Oadby and Wigston is a small borough on Leicester's south eastern edge, part of the wider Leicester urban area. Its new plan offers 240 homes a year against a government figure of 389, and the inspectors examining it have asked why. The council reports 6.68 years of housing land, but only by measuring against its own lower figure.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
Three Towns Inside the Leicester Urban Area
Oadby and Wigston Borough Council is based at Brocks Hill in Oadby. The submitted plan names three main settlements, Oadby, Wigston and South Wigston, with the small settlement of Kilby Bridge to the south, and it describes the whole borough as part of the wider Leicester Urban Area. What open land remains lies mainly in two green wedges and on the outer edges of Wigston and Oadby, where the new plan finds its sites.
- 152% in the Housing Delivery Test 2025. The borough built 746 homes against 492 required over the three years measured.
- A plan from April 2019. The adopted Local Plan 2011 to 2031 is 7 years old.
- A new plan submitted for examination in June 2026. The Local Plan 2025 to 2042 went to the Secretary of State on 12 June 2026, after its final consultation from 17 April to 29 May.
- Two inspectors. M. Hayden and M.G. Garrard were appointed on 22 June 2026, and hearings open on 3 November 2026 at the council offices in Oadby.
- A supply above five years, on the council's measure. Its Housing Implementation Strategy reports 6.68 years at 31 March 2026, against the new plan's figure rather than the government's.
The delivery result looks comfortable, yet the requirement it measures against is far below the 389 homes a year the government's method now gives the borough. The questions that decide land here now are how many homes the borough should really plan for, and who takes the rest.
Oadby and Wigston in Figures
The government's latest figures for the council, its latest five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
152%
Meeting its housing requirement.
Five-year housing land supply
6.68 years
Five years or more of deliverable housing land. Position at 31 March 2026, measured against the submitted Local Plan figure of 240 homes a year, with a 31-home backlog and a 5% buffer, rather than the standard method figure of 388 homes a year that national policy uses once a plan is more than five years old, as the adopted 2019 plan is. Stated by Oadby and Wigston Borough Council (Housing Implementation Strategy 2026).
Checked sourceHomes built against homes needed
746
of 492 needed, April 2022 to March 2025
Most recent strategic plan adopted
April 2019
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Updated
New Local Plan submitted 12 June 2026; examination hearings open 3 November 2026
Checked source
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
240 Homes a Year Against a Need of 389
The submitted plan states that "the required level of housing growth over the Plan period (2025 to 2042) is 4,080 new homes", or 240 a year. The government's standard method gives the borough a need of 389 a year. The council's reason for the gap is transport: the plan says that at the standard method's rate "the highway network would be severely congested" and bus and car journeys would be hampered to an unacceptable degree. It proposes that the difference be taken by neighbouring councils through the Leicester and Leicestershire statement of common ground.
| Homes, 2025 to 2042 | Homes a year | |
|---|---|---|
| Local housing need, standard method | 6,613 | 389 |
| Submitted plan requirement | 4,080 | 240 |
| Gap left for others to meet | 2,533 | 149 |
What the Inspectors Asked
Their initial letter of 16 July 2026 calls the gap an unmet need of "around 39%" and says it is "not apparent" that any of the national exceptions to meeting need in full apply. They also pointed out that the councils' own December 2025 statement of common ground assumes the borough's 389 a year "will be met in Oadby and Wigston in full". That statement goes further: it says it had been assumed that Oadby and Wigston "will just be able to meet its own need" but not take any of Leicester's, which is why the borough is given no share of the city's unmet need. The inspectors are waiting for a revised statement and plan a focused hearing on it.
In its updated response of 21 August, the council held its ground. It describes highway and transport limits as a "development ceiling" on growth, confirmed that the December 2024 framework applies, and formally asked the inspectors to recommend main modifications wherever they are needed. It also said that extending the plan to 2043 "would serve little practical planning purpose", because a new Leicester-based council was then expected within 18 to 20 months and would prepare a plan of its own to supersede this one. That view was set out before the government paused reorganisation in September.
