Lewes has two planning authorities: the South Downs National Park Authority decides applications across more than half the district, including Lewes town, and the district council decides the rest. Outside the Park the council delivered 60% of the homes the test required, its last published land supply of 2.73 years dates from September 2023, and its draft plan of December 2025 seeks about 8,570 homes against a need it puts at 15,004.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Lewes and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Lewes built only 60% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 2.73 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from May 2016, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Lewes
- Fields and paddocks on the edge of Seaford, Newhaven, Peacehaven and Telscombe, outside the Park boundary and above the flood zones.
- Land adjoining Ringmer, Newick, Plumpton Green, Wivelsfield Green, Cooksbridge, Barcombe and Chailey Green that can read as a rounding-off of the village.
- Yards, nurseries, depots and redundant farm buildings in the Low Weald, including sites already assessed for the new plan.
- Larger holdings that could contribute to the growth the new plan has to find.
Every enquiry starts with the Park boundary, the flood map and the planning boundary. Where we take a site on, we pay for the landscape, highways, drainage and ecology work under an option agreement with a price agreed at the start, above today's value. The land stays in your use throughout, and should permission never come you keep the land and owe us nothing.
Is Your Land in Lewes a Good Fit?
You do not need to know the planning rules to sell land for development in Lewes. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Lewes
There are three common ways to sell land with development potential in Lewes. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Lewes: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Lewes and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Lewes
Three things shape the chances of selling land for development in Lewes: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
60%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
2.73 years
Short of five years: national policy treats this as evidence of unmet housing need. Stated by Lewes District Council, for the district outside the South Downs National Park: its position at September 2023, which its Authority Monitoring Report 2024 to 2025 says has not been updated since.
Checked sourceHomes built against homes needed
1,398
of 2,341 needed, April 2022 to March 2025
Most recent strategic plan adopted
May 2016
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
Regulation 18 consultations held in January and February 2025 (policies) and from 18 December 2025 to 28 February 2026 (spatial strategy and site allocations, about 8,570 homes to 2042 against about 15,000 by the government's method); the Local Development Scheme of February 2026 put the proposed submission plan in summer 2026, submission in winter 2026 against the 31 December 2026 deadline, examination in spring 2027 and adoption in winter 2027; on 29 September 2026 the council's local plan page (last updated 20 March 2026) still showed the second consultation as the latest stage
Checked source
See how Lewes compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A District the National Park Cuts in Two
The council's housing delivery action plan of June 2025 puts over half the district inside the South Downs National Park, which runs through its middle and separates the coastal towns of Seaford, Newhaven and Peacehaven from the villages of the Low Weald to the north.
- Who decides where. The National Park Authority has been the local planning authority for the Park since 2011, and that includes the county town of Lewes itself, Ditchling, Kingston and Rodmell. The district council decides in Seaford, Newhaven, Peacehaven, Telscombe and the Low Weald villages.
- Two plans. The Joint Core Strategy of 2016 was adopted by both authorities; the Park Authority adopted its own plan in July 2019 and published its replacement for final comments in May 2026.
If you are thinking of selling land in Lewes district, the Park boundary is the first line to find, since it decides which authority, and which plan, your land is judged under.
A Supply Figure Last Set in September 2023
The council's Authority Monitoring Report for 2024 to 2025 records 2.73 years at September 2023, no update published in 2025, and an acceptance that the district outside the Park cannot show five years of deliverable sites. Two numbers have been attached to that one base date:
| Where it appears | Figure | What it rests on |
|---|---|---|
| The council's own position at September 2023, repeated in its action plan of June 2025 | 2.73 years | Measured outside the Park with the 5% buffer the action plan records |
| The inspector at Wivelsfield Green, March 2025 | Around 2.6 years | The same base date, which the council called its most recent figure; the decision gives no working |
Since the council called the September 2023 position its most recent figure, the likeliest explanation is a recalculated statement of that same position at the appeal, not a new assessment. For a landowner the difference changes little: both are little more than half of five years, the council does not contest the shortfall, and a delivery result below 85% now brings a 20% buffer into any fresh calculation.
