Shropshire council area
Selling Land in Telford and Wrekin
Checked on
Telford and Wrekin has built far more homes than its target asks for, and its council can show 6.02 years of housing land on the measure of its plan of January 2018. The inspectors found a replacement plan to 2041 sound in September 2026, with three large new communities, thirty four other allocations and a bigger allowance for small sites, and the council's cabinet report recommends that Full Council adopt it on 26 November 2026. For most land here, the route to permission runs through that plan.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Telford and Wrekin and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Telford and Wrekin can show 6.02 years of housing land, more than the five years national policy expects, and built 309% of the homes it needed in the government's latest count. So the surest routes here are the local plan, for land on the edge of towns and villages, and sites within them, where national policy generally supports new homes. Its local plan dates from January 2018, and a new one was found sound in September 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Telford and Wrekin
- Plots, yards, depots and backland inside the Telford built-up area or Newport.
- Land within or beside one of the plan's allocations, including the edges of the Sustainable Communities at Bratton, Muxton and Wheat Leasows.
- Parcels beside the rural settlements, suited to the limited development policy HO12 allows.
- Land at the edge of a village that could take a rural exception scheme of affordable homes.
- Larger holdings on the edge of Telford or Newport, outside the Strategic Green Gaps, for the next review of the plan.
Here the mining searches, the access and the ecology usually decide a site before the housing numbers do, and we pay for every part of that work, along with any application, under an option at a price we agree with you before we start, set above what the land is worth in its current use. You keep farming or using the land until completion, and if permission is not granted it stays yours and you owe us nothing. The how it works page sets out each stage.
Is Your Land in Telford and Wrekin a Good Fit?
You do not need to know the planning rules to sell land for development in Telford and Wrekin. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Telford and Wrekin
There are three common ways to sell land with development potential in Telford and Wrekin. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Telford and Wrekin: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Telford and Wrekin and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Telford and Wrekin
Three things shape the chances of selling land for development in Telford and Wrekin: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
309%
Meeting its housing requirement.
Five-year housing land supply
6.02 years
Five years or more of deliverable housing land. Position at 1 April 2024, measured against the adopted Local Plan requirement of 864 homes a year, plus a 5% buffer. Stated by Telford & Wrekin Council.
Checked sourceHomes built against homes needed
4,425
of 1,430 needed, April 2022 to March 2025
Most recent strategic plan adopted
January 2018
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The inspectors' report of 25 September 2026 found the Local Plan Review (2021 to 2041) sound with main modifications; the report to Cabinet for 12 November 2026 recommends adoption at Full Council on 26 November 2026
Checked source
See how Telford and Wrekin compares with the other 187 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
A New Town Between the Conurbation and Rural Shropshire
Telford and Wrekin became a unitary authority on 1 April 1998, independent of Shropshire County Council, and it covers about 290 square kilometres, with 185,543 residents at the 2021 census. The inspectors on its new plan place it between the Birmingham and Black Country conurbation to the east and rural Shropshire to the west, served by the M54 and three railway stations.
- Telford and its towns. Apart from Newport, the main towns are Telford, Wellington, Oakengates, Madeley, Dawley and Coalbrookdale, and the council's monitoring report for 2023/24 counts 11,906 of the 14,336 homes built from 2011 to 2024 in the Telford area.
- Newport. The next largest place, in the north east of the borough, took 1,438 homes over the same thirteen years.
- A wide rural area. The inspectors describe the countryside as including the Weald Moors and the Wrekin Forest, and the monitoring report records 1,022 homes built across it since 2011.
If you are thinking of selling land in Telford and Wrekin, the honest starting point is that the borough is short neither of new homes nor of planned sites, so the question for any field or plot is which route through the plan it fits, rather than whether the borough needs it.