A Supply of 6.68 Years, on the Plan's Own Figure
The Housing Implementation Strategy 2026, based at 31 March 2026, is the council's latest statement. It measures five years against 240 homes a year, saying "the current evidenced position in relation to 5-year supply is one of 240 dpa, as per the Regulation 19 emerging Local Plan":
| Part of the calculation | Council's figure |
|---|---|
| Five years at 240 a year | 1,200 homes |
| Backlog | 31 homes |
| With a 5% buffer | 1,293 homes |
| Deliverable supply to 2031 | 1,729 homes |
| Result | 6.68 years |
Why the Yardstick Matters
The adopted plan dates from April 2019, so its housing policies are more than five years old. National policy says supply should then be measured against local housing need from the standard method, and the strategy quotes that rule itself before setting it aside in favour of 240. It records that the December 2024 change to the method lifted the borough's need from 189 to 384 homes a year, and that the figure stood at 388 at 31 March 2026. The plan and the inspectors use 389; the formula is rerun as new data is published, which most likely explains the small differences.
Five years at 388 a year comes to 1,940 homes before any buffer, which is more than the 1,729 the council counts. So the headline depends entirely on using a figure from a plan that is not yet adopted and whose requirement the inspectors are questioning. The council's case is that 240 is the evidenced position; an inspector deciding an appeal would start from national policy.
Completions Have Slowed
| Year | Homes completed |
|---|---|
| 2020/21 | 215 |
| 2021/22 | 153 |
| 2022/23 | 335 |
| 2023/24 | 287 |
| 2024/25 | 124 |
| 2025/26 | 127 |
The supply of 1,729 homes works out at about 346 a year, close to three times the last two years' output. That may be achievable if large sites start together, but it is the kind of assumption an inspector tests site by site at appeal.
The Borough Has Been Here Before
In 2016 the Court of Appeal dismissed the council's challenge to an inspector's decision allowing up to 150 homes at Cottage Farm, Glen Road, Oadby. The council had argued for a need of 80 to 100 homes a year; the inspector assessed it at 147 and found a supply shortfall. Lord Justice Lindblom held that the inspector's approach was lawful, since an apportionment of need that had not been agreed or tested at examination did not bind him. National policy has changed a great deal since, but the lesson carries: a council's own lower figure is not the last word when an application is decided.
Where That Leaves Land Today
If a supply below five years were established, it would count under policy S5 of the August 2026 framework as evidence of unmet need, to be weighed rather than treated as an automatic finding. That would give land well related to a settlement's edge a route, provided roads, schools and drainage can cope. It is not the council's position today, and we say so plainly. What already applies across the three towns is policy S4, which covers plots, yards and redundant buildings inside Oadby, Wigston and South Wigston: approval is the starting point, and only harm that would substantially outweigh the benefits justifies saying no.
Six Allocations and Two Green Wedges
The submitted plan allocates land for 3,015 homes, mostly on the outer edges of the towns:
| Policy | Site | Homes |
|---|---|---|
| AP1 | Land north of Newton Lane, Wigston | 900 |
| AP2 | Wigston Meadows phase 3, Wigston | 500 |
| AP3 | Land north of Glen Gorse Golf Course, Wigston | 130 |
| AP4 | Land south of Gartree Road, the borough's part of a cross-boundary area of 4,000 homes | At least 850 |
| AP5 | Land east of Stoughton Road, Oadby | 500 |
| AP6 | Land south of Sutton Close, Oadby | 135 |
The plan describes AP4 as a strategic allocation to be delivered in collaboration with the District of Harborough. For owners of land near the boundary, that means two councils' plans bear on the same new neighbourhood, and each council's examination can change it.
