East Sussex council area
Selling Land in Eastbourne
Checked on
Eastbourne is boxed in by the South Downs National Park, the sea, flood risk and a tight boundary with Wealden. It delivered 23% of the homes the government says it needs, the lowest result in East Sussex, and has 1.4 years of housing land. In September 2026 cabinet endorsed a plan for around 4,400 homes to 2042, against 11,730 by the government's standard method.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Eastbourne and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Eastbourne built only 23% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 1.4 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. Its local plan dates from February 2013, more than five years ago.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Eastbourne
- Yards, depots, garages, workshops and car parks anywhere in the town outside the National Park.
- Large gardens, backland and redundant buildings in Upperton, Seaside, Old Town, Meads, Hampden Park and Langney.
- Town centre buildings and sites where the plan's evidence supports high densities, including those standing empty.
- Paddocks and fields on the edge of the town, outside the Park and outside the functional floodplain.
- Land in Wealden beside the Eastbourne boundary, around Polegate, Stone Cross, Westham and Pevensey.
We start with a free review against the Park boundary, the flood map and the Levels, and say plainly which route fits. Our how it works page sets out what follows.
Is Your Land in Eastbourne a Good Fit?
You do not need to know the planning rules to sell land for development in Eastbourne. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Eastbourne
There are three common ways to sell land with development potential in Eastbourne. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Eastbourne: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Eastbourne and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Eastbourne
Three things shape the chances of selling land for development in Eastbourne: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
23%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
1.4 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 October 2025, measured against the standard method, 714 homes a year, plus a 20% buffer. Stated by Eastbourne Borough Council.
Checked sourceHomes built against homes needed
513
of 2,224 needed, April 2022 to March 2025
Most recent strategic plan adopted
February 2013
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
Cabinet endorsed the proposed submission plan on 16 September 2026 and recommended a six-week representation period, which the council said would start on 2 October 2026; the Local Development Scheme of February 2026 puts submission in December 2026, examination in April to May 2027 and adoption in November 2027
Checked source
See how Eastbourne compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A Town Between Beachy Head and Wealden
Eastbourne Borough Council covers a coastal town of about 101,700 people on 44 square kilometres, immediately east of Beachy Head, with regular trains to London Victoria. The Core Strategy divides it into fourteen neighbourhoods, from the Town Centre, Seaside and Upperton to Old Town, Hampden Park, Langney and Sovereign Harbour.
- The lowest delivery result in the county. The council delivered 513 homes against 2,224 required in the Housing Delivery Test 2025, a result of 23%, in the band where national policy treats unmet need as evidenced.
- A plan 13 years old. The Core Strategy dates from February 2013, so supply is measured against the standard method.
- Over 40% of the borough is National Park. The council's monitoring report of December 2025 places more than two fifths of the borough in the South Downs National Park, west of the town.
- A boundary drawn tight against Wealden. The council's delivery test action plan lists a tightly drawn boundary with Wealden to the north and east, the Channel to the south and a large area of flood risk centred on Eastbourne Park.
With so little open land inside the borough, the route matters more than the size of a site, and land just over the boundary in Wealden, covered on our East Sussex page, deserves its own look.
How 1,218 Homes Became the Supply Figure
Eastbourne publishes its five-year supply in its Authority Monitoring Report. The December 2025 report measures the position at 1 October 2025 against the standard method:
| Step | Council's figure |
|---|---|
| Local housing need by the standard method | 714 homes a year |
| Five years of need | 3,570 homes |
| Buffer | 20%, an extra year of need, 714 homes |
| Five-year requirement with buffer | 4,284 homes |
| Sites with permission, not yet started | 825 homes on 86 sites |
| Sites under construction | 213 homes on 21 sites |
| Windfall allowance | 180 homes, 90 a year in years four and five |
| Deliverable supply | 1,218 homes, 28.4% of the requirement |
| Result | 1.4 years |
The buffer is 20% because the Housing Delivery Test 2023 put delivery at 28%, and the Housing Delivery Test 2025 keeps it there. The report disagrees with itself once: paragraph 6.67 gives a total of 1,229 homes, but the parts it lists add up to 1,218, the figure Table 15 uses. The likely explanation is a slip in the total; on either figure the borough has less than a third of the land it needs.