Five Years of Land on the Old Measure, and on the New One
The council's Housing Land Supply Statement 2024 to 2029, published in December 2024, finds 6.02 years of deliverable land at 1 April 2024: 5,462 homes against a five-year requirement of 4,320, built on the 2018 plan's figure of 864 homes a year plus a 5% buffer. It counts small windfall sites only in the last two years, on an average of 30 homes a year since 2001. The inspectors give the borough's standard method figure as 881 homes a year, and on our arithmetic the same 5,462 homes would still give about 5.9 years against that figure plus the buffer.
The Position the Council Expects on Adoption
The council's Housing Delivery Topic Paper of June 2026 measures the five years from 2026/27 against the new plan's requirement, including the contribution to the Black Country. The inspectors' report of 25 September 2026 arrives at the same figures and sees no need for a buffer above 5%, given the council's delivery record.
| Part of the calculation | Crediting homes built early | Without that credit |
|---|---|---|
| Five-year requirement, with the Black Country share and a 5% buffer | 4,781 homes | 5,429 homes |
| Yearly requirement | 956 homes | 1,086 homes |
| Supply from allocations | 2,953 homes | 2,953 homes |
| Supply from major and minor permissions | 2,620 homes | 2,620 homes |
| Windfall allowance, less a lapse allowance of 19 | 341 homes | 341 homes |
| Total supply | 5,914 homes | 5,914 homes |
| Years of supply | 6.2 years | 5.4 years |
How National Policy Reads Here
For land beyond the edge of a town or village, the national framework of August 2026 offers policy S5, which backs homes on a site well related to the settlement and served by infrastructure, where unmet need is evidenced. Need is treated as evidenced where a council's delivery result falls below 75%, and a supply short of five years is evidence of unmet need to be weighed, not an automatic finding. Telford and Wrekin is in neither position. Inside settlements, policy S4 expects approval unless the harm would substantially outweigh the benefits, whatever the housing numbers. Our guide to the 2026 framework explains both policies.
For a landowner, the plain reading is that a speculative application on an unallocated field has little to lean on here on either measure, while a plot inside Telford, Wellington or Newport can be judged on its own merits now.
What the Plan to 2041 Asks for, and Where It Puts the Homes
The council submitted its Local Plan Review on 12 September 2025, hearings ran from 24 February to 19 March 2026, and the inspectors conclude that, with their main modifications, the plan is sound. They supported moving the plan period to 2021 to 2041 and set the requirement at 20,680 homes, or 1,034 a year: the standard method figure of 881 plus 153 a year towards the unmet need of the Black Country authorities, agreed through statements of common ground.
| Source of supply, 2021 to 2041 | Inspectors' figure |
|---|---|
| Completions to 2024/25, existing permissions of 3,858 homes and the windfall allowance | Around 11,300 homes |
| New allocations in the plan | 10,231 homes |
| Total supply | Around 21,500 homes |
| Requirement | 20,680 homes |
Three Sustainable Communities and Thirty Four Other Sites
Most new allocations sit in three Sustainable Communities, urban extensions to the north of Telford that together provide for nearly 8,000 homes, close to 7,000 of them within the plan period:
- SC1, Land at Bratton: around 2,100 homes, with 2 hectares of employment land and a new local centre.
- SC2, Land North West of Muxton: around 2,700 homes, renamed by the inspectors because most of the site lies north west of the village.
- SC3, Land North of the A442 at Wheat Leasows: around 3,100 homes, about 2,190 of them expected within the plan period.
The plan lists 35 other housing allocations in its Table 7. The inspectors found 34 justified and struck out HO26, Land South of Old Vicarage, over Sport England's unresolved concerns about ball strike from the cricket club next door. They also concluded that the 25% affordable housing sought on major schemes in the Telford built-up area was not justified and that the evidence clearly pointed to 20%.
A Bigger Place for Small Sites
The submitted plan allowed for 60 windfall homes a year from sites the plan does not name. The inspectors found that the council's evidence had used a threshold of five homes, where national policy defines major sites as ten or more, and concluded that 120 a year would be more realistic. The topic paper records minor windfall sites averaging 126 homes a year from 2013/14 to 2023/24.
