Dorset council area
Selling Land in Bournemouth, Christchurch and Poole
Checked on
Bournemouth, Christchurch and Poole delivered just 35% of its housing need in the government's latest test, and by the council's reckoning it holds only 2.55 years of housing land. Planning here still runs on the old plans of Bournemouth, Poole and Christchurch, because the first plan for the combined area was withdrawn in 2025 and its replacement has only just begun.
- We pay for the planning, at our own cost and risk
- Your price is agreed up front, in writing
- If planning is refused, you keep your land and owe nothing
In short
We buy land with development potential in Bournemouth, Christchurch and Poole and welcome land of every kind there: fields and paddocks, inherited land, old yards and larger holdings.
Bournemouth, Christchurch and Poole built only 35% of the homes it needed in the government's latest count, and below 75% national policy treats the need for more homes as shown. It can also show only 2.55 years of the five years of housing land national policy expects. So a well placed field next to a town or village can make its case now, not only through the local plan, though each site is judged on its merits. Land in the Green Belt faces stricter national tests. The plans for its three former areas date from 2012 to 2018, all more than five years ago; a plan submitted in 2024 was withdrawn, and a new one began in October 2026.
We look for 2 acres or more next to, or well related to, a town or village, with a road frontage or a way to get one.
The next step is a free, confidential desktop review. We tell you which route, if any, suits your land, with no obligation.
The Land We Buy in Bournemouth, Christchurch and Poole
- Fields and paddocks on the inland Green Belt fringe of Poole, Bournemouth and Christchurch, especially where roads or housing already enclose them.
- Yards, depots, workshops and commercial plots in Poole, Bournemouth and Christchurch, including those with lawful buildings in the Green Belt.
- Rear plots, garage blocks and oversized gardens in the suburbs that could take two or more homes.
- Land more than 400 metres from the nearest heath, or larger holdings with room for green space alongside the homes.
- Plots whose buildable part sits clear of the floodplain around the harbours and rivers, with a workable way in from the road.
In the towns the work on a site is detailed: title, access, heathland distance, nitrogen credits and neighbours. On the fringe, it centres on the Green Belt case. Either way, we pay for every report and application under an option, with the price fixed before any work begins and pitched above the land's current use value. Our page on brownfield land and yards shows the urban sites we take on, and the paddocks and small sites page covers smaller edge-of-town land.
Is Your Land in Bournemouth, Christchurch and Poole a Good Fit?
You do not need to know the planning rules to sell land for development in Bournemouth, Christchurch and Poole. These are the things that make a site a strong candidate:
- It sits next to, or is well related to, an existing town or village.
- A safe access onto a public road is possible, even if it needs work.
- Most of the land is outside the highest flood risk zone.
- It is not covered by a strong designation such as a Site of Special Scientific Interest.
- It is about 2 acres or more, or part of a larger holding.
- Everyone who owns it is willing to consider one clear, agreed price.
If your land does not tick every box, ask anyway. Many of the sites we take on have a problem to solve, whether that is access, drainage, a tenancy or an awkward boundary, and solving those problems is our job.
Ways to Sell Your Land in Bournemouth, Christchurch and Poole
There are three common ways to sell land with development potential in Bournemouth, Christchurch and Poole. They suit different owners, and the right one depends on whether your land needs planning permission before it is worth more.
- An outright sale. You sell the land as it stands today, privately or at auction. The price is what a buyer will pay for it without planning permission, and the buyer takes on everything that follows.
- A conditional contract. You agree a sale now, but it only completes if planning permission is granted. Until then you keep the land, and the agreement sets out who applies for permission and who pays.
- An option agreement, the route we use. We agree your price at the start, in writing, set above what your land is worth today. We then pay for and run all of the planning work, at our own cost and risk. If permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
For land that needs planning permission before it is worth more, an option means you know your price before any work starts and never spend a penny on planning. The ways to sell land for development, compared sets out each route in full.
Selling Land in Bournemouth, Christchurch and Poole: From First Call to Completion
Selling land for development under an option agreement follows the same steps wherever your land is.
- A first conversation. You call us or send the form on this page. We need only your postcode, your name and a phone number or email.
- A free desktop review. Within a few days we look at your land, the planning position in Bournemouth, Christchurch and Poole and the routes open to it, and tell you plainly whether it suits us. The review is free and confidential, with no obligation.
