine areas (October 2026)
- West Lancashire Borough Council: Planning Committee report, 2025/0565/FUL, land east of Prescot Road, Aughton (June 2026)
- Place North West: West Lancs approves 122 homes (June 2026)
- Wikipedia: West Lancashire
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.