Owners selling land for development in Telford and Wrekin should note that change, because inspectors who expect around 120 homes a year from unnamed sites are expecting infill plots, yards and small parcels to keep coming forward without an allocation.
Newport, the Villages and the Rural Area
Beyond the Telford built-up area, the inspectors describe a strategy of some growth in and on the edge of Newport and some housing growth in the key rural settlements, and they named Allscott as a defined rural settlement that new housing would support. The monitoring report shows the countryside taking 16 homes in 2011/12, 207 in 2021/22 and 197 in 2022/23, so rural building is no longer a trickle.
The inspectors found policy HO12, on new homes in the rural area, very unclear in places, especially on what counts as limited development, and modifications MM083 and MM084 make it effective. They also found that the plan named no rural settlements for the policy, relying instead on a separate technical paper, and modification MM137 adds that list to the plan as an appendix. The affordable exception policy, HO13, was clarified too.
In the order a review tests them, the routes are these:
- Inside Telford or Newport. Plots, yards and backland are judged under policy S4.
- Within an allocation. The principle is settled once the plan is adopted, and an application follows.
- In a rural settlement. Policy HO12 sets the limited development a listed village can take.
- As a rural exception. Policy HO13 provides for affordable homes on land that would not otherwise come forward.
- An unallocated field. With no shortfall to weigh, most open land on the edge of the towns waits for the next review.
If you are selling farmland in the rural north of the borough, the modified HO12 wording and whether the nearest village is on the council's list of rural settlements will decide more than the size of the field. Our farmland page describes the agricultural land we take on.
Mine Workings, the Wrekin and the Gaps Between Places
The council's stability report declaration form explains that the borough held rich deposits of coal, fireclay, ironstone and limestone at shallow depths, mined extensively over the past two or three centuries. It covers the whole borough except the Ironbridge Gorge World Heritage Site and asks whether a Coal Authority mining report and a coal mining risk assessment have been produced and whether any known mine entries lie within the site or within 20 metres of it. Old workings shape layouts and ground costs, so we commission the mining searches at the start of our review, at our own cost.
The Shropshire Hills National Landscape calls the Wrekin the least typical part of the Shropshire Hills, lying on the urban fringe of Telford, with the boundary drawn tightly around the wooded hills of the Wrekin and the Ercall. The council defines the Wrekin Forest as a Strategic Landscape, and the management plan asks development on the eastern fringes of the Wrekin and near Ironbridge to respond to its character.
The new plan's Strategic Green Gaps, under policy NE7, aim to prevent Lilleshall and Wrockwardine merging with Telford. The inspectors saw no justified case for a further gap at Eyton on the Weald Moors, but asked for a landscaped buffer between that village and the Sustainable Communities.
For an owner west of Telford or near the gaps, those designations are the first lines we draw on the map, because they decide whether a site is worth the cost of the mining and access work that follows.
Timing a Sale of Land in Telford and Wrekin Around the New Plan
The report to Cabinet for its meeting of 12 November 2026 asks members to accept the inspectors' recommendations, which bring 147 main modifications, and to recommend that Full Council adopt the Telford & Wrekin Local Plan 2021 to 2041 on 26 November 2026. The 2018 plan remains the adopted plan until Full Council decides. The report says adoption would withdraw it in its entirety and put the five-year supply at 6.2 years, and it warns that delay would undermine the council's land supply position.
A New Yardstick, Then the Standard Method Again
Once the new plan is adopted, its own requirement, adjusted for the homes built ahead of it, becomes the measure of supply, and national policy replaces that requirement with the standard method once the plan is more than five years old.
Delivery Far Above Every Threshold
The Housing Delivery Test 2025, published on 17 August 2026, records 4,425 homes built against 1,430 required, and the test is run again each year. At 309%, Telford and Wrekin is far above the 95% line that triggers an action plan, the 85% line where the buffer rises to 20% and the 75% line at which policy S5 treats unmet need as evidenced.