- Heads of terms and the option agreement. If it suits, we agree a price with you in writing, then the option agreement itself. We contribute to your solicitor's and land agent's fees, so it costs you nothing to get it done properly.
- The planning work, at our cost. We pay for the surveys, the design, the planning application and any appeal. You carry on farming, grazing or letting the land as you do now.
- Completion. If planning permission is granted, we complete the purchase and you receive the agreed price on completion. If it is not, you keep your land and owe nothing.
How selling land for development works, step by step gives the detail of each stage and how long it usually takes.
What the Local Plan Means If You Are Selling Land in Bournemouth, Christchurch and Poole
Three things shape the chances of selling land for development in Bournemouth, Christchurch and Poole: the government's latest count of homes built against those needed, the council's five-year housing land supply, and where its local plan stands.
Housing Delivery Test 2025
35%
Below 75%: treated as having evidenced unmet housing need under national policy S5.
Five-year housing land supply
2.55 years
Short of five years: national policy treats this as evidence of unmet housing need. Position at 1 April 2025, measured against the standard method, 2,958 homes a year, plus a 20% buffer. Stated by BCP Council.
Checked sourceHomes built against homes needed
2,799
of 8,010 needed, April 2022 to March 2025
Most recent strategic plan adopted
November 2018
More than five years old, so its housing figures are usually replaced by the government's standard method.
New plan progress
Latest step
The plan submitted in June 2024 was withdrawn by full Council in June 2025. A new plan formally began on 30 October 2026; the council's timetable puts the content and evidence consultation and call for sites from 9 November to 21 December 2026, the proposed plan consultation from 27 September to 19 November 2027, submission on 31 August 2028 and indicative adoption on 30 April 2029
Checked source
See how Bournemouth, Christchurch and Poole compares with the other 221 councils we cover
Sources: Housing Delivery Test: 2025 measurement, MHCLG, published 17 August 2026; Local plans: monitoring progress, Planning Inspectorate, August 2026. Local plans move quickly, so always check the council's own website for the latest position.
The planning detail in full
Three Towns, Two Harbours and a Ring of Green Belt
BCP Council was created in 2019, when Bournemouth and Poole borough councils were merged with the Christchurch district, while the rest of Dorset formed a separate unitary council. It covers about 162 square kilometres and had an estimated 405,829 residents in 2025, most of them in one continuous built-up area along the coast. Bournemouth faces Poole Bay, Poole sits on the north shore of Poole Harbour, and Christchurch takes in Christchurch Harbour to the east.
- A Green Belt edge inland. The conurbation is bordered by the South West Hampshire and South East Dorset Green Belt, created in stages between 1958 and 1980 to manage how far the towns could expand.
- Protected heaths close to homes. The Dorset heathlands sit so close to the towns that the council publishes a map showing which properties lie within 400 metres of one.
- A harbour that limits nutrients. Poole Harbour was designated a nutrient sensitive catchment for nitrogen and phosphorus on 25 January 2024, so new homes that drain to it must offset what they add.
If you are looking to sell land in Bournemouth, Christchurch or Poole, the first two questions are which former council's plan covers it and which side of the Green Belt line it sits; the heaths and the harbour then decide what a scheme has to carry.
A Housing Land Gap Measured in Thousands of Homes
The council's housing land supply position, based on commitments at 1 April 2025 and covering the five years to 31 March 2030, finds 2.55 years. The calculation runs as follows:
| Step | Council's figure |
|---|---|
| Yearly target | 2,958 homes, set by the government's standard method |
| Buffer | 20%, added because delivery has fallen well below the target |
| Yearly requirement with the buffer | 3,550 homes |
| Five-year requirement | 17,750 homes |
| Supply the council expects within five years | 9,053 homes, its total of planned homes for the period |
| Shortfall | 8,697 homes |
| Result | 2.55 years |
The standard method is the measure because all three legacy plans are more than five years old, and national policy replaces an older plan's housing requirement with the government's figure. On the council's own reckoning, the homes it can identify would meet only about half of what the next five years require, and the council's page states that, because it cannot show five years, the presumption in favour of sustainable development applies, except where specific policies such as the Green Belt protect an area.
A Target That Rose With the New Formula
The target has risen over time. A Dorset Council cabinet report of October 2024 recorded BCP's local housing need at 2,806 homes a year under the method then in force, and noted that the proposed revision would raise it to 2,962. The council's current table works from 2,958, close to that revised figure.