Completions Against Two Yardsticks
The monitoring report measures completions against the 2016 plan's 275 homes a year outside the Park: 536 in 2022 to 2023, 516 in 2023 to 2024 and 213 in 2024 to 2025. The council's draft plan of December 2025 puts the standard method for the same area at 682 a year, after an agreed apportionment with the Park Authority, out of 872 for the whole district. Because the 2016 plan is more than five years old, national policy replaces its requirement with the standard method when supply is tested, so any new statement must absorb the gap between 275 and 682.
Selling Land in Lewes Under the 2016 Plan and Its 6,900 Homes
The Joint Core Strategy, adopted by the district council in May 2016 and by the Park Authority the following month, provides for a minimum of 6,900 homes between 2010 and 2030, 345 a year across the whole district. It never claimed to meet need: its own text puts the objectively assessed need at 9,200 to 10,400 homes and explains why meeting it in full would not be sustainable, naming the Park, flood risk at Lewes, Newhaven and Seaford, the A27 and A259 and coastal erosion.
Part 2, Planning Boundaries and the Neighbourhood Plans
The Local Plan Part 2, adopted in February 2020 for the area outside the Park, draws a planning boundary around each settlement under policy DM1, within which development is permitted, and allows affordable homes on rural exception sites under policy DM2. It had to find a minimum of only 127 further homes, because growth at Newhaven, Newick, Plumpton Green, Ringmer and Wivelsfield Green was planned through made neighbourhood plans.
For an owner selling land near Newick, Plumpton Green or Ringmer, the made neighbourhood plan forms part of the development plan, so its policies are read alongside the district's own.
Designated, Refused and Decided at Appeal
The action plan records that 13 of the 40 major applications the council determined between April 2021 and March 2023 were allowed on appeal, and 15 of 41 to March 2024, a rate of 36%. Designation for major applications followed in May 2024. Two recent cases show where the balance falls:
- Wivelsfield Green, six homes, dismissed. In March 2025 an inspector dismissed an appeal for six homes on Slugwash Lane: harm to the setting of Baldings, a Grade II listed building, engaged the part of the presumption that protects designated heritage, and the public benefits fell well short of outweighing it.
- Turnpike Farm, Ringmer, up to 180 homes, refused. On 5 August 2026 the planning committee voted to refuse an outline application east of Broyle Side on landscape and highway safety grounds, against an officer recommendation to approve that relied on the tilted balance, on a site the press reported as proposed for inclusion in the emerging plan. The December 2025 draft does not name Turnpike Farm; the allocation it describes as farmland east of Broyle Side is Land North of the Broyle, about 340 homes.
Ringmer has been contested before. In April 2023 officers told the planning committee that seven refusals then at appeal, five at Ringmer, would be defended on fewer grounds: highways reasons were dropped where the county's highways team supported a scheme, drainage and ecology reasons where specialists were satisfied or conditions could deal with them, and at Bishops Close, 68 homes, the countryside reason too, because consultants advised that local landscape harm would not outweigh the benefits of new housing. The draft plan now counts Bishops Close, Round House Road and land south of the Broyle as permissions, and proposes Harrisons Lane, refused for 200 and then 75 homes, for up to 35. Technical objections fall away once the county's advisers are satisfied, which is why we fund that evidence early.
Outside the Park the presumption is in play and the council does not dispute it; heritage, landscape and scale are where it fights. The next test is an appeal by Sigma Strategic Land against the council's failure to decide application LW/25/0527, for up to 100 homes on land south of South Road, Wivelsfield Green. The local press reported in September 2026 that a hearing had been set for 20 October 2026 and that the council's case is that the shortage does not justify development disproportionate to the size, role and function of the village. The draft plan allocates nothing at Wivelsfield Green, which it places in its fourth tier, villages with very few facilities, so the South Road site is not among its proposals.