What the Shortfall Means for Land Here
A shortfall this deep is evidence of unmet need, to be weighed and not an automatic finding, but here it does not carry the argument alone: with a delivery result below 75%, policy S5 of the August 2026 framework treats unmet need as evidenced. S5 reaches land well related to a settlement and served by infrastructure, which here means the few edge parcels the town still has.
Why the Town Builds on Small Sites, and Slowly
The council's Housing Delivery Test action plan of June 2025 answers the 2023 test, 535 homes against 1,880 required, and is candid about the causes:
- Almost everything is small. There are very few large sites: 91 of the 111 sites that delivered the 535 homes provided fewer than five each.
- Most of it is brownfield. Higher existing use values and more expensive remediation weigh on viability.
- Flats dominate. With a zero Community Infrastructure Levy rate on apartments, over 70% of homes since the levy was adopted have been flats.
- Permissions go unbuilt. Around 28% of permitted homes have not been built out.
The monitoring report gives the long run: 3,902 net new homes since 2006, an average of 4.8 a site, against a cumulative target of 4,560, and just 94 in 2024/25, the lowest year in its table. Since 2018, it says, 1,200 homes have come at 171 a year even with the presumption in favour of sustainable development applying, and it concludes that the presumption has not had a positive impact on delivery. Policy support has been available here for years; what has been missing is land.
For an owner selling a yard, garage court or tired commercial building in Eastbourne, that conclusion matters: land, not policy, is what the town lacks, so a site that can actually be built counts for a great deal here.
Selling Land in Eastbourne Under a Core Strategy Built on Windfall
The adopted Eastbourne Core Strategy Local Plan runs from 2006 to 2027 and plans for at least 5,022 homes, 240 a year, alongside the Town Centre Local Plan of 2013, the Employment Land Local Plan of 2016 and saved 2003 policies. It does not apply inside the National Park. Policy B1 puts approximately 1,242 homes in the Town Centre and up to 150 at Sovereign Harbour and asks for at least 70% of housing on brownfield land.
From the start the plan relied on windfall, given the town's tight confinement by the National Park, the sea and flood risk, and at the centre of the town lies Eastbourne Park, about 380 hectares of grazed wetland. Delivery has followed: the Town Centre has produced 1,160 of the 3,902 homes since 2006, 84% of them through changes of use and conversions.
From 11,730 Homes of Need to a Plan for Around 4,400
The replacement is the Eastbourne Local Plan 2022 to 2042, for the borough outside the National Park. The Land Availability Assessment of February 2026 set no minimum site size, identified 945 sites (27 through the call for sites), removed 47 lying wholly in the functional floodplain and found 158 deliverable, developable or potentially developable for housing. It concludes that the plan will provide for between 4,472 and 6,343 homes.
The Local Development Scheme of February 2026 moved the draft plan consultation to February and March 2026 after delays to critical evidence studies. On 16 September 2026 cabinet endorsed the proposed plan and recommended that full council approve a six-week representation period, which the council's announcement said would start on 2 October 2026. It gives an assessed need of 11,730 homes to 2042 by the standard method and a capacity-based requirement of around 4,400, citing flood risk, the National Park, limited land and the sea.