For an owner thinking of selling land for development here, a shortfall of this size means the council has to look well beyond its existing pipeline, and land that was passed over in the old plans deserves a second look.
Delivery Far Below Need, and the Routes It Opens for Land
The Housing Delivery Test 2025 records 2,799 homes built against 8,010 needed over three years, a result of 35%. That places the area in the lowest band of the test, where national policy treats unmet housing need as evidenced. The supply shortfall points the same way: national policy counts it as evidence of unmet need that a decision maker weighs, never as a finding made in advance. Under the August 2026 framework, each kind of land meets a different test:
- Inside the towns. Yards, workshops, garage courts and backland within the built-up area fall under policy S4, where permission should follow unless the harm a scheme causes would substantially outweigh what it brings.
- On the edge, outside the Green Belt. Policy S5 backs housing beyond the built edge where unmet need is evidenced, the land relates well to the town and the infrastructure can serve it, and a delivery result below 75% counts as that evidence. It reaches only edge sites outside the Green Belt boundary, so the policy map comes first.
- In the Green Belt. S5 does not apply. Grey belt land carries its own need test, normally passed through a delivery result under 75% or a supply below five years, and BCP fails both measures. Larger schemes must then meet the Golden Rules, including the higher affordable housing contribution.
Put simply, an owner selling greenfield land on the inland fringe will usually be making a grey belt case, while an owner of a town yard is making an S4 case, and in both the council's own figures support the need for homes, although the heaths and the harbour still apply on every route. Our guide to the 2026 framework explains S4 and S5 in more detail.
Three Legacy Plans, and Why the 2024 Plan Was Withdrawn
Until a new plan is adopted, decisions rest on the plans each former council made before 2019:
| Former area | Main plan in force | Adopted | Other parts still used |
|---|---|---|---|
| Poole | Poole Local Plan, running to 2033 | November 2018 | Dorset Heathlands Planning Framework (2020 to 2025) |
| Christchurch | Christchurch and East Dorset Local Plan Part 1, Core Strategy, running to 2028 | April 2014 | Saved policies of the Christchurch Local Plan of 2001 |
| Bournemouth | Bournemouth Local Plan, Core Strategy | 2012 | Town Centre Area Action Plan (2013) and saved policies of the District Wide Local Plan (2002) |
The Christchurch plan was written jointly with East Dorset, and the two councils adopted it at meetings on 22 and 28 April 2014.
The First Single Plan, and the Duty to Cooperate
BCP Council submitted its first plan for the whole area on 27 June 2024, and the first hearings were held from 21 to 23 January 2025. The plan proposed an average of 1,600 homes a year, which the Dorset Council report put at 1,206 a year below the need then calculated, leaving more than 15,000 homes unmet over the plan period to 2039. The report concluded that Dorset was unlikely to meet any of that need without further work, and that it was preferable for BCP to release Green Belt land alongside any release in Dorset.
The inspectors, Helen Hockenhull and Thomas Hatfield, then wrote to the council, and their main reason for concern was a failure in the duty to cooperate. Local reporting of their letter records that they found no evidence of discussions on strategic housing matters between March and November 2022, and that BCP formally asked Dorset and New Forest councils whether they could take some of its unmet need only two weeks before submitting the plan. The council agreed to withdraw the plan in June 2025, and its own page now states that the withdrawn draft carries no weight in decision making, although some of its evidence may still be relevant.
For landowners, the lesson is that the next plan has to face the gap between the homes needed and the land inside the towns, and the Green Belt is where that will be argued.
Selling Land Near the Heaths or in the Poole Harbour Catchment
The Dorset Heathlands
The heathland rules come from the Dorset Heathlands Planning Framework 2020 to 2025, a supplementary planning document the council still links from its plan pages. The council's guidance for the Poole area puts the rules plainly: residential development within 400 metres of a heath is strictly controlled, and mitigation is needed between 400 metres and 5 kilometres.
Nitrogen and Phosphorus in Poole Harbour
Poole once relied on its own nitrogen reduction document, with mitigation funded through the Community Infrastructure Levy. Natural England advised that the approach no longer matched the national method for calculating nutrients, and from 30 November 2025 the council revoked it in favour of Natural England's nutrient neutrality calculator and developer credits. Every application creating overnight accommodation in the catchment now needs a nutrient neutrality statement and the calculator. A transition period ran until 31 July 2026; from 1 August 2026, every undetermined qualifying application, whenever it was validated, must mitigate through credits.