The Call for Sites, and What to Prepare Now
The council's call for sites page records two exercises, which closed in January 2021 and October 2022, but gives no date for the next. Our guide to calls for sites and local plans explains how a site moves from submission to allocation.
- Sites inside the towns and villages can be looked at now, as policy S4 and the rural policy apply whatever the supply position.
- Land inside an allocation is ready for an application once the plan is adopted.
- Open fields elsewhere are best prepared for the next call for sites, with the mining, access and landscape evidence in hand before it opens.
Questions About Selling Land in Telford and Wrekin
Telford has more than five years of land and a new plan found sound. Is it worth asking about my field at all?
Yes, if the route is clear. An unallocated field on the edge of a town is a long-term case for the next review, but land inside Telford or Newport, within an allocation, or at a village the rural policy covers can often be looked at now.
My land is next to the Bratton site. Does the allocation help me?
Not straight away, because land outside the allocation's boundary is not allocated. The new community brings employment land and a local centre, and being close to those may count in a site's favour when the plan is next reviewed.
There are old mine shafts on my land near Dawley. Does that rule it out?
Not by itself. The council's form asks whether a Coal Authority mining report and a coal mining risk assessment have been produced, and whether any mine entry lies within 20 metres of the site. We check those answers first, because they shape the layout and the cost.
Can I sell a paddock beside a village near Newport without it being allocated?
Possibly, if the village is on the plan's list of rural settlements and the scheme fits the limited development policy HO12 allows, or if it suits affordable homes as a rural exception. Our paddocks and small sites page covers this kind of plot.
Is land on the lower slopes of the Wrekin worth putting forward?
Only with care. The National Landscape boundary is drawn tightly around the wooded hills, so land below them may lie outside it, but it still forms the setting of the designation and the Wrekin Forest Strategic Landscape, and schemes there have to respond to that character.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Telford and Wrekin Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and with the local plan the main route in Telford and Wrekin, these are the ones that matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 5 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 22 min read
What Happens If Planning Is Refused, and What Happens While It Is Being Decided
What a planning refusal means for a landowner under an option agreement: appeals, resubmissions, timescales, and why you keep your land and owe nothing.
Subhan Property Group · Updated 5 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 5 November 2026
Practical Issues · 23 min read
Can I Keep My House, or a Plot for My Family, and Put the Rest of My Land Forward?
How to keep your house, garden or a family plot and sell the rest: splitting a title, rights for the land you keep, design, lenders and tax relief.
Subhan Property Group · Updated 5 November 2026
Selling Land in Telford and Wrekin? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Shropshire
County overview
Selling Land in Shropshire
Sell land for development in Shropshire: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 124% of need
Selling Land in the Shropshire Council Area
Sell land in Shropshire Council. Free review. We pay for all the planning and agree your price up front. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Shropshire
- South StaffordshireStaffordshire · 0.87 years of housing land
- StaffordStaffordshire · 1.95 years of housing land
Sources
- Planning Inspectorate: Report on the examination of the Telford and Wrekin Local Plan Review (September 2026)
- Telford & Wrekin Council: Housing Delivery Topic Paper, updated version, examination document TW17 (June 2026)
- Telford & Wrekin Council: Adoption of Telford & Wrekin Local Plan, report to Cabinet (November 2026)
- Telford & Wrekin Council: Housing Land Supply Statement 2024 to 2029 (December 2024)
- Telford & Wrekin Council: Annual Monitoring Report 2024, housing section (monitoring year to March 2024)
- Telford & Wrekin Council: Telford and Wrekin Local Plan 2011 to 2031 (adopted January 2018)
- Telford & Wrekin Council: Call for sites (November 2024)
- Telford & Wrekin Council: Stability Report Declaration Form (October 2023)
- Shropshire Hills National Landscape: Management plan 2025 to 2030, Wrekin Forest
- Wikipedia: Telford and Wrekin
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.