The Draft Plan: 8,570 Homes Against a Need of 15,004
The council consulted on its replacement plan under Regulation 18 in January and February 2025, on policies, and from 18 December 2025 to 28 February 2026, on its spatial strategy and site allocations. That document puts need outside the Park at 15,004 homes for 2020 to 2042 and seeks a requirement of approximately 8,570, which its supply table totals at 8,568, about 57% of need. It leans on planning guidance that an alternative to the standard method may be needed in National Parks, and potentially where part of a council lies in one. Most of the total is identified: 1,847 homes built between April 2020 and March 2025, 1,948 with permission, 792 on allocations carried forward from the 2016 and 2020 plans and the neighbourhood plans, and 588 from windfall. New allocations add 3,393, and this is where they fall:
| Settlement | Sites | Homes |
|---|---|---|
| Ringmer and Broyle Side | 4 | 1,605 |
| Cooksbridge | 2 | 751 |
| Edge of Haywards Heath | 2 | 585 |
| Newhaven | 3 | 218 |
| Peacehaven and Telscombe | 6 | 177 |
| Seaford | 4 | 100 |
| Small sites of up to nine homes, in the coastal towns and Ringmer | 10 | 52 |
The draft also redraws the 2016 hierarchy: Seaford and Newhaven first; Peacehaven with Telscombe, and Ringmer, second; Newick and Plumpton Green third; Cooksbridge, Wivelsfield Green, Barcombe Cross, Broyle Side and the Chailey villages fourth. Below the second tier it sets no housing figure and allocates only at Cooksbridge and Broyle Side, noting extensive unplanned growth in the smaller villages and pointing further schemes there to rural exception sites and neighbourhood plans. Boundaries are redrawn only around what has been built; unallocated land outside them is countryside, where homes are supported only in line with national policy or the plan. Four strategic green gaps are proposed, one north of Ringmer and west of Broyle Side, though not as absolute constraints, and the document invited new sites in line with the strategy.
The Timetable, and the Deadline Behind It
The council's Local Development Scheme of February 2026 records a deadline of 31 December 2026 for submission under the transitional arrangements and sets out the stages:
| Stage | Council's timetable |
|---|---|
| Proposed submission version (Regulation 19) | Summer 2026 |
| Submission to the Secretary of State | Winter 2026 |
| Examination | Spring 2027 |
| Adoption | Winter 2027, subject to progress at the examination |
When we checked on 29 September 2026 the council's local plan page, last updated on 20 March 2026, still listed the Phase 2 consultation as the latest stage and showed no Regulation 19 consultation, so the summer 2026 date had not visibly been met. The Regulation 19 plan, when it appears, is the version the inspector will examine; our call for sites guide walks through the stages.
Ways to Sell Land Outside the Park, and the Different Rules Inside It
With the presumption engaged, four routes are open in the district council's area, and different rules apply inside the Park:
- Inside a planning boundary: policy S4. Plots, large gardens, backland and redundant buildings within the boundaries drawn by Part 2 fall under policy S4, where refusal needs harm that would substantially outweigh the benefits.
- Land well related to a town or village: policy S5. A field or paddock adjoining Seaford, Newhaven, Peacehaven, Telscombe, Ringmer, Newick, Plumpton Green or Wivelsfield Green, served by infrastructure, falls under policy S5, and with a delivery result of 60% the unmet need it asks for is treated as evidenced.
- Rural exception sites: policy DM2. Land beside a village that would not get market housing can carry affordable homes for local people; see our paddocks and small sites page.
- Through the plan. A larger field that belongs in the strategy is best put forward before the Regulation 19 version is settled, with the evidence it will need at examination.
- Inside the National Park. The Park Authority's May 2026 plan makes provision for 6,735 homes Park-wide from 2024 to 2042, and under its policy SDC4 major development is refused unless exceptional circumstances are shown. The district council's delivery and supply figures do not apply there.
Our how it works page sets out what follows the first map check.
When to Sell Land in Lewes, Ahead of Its December 2026 Deadline
The Housing Delivery Test 2025 was published on 17 August 2026. We do not predict results, but the measure asked for 2,341 homes over three years, when the council built 1,398. A result at or above 75% would stop need being treated as evidenced under policy S5, while the shortfall would remain evidence to be weighed.
A Figure Three Years Old, and the South Road Appeal
The monitoring report for 2024 to 2025 carried no new supply figure, and the council's reported case in the South Road appeal at Wivelsfield Green accepts the shortfall without putting a new number on it. The draft plan's trajectory looks only at the five years after adoption in 2027 and gives no current figure. Until one is published, the 2.73 years from September 2023 remains the council's latest, and with delivery below 75% an application outside the Park does not depend on it.