Rivers, Harbours and Flooding
The council's Gateway 1 summary, written after the 2026 scoping consultation, records that more explicit protection and restoration of Christchurch Harbour and its connected waterways is needed, and that flood risk, drainage and water infrastructure need greater priority. For land near the harbour and the rivers, flood and drainage evidence is therefore likely to carry more weight in the new plan.
None of this rules out a sale. Mitigation is a cost and a design question that we allow for in our review from the start, and we tell you early if the 400 metre line or the floodplain decides the matter.
Timing a Sale While the New Plan Takes Shape
A New Plan for 2029 to 2044
The new plan, prepared under the government's new plan-making system, will set a strategy for the 15 years from 2029 to 2044. Its timetable put the notice to begin plan making on 3 June 2026, and the council records that formal preparation started on 30 October 2026, with government policy expecting adoption within 30 months. The council's timetable sets out the stages:
| Stage | Date in the council's timetable |
|---|---|
| Scoping consultation | 15 June to 27 July 2026 |
| Gateway 1 self-assessment | 30 October 2026 |
| Plan content and evidence consultation | 9 November to 21 December 2026 |
| Gateway 2, assessed by the Planning Inspectorate | 5 April 2027 |
| Consultation on the proposed plan | 27 September to 19 November 2027 |
| Gateway 3, assessed by the Planning Inspectorate | 17 March 2028 |
| Submission | 31 August 2028 |
| Adoption (indicative) | 30 April 2029 |
The Gateway 1 summary notes a clear tension in the scoping responses between those wanting stronger Green Belt protection and those arguing the plan must allow Green Belt release to meet housing need, and lists a Green Belt study among the evidence being prepared.
The Call for Sites of November 2026
The council first asked for sites between 10 July and 29 August 2025, ran a further exercise in July 2026 that brought 34 submissions, and the call for sites was reopened for six weeks from 9 November 2026, with a closing date of 21 December 2026, alongside the plan content consultation. It invites landowners, developers and site promoters to suggest land that may be available for development or redevelopment. Our guide to calls for sites and local plans explains what the council does with a submission.
Delivery, Supply and the Council Itself
The delivery test is published once a year; the latest, the Housing Delivery Test 2025, came out on 17 August 2026. A result of 35% sits far below the 75% line, and we do not predict the next one. The supply position dates from 1 April 2025, so a newer statement is due, and the council says it is updating its housing action plan. As a unitary council, BCP takes the new plan forward for the whole area.
- Urban sites and grey belt land on the fringe can be looked at now, on the figures already published.
- Larger Green Belt holdings that need an allocation belong in the new plan, where the Green Belt study and the proposed plan of 2027 will set the direction.
Questions About Selling Land in Bournemouth, Christchurch and Poole
My field is in the Green Belt north of Christchurch. Does the council's shortfall help it?
It can. S5 stops at the Green Belt boundary, yet the grey belt route asks for proof that housing need is going unmet, and a supply of 2.55 years alongside a delivery result of 35% supplies it. The field must still meet the grey belt tests, and a larger scheme the Golden Rules. Our grey belt guide sets those out.
My land was in the 2024 draft plan. Does that still count for anything?
Not as policy, since the withdrawn draft carries no weight in decisions. The land can be put forward again through the call for sites, and some of the old evidence on it may still help.
Is a plot in Broadstone or Canford Heath too close to the heath to build on?
It depends on the measured distance. Within 400 metres of a protected heath, new homes are strictly controlled; from there out to 5 kilometres, mitigation is a cost rather than a bar. The council's heath distance map shows which side of the line a plot falls, and we check it first.
Would two new homes on a Poole site need nitrogen credits?
Very likely, if the site drains to Poole Harbour, because new homes create overnight accommodation and mitigation in the catchment is now bought as credits. We build that cost into our assessment of the site.
Which plan applies to my land in Highcliffe?
The Christchurch and East Dorset Core Strategy of 2014, with saved policies from the Christchurch Local Plan of 2001, until the new single plan is adopted. Land in Bournemouth and Poole is covered by those towns' own plans.