Those numbers do not quite match the council's other documents. Around 4,400 sits just below the 4,472 at the bottom of the assessment's range, and 11,730 over twenty years is about 587 homes a year, below the 714 a year the monitoring report uses for supply. The announcement explains neither gap, so the published plan and its evidence are where to look. Either way, around 4,400 homes is well under half of the assessed need.
| Stage | Council's timetable |
|---|---|
| Draft plan consultation (Regulation 18) | February to March 2026 |
| Publication and representations (Regulations 19 and 20) | September to October 2026; the council's announcement gave a start of 2 October 2026 |
| Submission to the Secretary of State | December 2026, with a deadline of 31 December 2026 |
| Independent examination | April to May 2027 |
| Inspector's report | October 2027 |
| Adoption | November 2027 |
For an owner whose land is among the 158 sites the assessment found deliverable, developable or potentially developable, the representation period is where its place in the plan is argued.
Selling Land Near the Park, the Sea or the Levels, and Who Decides on Each
Three constraints fix the shape of Eastbourne, each with its own authority:
- The South Downs National Park. The National Park Authority has decided applications inside the Park since 2011. Its proposed submission plan of May 2026 provides for 6,735 homes across the whole Park to 2042, and its policy SDC4 refuses major development except in exceptional circumstances.
- The Pevensey Levels. Natural England describes 9,638 hectares of low-lying land between Eastbourne and Bexhill, 37% of it a Ramsar site and Site of Special Scientific Interest, with a shingle bank as its sea defence. The monitoring report notes that water quality in the town potentially affects the Ramsar site, so a scheme's drainage needs thought early.
- The sea. The Environment Agency leads the Pevensey Bay to Eastbourne coastal scheme with the borough, county, Rother and Wealden councils, covering 15 kilometres of coast from Holywell to Cooden Beach. It warns that the land behind the defences is so low that a breach anywhere could flood a much wider area.
Inside the town, the land assessment keeps sites in tidal flood zone 3a behind the defences in play, subject to the sequential test and, for homes, the exception test; our guide to flood risk explains both.
Ways to Sell Land in a Borough With Almost No Edge
Eastbourne has little of the ring of fields that policy S5 usually works on, so the routes here are narrower, and one runs across the boundary:
- Inside the town: policy S4. Plots, large gardens, backland and underused buildings within the built-up area fall under policy S4, which says approve unless the harm would substantially outweigh the benefits. With the land assessment finding 15 Town Centre sites capable of more than 150 homes a hectare, a central site can be worth more than its size suggests.
- Previously developed land outside the Park. Yards, depots, garages and car parks are the raw material of a plan that wants at least 70% of its homes on brownfield land. Our brownfield and yards page sets out what we look for; remediation and existing use value are costs we carry.
- The few edge parcels outside the Park. A field or paddock adjoining the built-up area, outside the National Park and the functional floodplain, falls under policy S5 with need already evidenced by the 23% result.
- Through the new plan. The call for sites portal has been permanently open since March 2025. Our guide to calls for sites and local plans explains where evidence does most good.
- Just over the boundary in Wealden. Polegate, Stone Cross, Westham and Pevensey belong to Eastbourne's wider area but lie in Wealden, which decides applications there on its own figures. Wealden published its Regulation 19 plan in September 2026 and has reopened its call for sites for sites of five or more homes.
Each route needs evidence that small owners find hard to fund alone, from contamination and viability studies to a density case, and we pay for all of it under an option agreement.
When to Sell Land in Eastbourne, Between Publication and Submission
The Housing Delivery Test 2025 was published on 17 August 2026, and the test is refreshed each year. We will not forecast the next result, but the best three years in the council's own table, 1,034 homes from 2006 to 2009, fall well short of the 2,224 homes the current measure asks for.
Supply, and When the Next Figure Is Due
The council reports supply once a year in its monitoring report; the last took a base date of October 2025 and was published in December 2025. Until the plan is adopted no allocations can join the supply, so what matters more is the requirement the inspector accepts, which the action plan calls a new, realistic target.
The Plan's Dates, and Reorganisation
The council's timetable puts submission in December 2026, the examination in April and May 2027 and adoption in November 2027; the monitoring report says submitting by the end of December 2026 keeps the plan under the current plan-making system. Representations in the six-week period the council said would start on 2 October 2026 put a site in front of the inspector, and a site with its evidence ready is far better placed than one named later.