The Green Wedge Review
The borough has two green wedges: one of about 193 hectares between Oadby and Wigston, and about 70 hectares of the Oadby, Thurnby and Stoughton wedge, which runs on into Leicester and Harborough. The council's Green Wedge Review tested them against four purposes: keeping places apart, guiding the shape of growth, acting as a green lung and offering recreation. It recommended keeping 194.1 of the 263.6 hectares designated in 2019, so roughly a quarter would no longer be green wedge. Where a boundary is drawn now matters more to a landowner here than almost anywhere in the county.
The Canal and the Sence
The plan treats the Grand Union Canal as a conservation area and notes that parts of Kilby Bridge, close to the River Sence, are liable to flooding. Land in the south of the borough needs flood risk looked at first; our guide to flood risk and development land explains how the sequential test works.
Leicester's Shortfall and a Paused New Council
The borough sits at the heart of both questions hanging over the Leicester area. On housing, the December 2025 statement of common ground shares Leicester's remaining shortfall among the other districts, an annualised 458 homes a year in all, and gives none of it to Oadby and Wigston, on the assumption that the borough can just meet its own need. If the inspectors conclude the borough must plan for more than 240 a year, or if neighbours will not take its gap, that sharing may have to be revisited.
On governance, the government decided in July 2026 that from April 2028 the whole borough would join a new council covering Leicester, Oadby and Wigston and parts of Blaby, Charnwood and Harborough. The leader, Councillor Samia Haq, said the council was "extremely disappointed". In September the government paused the decision for a review, which the council welcomed, repeating that "we do not believe our borough's future lies as part of a Leicester city authority". For now the borough council decides applications and is taking its plan through examination.
The Land We Look for in Oadby and Wigston
- Yards, garage courts, redundant commercial buildings and former pubs inside Oadby, Wigston and South Wigston.
- Large gardens and backland with a workable access.
- Paddocks and small sites on the edge of Wigston or Oadby, next to existing homes.
- Land beside or near the six allocations, especially around Newton Lane, Stoughton Road and Gartree Road.
- Land close to a green wedge edge, where the review has recommended a new boundary.
Much of what we look at here is brownfield land and yards, where policy S4 already leans towards approval. Wherever we take land on, we fix the price at the outset, fund every stage of the planning ourselves and contribute to your solicitor's and land agent's fees, so getting the legal side done properly costs you nothing. If permission is not secured, you keep your land and owe nothing.
Oadby and Wigston Before Its November Hearings
Hearings From 3 November
The inspectors' hearing programme opens on 3 November with Matter 1, maintaining effective co-operation, then turns to Matter 2, housing need and requirement, which runs into 4 November and, if needed, 5 November, with 6 November in reserve. These sessions will test the 240 figure, the transport evidence behind it, site capacity and how fast the market can absorb new homes. What the inspectors say at the end of them is the most important signal for land in the borough this year.
A Revised Statement of Common Ground
The inspectors' July letter recorded that a revised statement on unmet need was being prepared for publication in September 2026, and they intend to explore it at a focused hearing session. It was not among the examination documents when the council last updated its examination page on 17 September. Whether the neighbouring councils agree to take the borough's gap of 2,533 homes goes a long way to deciding whether the plan can proceed with 240 a year.
Main Modifications and Adoption
On 16 September the council told the inspectors that "it is fully expected that the updated housing position will require main modifications" to the submitted plan. Changes to the requirement or to the allocations would show first in a schedule of modifications, published for comment before the inspectors report. Timing is tight as well: the inspectors noted that a plan ending in 2042 would need to be adopted by the end of March 2027 to look fifteen years ahead from adoption, as national policy expects.
The Next Delivery Test
The Housing Delivery Test 2025 was published on 17 August 2026, and a new one is due each year. At 152% the borough is well clear of every threshold. The next test drops 2022/23, the strongest year in the table above, and adds 2025/26, one of the weakest. Should the result slip under 95%, an action plan would follow; under 85%, a 20% buffer would be added whenever supply is worked out; and under 75%, unmet need would be treated as evidenced under policy S5.