What price will you pay for my land?
We agree a fixed price with you at the start, before any planning work begins, and it is set above what your land is worth today. We cannot name a figure before we have looked at your land, because it depends on the site itself: its size, its access, how many homes it could take and the costs that come off land value, such as affordable housing, road works and drainage. After the free desktop review we can talk about a price, and once agreed it is written into the agreement.
When would I be paid?
You receive the agreed price on completion, once planning permission has been secured. The agreement sets out the milestones along the way, and it continues while any planning application or appeal is being decided. Until completion you carry on using your land as you do now, and we pay for all of the planning. If permission is not granted, you keep your land and owe nothing.
More Questions Landowners Selling Land in Bournemouth, Christchurch and Poole Ask
The same questions come up wherever land is put forward. Each is answered in full in our guides, and where Bournemouth, Christchurch and Poole stands on housing shapes which matter most here.
Land Agreements · 21 min read
A Land Company Has Written to Me About My Field. What Does It Mean?
Why land companies, promoters and housebuilders write to landowners, how each model works, what replying commits you to, and what the letter does not mean.
Subhan Property Group · Updated 14 November 2026
Tax and Valuation · 23 min read
How the Price for Your Land Is Worked Out in an Option Agreement
How land is valued: existing use, hope and planning value, how many homes a field can take, what a desktop review checks and what a fixed price protects.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
My Neighbour Owns the Next Field. Can We Put Our Land Forward Together?
How neighbouring landowners put land forward together: collaboration and equalisation agreements, land pooling, tax points, and the simpler separate route.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 22 min read
Should I Sell My Land With or Without Planning Permission First?
Selling land as it is, subject to planning, or after getting planning yourself: what each really involves in cost, time and risk, and which suits a field.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 23 min read
Selling Land for Development, Step by Step: From First Thought to Completion
How selling land for development works, stage by stage: title checks, a free review, heads of terms, the agreement, planning, completion and tax.
Subhan Property Group · Updated 14 November 2026
Land Agreements · 20 min read
Who Pays the Fees in a Land Deal: Solicitors, Agents, Surveys and Planning
Who pays the solicitor, land agent, surveys, planning fees, stamp duty and VAT when you sell land to a developer, model by model, with 2026 figures.
Subhan Property Group · Updated 14 November 2026
Selling Land in Bournemouth, Christchurch and Poole? Tell Us About It
It takes about two minutes. We only need your postcode, your name and a phone number or email; the rest helps us look properly.
- We reply within 2 working days, by phone or email, whichever you prefer.
- The desktop review is free and confidential, with no obligation.
- If we agree terms, we pay for all of the planning, which on a larger site can reach £300,000.
More in Dorset
County overview
Selling Land in Dorset
Sell land for development in Dorset: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring council · Homes built: 88% of need
Selling Land in the Dorset Council Area
Sell land for development in Dorset Council: free review, we pay for all the planning, price agreed first. If it fails, you keep your land and owe nothing.
Neighbouring Councils Beyond Dorset
- New ForestHampshire · 1.53 years of housing land
Sources
- BCP Council: BCP Local Plan, overview (checked November 2026)
- BCP Council: Local Plan timetable (checked November 2026)
- BCP Council: Call for Sites (November 2026)
- BCP Council: Local Plan Gateway 1 self-assessment summary (October 2026)
- BCP Council: Withdrawn draft Local Plan and CIL draft Charging Schedule 2024 (checked November 2026)
- BCP Council: Monitoring and information, housing land supply 2024/25 (checked November 2026)
- BCP Council: Local Plan for the Poole area (checked November 2026)
- BCP Council: Local Plan for the Bournemouth area (checked November 2026)
- Dorset Council: Christchurch and East Dorset Local Plan Part 1, Core Strategy (checked November 2026)
- Dorset Council: BCP Council unmet housing need response, Cabinet report (October 2024)
- Advertiser and Times: Council set to pull draft local plan after criticism by inspectors (May 2025)
- Wikipedia: Bournemouth, Christchurch and Poole (checked November 2026)
Figures on this page come from the Housing Delivery Test 2025 (published 17 August 2026) and the Planning Inspectorate's local plan monitoring to August 2026, with newer plan milestones checked on 24 September 2026. We update the page when new results or plan milestones are published. Planning positions change quickly, so always check the council's own website before relying on it.