On 29 October 2026, in a minded-to letter to East Sussex council leaders, the government set out a provisional view: one East Sussex Council of about 537,000 people would take the place of the county council and the five districts, Eastbourne among them. Elections to it would be held in May 2028 and it would take over in April 2029. The letter is not a final decision, since representations come first and Parliament must approve the change, so Eastbourne Borough Council remains the authority preparing this plan and deciding applications.
What This Means for Timing
- Brownfield and sites inside the town can be looked at now; their route does not depend on the plan.
- Edge parcels outside the Park are best assessed while need is treated as evidenced.
- Land on the Wealden side belongs in Wealden's process, where the call for sites has reopened.
Questions About Selling Land in Eastbourne
My land is on the Downs above Old Town. Does the council's shortage of homes help me?
Not in the way it would elsewhere. Land inside the South Downs National Park is decided by the National Park Authority under its own plan, and the borough council's supply and delivery figures do not apply there. We check the Park boundary first, because land just outside it is in a very different position.
Half my site is in flood zone 3. Is that the end of it?
It depends which zone. The council's land assessment ruled out land wholly in zone 3b, the functional floodplain, but kept tidal zone 3a behind the defences. A 3a site needs a flood risk assessment and the sequential and exception tests, which we pay for.
I own a builder's yard in Hampden Park. Would anyone want it for homes?
Yes. Brownfield land is what Eastbourne's plan has always leaned on, with at least 70% of homes meant to come from it. The obstacles the council itself names, higher existing use value and remediation cost, are the ones we take on.
My field is in Polegate, just over the line in Wealden. Is it any use to you?
It can be. Polegate is decided by Wealden on its own figures and plan, but Eastbourne's plan finds room for only around 4,400 homes against a need of 11,730, and that shortfall next door is part of the case for well placed land by the boundary.
Should I wait for the new Eastbourne plan to be adopted before doing anything?
No. For a site inside the town the presumption already applies and adoption would not improve it. For a site that might be allocated, the evidence needs to be in before the examination in 2027, not after it.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Eastbourne Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Eastbourne stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Eastbourne? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in East Sussex
County overview
Selling Land in East Sussex
Sell land for development in East Sussex: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 89% of need
Selling Land in Wealden
Sell land in Wealden, near Hailsham. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Homes built: 35% of need
Selling Land in Rother
Sell land for development in Rother: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 50% of need
Selling Land in Brighton and Hove
Sell land in Brighton and Hove. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Homes built: 44% of need
Selling Land in Hastings
Sell land for development in Hastings: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Homes built: 60% of need
Selling Land in Lewes
Sell land in Lewes, near Seaford. Free review. We pay for all the planning and agree your price first. If it fails, you keep your land and owe nothing.
Sources
- Eastbourne Borough Council: Authority Monitoring Report 2024 to 2025 (December 2025)
- Eastbourne Borough Council: Eastbourne Core Strategy Local Plan (February 2013)
- Eastbourne Borough Council: Housing Delivery Test Action Plan (June 2025)
- Eastbourne Borough Council: Land Availability Assessment (February 2026)
- Eastbourne Borough Council: Local Development Scheme 2026 to 2029 (February 2026)
- Eastbourne Borough Council: Consultation green light for Eastbourne's proposed new Local Plan (September 2026)
- South Downs National Park Authority: South Downs Local Plan, Proposed Submission, Regulation 19 (May 2026)
- Natural England: National Character Area profile 124, Pevensey Levels (2013)
- Environment Agency: Pevensey Bay to Eastbourne Coastal Management Scheme, scheme information and questions (June 2026)
- Wealden District Council: Strategic Housing and Economic Land Availability Assessment and call for sites (September 2026)
- GOV.UK: Local government reorganisation, minded to decision letter to East Sussex and Brighton and Hove council leaders (October 2026)
- Wikipedia: Eastbourne
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.