The Plan's Dates, and What a Slip Would Mean
The council's timetable notes that the 31 December 2026 deadline applies to plans made under the existing system, so a plan submitted later would have to follow the new plan-making system instead. If the date holds, the examination the timetable puts in spring 2027 will test whether 8,570 homes against a need of 15,004 can be justified by the Park, the coast and the road network.
On 29 October 2026 the government said it was minded to divide Lewes district under reorganisation: East Saltdean and Telscombe Cliffs and the three Peacehaven wards would join an enlarged Brighton and Hove, and the rest of the district would become part of a new East Sussex Council, with vesting, the day the new councils take over, in April 2029. As our East Sussex page sets out, that is not a final decision, and the district council remains the planning authority until then.
For timing, a field outside the Park gains nothing by waiting while a delivery result below 75% keeps need evidenced, whereas land inside the Park moves with the Park Authority's own plan.
Questions About Selling Land in Lewes
My field is between Lewes and Ringmer. Which council would decide an application?
It depends on the Park boundary, which runs close to the town. Land inside it goes to the National Park Authority under its own plan, where major development is refused except in exceptional circumstances; land outside it goes to the district council, where the presumption applies.
The council was designated in 2024. Can I apply straight to the Planning Inspectorate?
Designation lets an applicant for a major scheme apply directly to the Inspectorate. Whether that is the better route depends on the site and on whether the designation still stands.
The committee voted to refuse up to 180 homes at Turnpike Farm in August 2026. Does that close Ringmer to new land?
No. The refusal turned on landscape and highway safety at that scheme, and the December 2025 draft proposes about 1,605 homes at Ringmer and Broyle Side, more than at any other settlement, so the argument was about impact, not whether Ringmer should grow.
My field at Plumpton Green is not in the December 2025 draft. Is that the end of it?
No. The draft sets no housing figure for Plumpton Green or most other villages, but it invited further sites in line with its strategy, and outside the boundaries homes are still supported where national policy allows. With delivery below 75%, policy S5 treats need as evidenced for land well related to a village and served by infrastructure.
Peacehaven and Telscombe might leave East Sussex under reorganisation. Should I wait?
No. The government's minded-to decision of 29 October 2026 would move them into Brighton and Hove only from April 2029, and it is not yet final. Until then the district council decides applications and is preparing the plan. Waiting only moves a site past the Regulation 19 stage, where allocations are settled.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Lewes Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Lewes stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Lewes? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in East Sussex
County overview
Selling Land in East Sussex
Sell land for development in East Sussex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 89% of need
Selling Land in Wealden
Sell land in Wealden, near Hailsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 50% of need
Selling Land in Brighton and Hove
Sell land in Brighton and Hove. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 23% of need
Selling Land in Eastbourne
Sell land for development in Eastbourne: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 35% of need
Selling Land in Rother
Sell land for development in Rother: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 44% of need
Selling Land in Hastings
Sell land for development in Hastings: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond East Sussex
- Mid SussexWest Sussex · 3.75 years of housing land
Sources
- Lewes District Council: Lewes District Local Plan Part 1, Joint Core Strategy (May 2016)
- Lewes District Council: Lewes District Local Plan Part 2, Site Allocations and Development Management Policies (February 2020)
- Lewes District Council: Authority Monitoring Report 2024 to 2025
- Lewes District Council: Housing Delivery Test Action Plan (June 2025)
- Lewes District Council: Local Development Scheme 2025 to 2028 (February 2026)
- Lewes District Council: Local Plan, A Spatial Strategy for Development in our Plan Area, incorporating Site Allocations, 2020 to 2042, Phase 2, Regulation 18 (December 2025)
- Lewes District Council: Lewes Local Plan (March 2026)
- Lewes District Council: Current Appeals and Reasons for Refusal, report to the Planning Applications Committee (April 2023)
- Planning Inspectorate: Appeal decision APP/P1425/W/24/3351850, land north of Slugwash Gardens, Wivelsfield Green (March 2025)
- South Downs National Park Authority: South Downs Local Plan, Proposed Submission, Regulation 19 (May 2026)
- Sussex Express: Councillors back refusal of controversial housing development near Ringmer (August 2026)
- Sussex Express: Appeal date set for major East Sussex housing development bid (September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.