What This Means for Timing
- Sites inside the towns can be looked at now under policy S4, whatever happens at the hearings.
- Edge land and land near a green wedge boundary is best prepared for the hearing outcome and any modifications.
- Not sure which applies? Our free review answers that first, and how it works shows the steps.
Questions About Land in Oadby and Wigston
The council says it has more than five years of land. Can my field still come forward?
Yes, but mostly through the plan. The figure rests on the submitted plan's 240 homes a year, which the inspectors are examining. If the hearings raise the requirement or a supply shortfall is shown, edge land gains weight. Until then, well placed sites are best prepared for the plan stages.
My land is in the green wedge between Oadby and Wigston. Is there any chance?
The review recommended keeping most of the green wedge, but not all of it, and boundaries are settled through the plan. Land at the edge of a wedge next to houses is in a different position from land in the middle. We check where your land falls.
Does the Gartree Road development affect my land in Oadby?
It may. The area is planned for about 4,000 homes across Oadby and Wigston and Harborough, so land beside it will sit next to a new neighbourhood rather than open country. It also changes how the edge of Oadby will look, which matters to any neighbouring site.
I own an old pub or yard in Wigston. Is that worth asking about?
Usually. Inside the towns policy S4 leans towards approval, and a site that already carries buildings starts from a stronger place than an open field. Access, parking and neighbours are the usual questions, and we look at them first.
Will Leicester City Council decide my application after 2028?
Not under current arrangements. The decision to join the borough to a Leicester-based council is paused for review, and Oadby and Wigston Borough Council still decides applications. There is more on the wider county on our Leicestershire page.
Tell Us About Your Land in Oadby and Wigston
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly. We reply within 2 working days, in confidence.
More in Leicestershire
County overview
Selling Land in Leicestershire
Selling land across Leicestershire? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 62%
Selling Land in Charnwood
Selling land in Charnwood? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 86%
Selling Land in Blaby
Selling land in Blaby? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 139%
Selling Land in Harborough
Selling land in Harborough? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 134%
Selling Land in Hinckley and Bosworth
Selling land in Hinckley and Bosworth? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 190%
Selling Land in Melton
Selling land in Melton? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Housing Delivery Test: 184%
Selling Land in North West Leicestershire
Selling land in North West Leicestershire? We agree your price up front and pay for all the planning. If it fails, you keep your land and owe nothing.
Sources
- Oadby and Wigston Borough Council: New Oadby and Wigston Local Plan 2025 to 2042 (updated September 2026)
- Oadby and Wigston Borough Council: Local Plan 2025 to 2042, Regulation 22 submission draft (June 2026)
- Planning Inspectorate: Oadby and Wigston Local Plan examination, inspectors' initial letter (July 2026)
- Planning Inspectorate: Oadby and Wigston Local Plan examination, initial hearing programme, version 1 (2026)
- Oadby and Wigston Borough Council: Updated response to the inspectors' letter (21 August 2026)
- Oadby and Wigston Borough Council: Response to the inspectors' letter (16 September 2026)
- Oadby and Wigston Borough Council: Housing Implementation Strategy 2026, base date 31 March 2026 (September 2026)
- Oadby and Wigston Borough Council: Green Wedge Review (winter 2024 to 2025)
- Leicester and Leicestershire Authorities: Statement of Common Ground relating to housing distribution following the NPPF and new standard method (December 2025)
- [Court of Appeal: Oadby and Wigston Borough Council v Secretary of State for Communities and Local Government [2016] EWCA Civ 1040 (27 October 2016)](https://caselaw.nationalarchives.gov.uk/ewca/civ/2016/1040)
- Oadby and Wigston Borough Council: Leader issues statement after decision on local government reorganisation (July 2026)
- Oadby and Wigston Borough Council: Council leader issues statement on LGR pause (September 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.